Rough room water and electricity decoration steps, how to decorate the rough house water and electri

Updated on home 2024-06-29
5 answers
  1. Anonymous users2024-02-12

    The steps and methods of water and electricity decoration of the blank room are as follows:

    1. Circuit installation.

    1. Before the installation of hydropower, there must be strong and weak electricity, and the design and construction drawings of water supply and drainage.

    2. It is forbidden to set the wires without any protection directly in the wall, in the floor, under the floor or on the ceiling.

    3. Lines with different voltages, different circuits, and different signals are strictly forbidden to wear in the same pipe.

    4. The installation of lamps and lanterns should be completed after the paint construction, and the switchgear should be installed on the phase line, otherwise after the switch is off, the lights will still be charged and the electrical equipment will be electrified, which is easy to cause electric shock. If the luminaire uses a screw head, the reed tongue of the screw head should be connected to the control phase wire.

    5. Remember not to connect the wire in the conduit, that is, if the length of the wire is not enough to be wired, the connector of the wire cannot be in the conduit, and it should generally be wired in the junction box such as switches, sockets, lamp head boxes, etc.

    6. The power system should take appropriate protective measures, grounding protection and zero protection, generally take grounding protection, and it is strictly forbidden to use two protection measures at the same time.

    7. The interface of the line should be smooth, the connecting plate should be firm, and it is strictly forbidden to block the wire to block the conduit.

    Second, the installation of waterways.

    1. The hot water faucet in the cold and hot water faucet should be installed on the left side. The electric water heater should have a grounding protection device, which can remove the air in the bile when it is first used, and it can be energized after being filled with water.

    2. The horizontal pipe of the drainage pipe should have a certain slope, and the socket connection should be tight to ensure that there is no leakage. Fixed pipe brackets, elevator spacing reasonable, firm.

    3. The installation of the waterway must be firm and accurate, and the installation position of toilet appliances must also be accurate and firm.

    The villa master provides you with local building policies, building drawings, and villa design drawings;

    Villa appearance renderings service, thousands of popular drawings for you to choose.

    Villa Master.

  2. Anonymous users2024-02-11

    1. First of all, you must have a plan, which places need to be renovated, usually there are bedrooms, bathrooms, living room balconies, etc. [To decorate, find Hujia].

    2. The device of the living room, the device of the living room lamp usually needs to be installed with dual control, and the light is separated from the entry, thinking about the TV wall, dining room socket, etc., and it is best to plan a few more sockets in the living room.

    3. For the planning of the bathroom, you need to think about the exhaust fan, lamp, bath bomb, etc., and there is a very important thing is the electric water heater.

    4. The water and electricity planning of the kitchen usually needs to be renovated in many places, and there are more electrical appliances in the kitchen, so you can do a few more power panels to give the small home the current to meet the direction.

    5. Now that the bedroom has been renovated, the transformation of the bedroom circuit can save some, and the lights inside do not need dual control, if it is some enthusiasts, it can also be transformed more according to their own needs.

    6. In the process of decoration, if you don't have an idea, you can do this, check the neighborhood and their planning, according to the neighborhood planning, learn from the better local area, and go to the dregs of the house to decorate the water and electricity transformation.

    If you have this need, welcome to consult Hujia decoration. There are 22 offline physical experience stores, covering the whole of Shanghai, with 0 additional items for decoration and lifetime warranty for water and electricity concealment projects. One-stop all-inclusive assembly mode, including design, materials, labor, electrical appliances, and engineering quality.

    The expression is not clear enough, too colloquial].

  3. Anonymous users2024-02-10

    To measure the rough room, it is not only necessary to carry out simple data measurement, but also to analyze the advantages and disadvantages of each unit, and make a detailed record of the decoration layout of each interior. The area, length, width, and height of each room should be measured to determine the floor area and the size of the furniture during the later renovation.

    The design scheme is generally determined by the results of measurement and analysis, and is generally carried out by professional designers. When the main decoration of the house is carried out, it is first necessary to determine the style of the kitchen, bathroom, water heater, and practical door. This process requires constant communication and adaptation to integrate with the client's home lifestyle.

    Have your own time.

    As a kind of hidden project, hydropower renovation occupies a pivotal position in the construction, and the lines of each part should be reasonably arranged according to the special needs of the building, and designed according to different lines. If the transformation of hydropower generation is not carried out, it will not only bring great inconvenience to future users, but also bring safety problems.

    In the water and electricity decoration project, the wires must be fixed first, and then the notch. The openings of the pipes must be vertical and parallel, and the design regulations must be strictly adhered to. The height of the tube should be parallel to 60 90 cm and perpendicular to it.

    There are two types of pipes: cold pipes and hot pipes. Concealed pipelines, galvanized iron pipes are strictly prohibited. First, it is up to the construction designer and the owner to negotiate to determine the location and use of the water.

    Arrange for a plumber to drain all taps and places where water is used. If there are architectural drawings, you can follow the drawings to lay them out. If you don't have a full map, contact the owner and increase the positioning of the river.

  4. Anonymous users2024-02-09

    1. You should look at the outside first.

    Inspect facades, exterior tiles and paints, unit doors, stairways.

    2. Then check the inside.

    Inspect the entrance doors, doors, windows, ceilings, walls, floors, wall tiles, floor tiles, water supply and discharge, waterproof water storage, strong and weak electricity, heating, gas, ventilation, smoke exhaust, and exhaust air one by one.

    3. The last measurement is adjacent.

    Problems such as closed water storage tests and water meter idling must be coordinated with upstairs and downstairs neighbors.

    Second, the details of the inspection of the rough house when the house is closed.

    1. Test water and electricity.

    First of all, check whether the readings of water and electricity meters are normal, and if there is a situation where the number is too large, it must be dealt with in time.

    When testing the circuit, the general home decoration will involve the strong current box and the weak current box, to see whether the strong and weak current box installation meets the national norms and standards, whether the distance is more than 1 meter, otherwise it is easy to cause signal interference.

    When inspecting the waterway, we should pay attention to whether the waterway is smooth, you can take a bucket of water, pour it into each floor drain, and see if the drainage is blocked.

    2. Check doors and windows.

    To inspect doors and windows, we must first see whether the glass of the doors and windows has the "CCC" mark, check whether the sealing strips of the doors and windows are intact and undamaged, whether the glass is damaged, whether the switch is smooth and other details.

    3. Check the flatness of the wall.

    Use a ruler to stick to the wall and check the flatness of the wall, and the general gap is reasonable within centimeters. Also, pay attention to the verticality of the yin and yang corners in the room.

    4. Check the squareness of the room.

    This is relatively simple, you can easily use a tape measure to measure the diagonal of the four corners of the room, and generally the error of the length of the two diagonal lines within 5 cm is qualified.

    5. Check the hollow drum on the wall.

    Check all the walls with a hollow drum hammer, note that there can be no more than two hollow drums in a room, and at the same time, you also need to check the floor that needs to be tiled so that it can be repaired in time before decoration construction.

  5. Anonymous users2024-02-08

    Steps to decorate a rough house by yourselfDo you know? Among them, "hydropower transformation" it belongs to the hidden project, but it occupies a very important position in the decoration, I believe that its importance can be understood by all friends, especially water, once an accident occurs, their own losses are not to say, the neighbors are really sloppy, must not be small because of the big loss, safety front! Let's follow us to learn about the relevant content!

    1. In home decoration, it is necessary to involve strong electricity (lighting, electrical appliances) and weak electricity (TV, **, audio, network, etc.). The electric line is generally required to bury the dark line in the modern decoration, and there is a problem with Zhaodan in a town, and it is very troublesome to maintain, so the wire must be selected better. Remember, you can't save this part of the money!

    Second, the selection of wire specifications: in home decoration, according to national regulations, lighting, switches, sockets should use square wires, air conditioning should use square wires, water heaters should use square wires. However, in practice, many people use square wires for lighting wires in order to save money.

    But I advise everyone, don't save it!

    Third, at present, there are many installation methods of electricity, some say that they are looking for 10 yuan square, and there are 12 yuan, and there are 15 yuan, in fact, everyone ignores a key problem, that is, the practice of Yu Ming rent, and now the main practices are:

    1. Functional approach: that is, there is no need to divide into many groups, as long as the purpose of electricity can be achieved, most of this practice is the installation of water and electricity provided by real estate developers for the delivery of the house, and a three-bedroom and two-hall house is divided into 4 groups of lines. This kind of practice is not safe, and everyone knows that all such water and electricity installations must be knocked out and rebuilt.

    This is generally the 10 yuan practice.

    2. Grouping method: grouping means that the lighting of each space should be grouped separately, and the air conditioning of each space should be grouped separately, so that a three-bedroom and two-living room house needs 3 groups of rooms, 1 group of Huaichun living room, 1 group of dining room, 2 groups of two bathrooms, 1 group of kitchen, 3 groups of air conditioning in three rooms, 1 group of air conditioning in the living room, a total of 12 groups of lines, and each group needs a separate air opening control. If you use ordinary PVC pipe threading, it is 12 yuan square labor cost.

    3. Refer to the same practice as 2, with cold bent pipe threading, the labor cost is 15 yuan square, because each elbow needs to use a pipe bender as an elbow, which is very labor-intensive, so it is a little more expensive. More customers choose this method.

    4. Refer to the same practice as 3, if the strong and weak current is divided into slot wiring, you need to add 3 yuan, which is 18, to put it bluntly, it is to add more money for slotting.

    5. The practice of the national standard will be 22 yuan, and the horizontal groove will not be opened at all, only the vertical groove will be opened, which is the practice I want to talk about today.

    Fourth, the basic principles of hydropower construction: go to the top and not go to the ground, the top can not go, consider walking the wall, and the wall can not go, only consider going to the ground.

    The above is the detailed answer about it, I don't know if you are satisfied with our introduction.

Related questions
7 answers2024-06-29

The steps and methods of water and electricity decoration of the blank room are as follows: >>>More

4 answers2024-06-29

The renovation process consists of three stages. At first, it is the design stage, which requires the main decoration designer to communicate to understand the style that the owner likes, and integrate the popular trends into it, and determine the design plan before starting to screen the decoration company. >>>More

11 answers2024-06-29

1. Prepare the tools required for the decoration of the blank room. >>>More

7 answers2024-06-29

The steps and methods of water and electricity decoration of the blank room are as follows: >>>More

11 answers2024-06-29

First of all, it is necessary to clarify the area of the decoration of the rough house: the size of the ground, the size of the wall, the size of the doors and windows, the size of the usable area of each house, and then according to these data, the number of decoration materials that need to be used, the size of the purchased furniture and the area to be reached, and finally a reasonable overall decoration plan for the design of the blank house. >>>More