1. Prepare the tools required for the decoration of the blank room.
Before construction, friends should prepare these kinds of things and put them in the toolbox. Large tape measure (about 5 meters), calculator, and convenience folder (for folders and receipts). Also, it is best to prepare some old towels (soft kind of material, used to wipe down the tiles after pasting) and convenience bags (used on the pipe interface to prevent foreign objects from clogging) on the construction site in the morning.
2. The wall is dismantled and renovated to make the space more spacious.
Wall demolition and renovation is the first project to be done in the decoration of the blank house, and the steps include: demolishing the wall, building the wall, shoveling the wall skin, removing the heating, replacing the plastic steel windows, etc. After the renovation, the garbage must be cleaned up in time to keep the room clean, mainly to facilitate the construction.
At this time, it is time to settle the finished door, and it is best to order cabinets, hoods, stoves, water heaters, etc.
3. Pay special attention to the renovation of water and electricity in the decoration of the rough house, and plan the use of each space.
After the hydropower transformation, there is no regret. Once the bricks are built on the wall and the ceiling is installed, it is not easy to add a socket position. Therefore, be sure to calculate the exact location of switches, lamps, basins, bathtubs, washing machines, etc.
There is also a water and electricity renovation must be present to watch the decoration master construction, after the completion of the acceptance of the personal acceptance. Before the hydropower transformation, it is reasonable to arrange the first measurement at the door, and first determine the transformation plan of the power supply and waterway. For water heaters, it is also best to arrange a specialist to measure the model of the equipment you purchase, and calculate the direction of the power supply and interface.
4. Wrap riser and tiling.
Thinking of the damp and humid environmental conditions in the bathroom, the material of the riser must not use the wooden keel, everyone must be careful, even if the wooden keel is brushed with anti-corrosion materials. Be sure to use light steel keel or red brick for the riser. The light steel keel is small and space-saving, and the strongest and most easy to use must be red bricks.
5. Finally, it's time for the painter to go into battle, scrub scrub scrub oh oh If you don't buy a finished door, then let the construction master customize one.
Now the paint is mixed with oil, basically no brushing, all with spray drops. It should be noted that asking the master to help spray the inside of the door and the meter box with white color is not as good as not wasting and is very beautiful. There is nothing special to say about painting the wall, leveling, grinding, and rolling brushes, whether the effect is good or not, and it depends on the craftsmanship of the oiler master who is looking for.
If the wall is to be painted, you must pay attention to the color when mixing the color, the color should be lighter than the color card paper, and it must not be the same as the color card or dark with the color card, otherwise you will regret it. That's because when painting the wall, it takes at least two topcoats, and in some places more than three times, the color of the wall will be dark.
-
1. Preliminary work: First of all, it is necessary to determine the relevant design plan and budget with the decoration company, and only after confirming that it is correct, can the decoration contract be signed2. Main body transformation:
The main body transformation is the demolition and reconstruction project of the main body; 3. Hydropower construction: In the process of construction, a certain distance should be maintained between the lines, and the wiring should be horizontal and vertical; 4. Basic project: This mainly includes the mud stage and the painting stage; 5. Installation engineering.
-
Cheng I. Material Preparation & Approach 1Material Preparation According to the design plan, clarify the area involved in the renovation process. In particular, the area of tiles, wall paint, flooring, etc., as well as various needs.
-
Rough house decoration steps First of all, buy decoration materials, including wires or flooring, or marble, or buy lamps, the first step is to ask an electrician to install wires, and find a bricklayer and carpenter to design the house, of course, buy some things such as toilets, you can ask the decorator step by step what accessories to buy.
-
Step 1: Define the dimensions of the house and the renovation of the main body. Before the renovation, the area of the rough house should be accurately measured, and then the drawings can be planned, and if there is a need for demolition, it can be carried out first.
Step 3: Tile it. Bathrooms, kitchens and balconies need to be tiled.
Step 4: Suspended ceilings and walls.
-
The steps and methods of water and electricity decoration of the blank room are as follows:
1. Circuit installation.
1. Before the installation of hydropower, there must be strong and weak electricity, and the design and construction drawings of water supply and drainage.
2. It is forbidden to set the wires without any protection directly in the wall, in the floor, under the floor or on the ceiling.
3. Lines with different voltages, different circuits, and different signals are strictly forbidden to wear in the same pipe.
4. The installation of lamps and lanterns should be completed after the paint construction, and the switchgear should be installed on the phase line, otherwise after the switch is off, the lights will still be charged and the electrical equipment will be electrified, which is easy to cause electric shock. If the luminaire uses a screw head, the reed tongue of the screw head should be connected to the control phase wire.
5. Remember not to connect the wire in the conduit, that is, if the length of the wire is not enough to be wired, the connector of the wire cannot be in the conduit, and it should generally be wired in the junction box such as switches, sockets, lamp head boxes, etc.
6. The power system should take appropriate protective measures, grounding protection and zero protection, generally take grounding protection, and it is strictly forbidden to use two protection measures at the same time.
7. The interface of the line should be smooth, the connecting plate should be firm, and it is strictly forbidden to block the wire to block the conduit.
Second, the installation of waterways.
1. The hot water faucet in the cold and hot water faucet should be installed on the left side. The electric water heater should have a grounding protection device, which can remove the air in the bile when it is first used, and it can be energized after being filled with water.
2. The horizontal pipe of the drainage pipe should have a certain slope, and the socket connection should be tight to ensure that there is no leakage. Fixed pipe brackets, elevator spacing reasonable, firm.
3. The installation of the waterway must be firm and accurate, and the installation position of toilet appliances must also be accurate and firm.
The villa master provides you with local building policies, building drawings, and villa design drawings;
Villa appearance renderings service, thousands of popular drawings for you to choose.
Villa Master.
-
The steps and processes of rough room decoration are still very simple, and you can find a professional decoration design company, so that you can do it.
-
First of all, it is necessary to clarify the area of the decoration of the rough house: the size of the ground, the size of the wall, the size of the doors and windows, the size of the usable area of each house, and then according to these data, the number of decoration materials that need to be used, the size of the purchased furniture and the area to be reached, and finally a reasonable overall decoration plan for the design of the blank house.
After you have the overall decoration plan, it is time to consider the specific decoration. Some owners will demolish and modify the main wall before decoration, including wall demolition, wall building, shoveling wall skin, plastic steel windows, etc., and clean up the garbage in time after the demolition and modification to facilitate subsequent construction. Spell Dog Tips:
All demolition and renovation projects need to be planned by the designer, and can only be implemented without affecting the overall safety of the house and normal life in the future.
After the renovation of the house layout is completed, it is the most basic and important water and electricity layout of the house. Before making the layout of water and electricity, it is necessary to make a preliminary plan for the approximate placement and size of furniture and appliances in the house, so as to reasonably plan the number of sockets and save costs. In addition, the water and electricity engineering of the kitchen and bathroom is the top priority, and it is necessary to measure the basic good size and precise placement of cabinets, range hoods, electrical appliances, lamps, basins, bathtubs, washing machines, switches, etc.
After the completion of the water and electricity layout, it is necessary to start the basic decoration of the house, there are many steps of basic decoration, and the time point of entry is different, so it is necessary to plan out the order of the decoration workers in advance. Generally speaking, the basic principle of which dirty is followed in the basic decoration is which is the first field. So the approximate order is:
First of all, the mason master does the tile paving of the ground and wall; Then there is the carpentry to design the furniture according to the size; Finally, the painters come in. Spell dog warm reminder: If the furniture is customized and purchased according to the size of the mall, the carpentry step can be basically omitted.
After the completion of the house foundation decoration project, it is the final installation of the house doors and windows, and the cabinets need to be installed together in this process. Installing cabinets is a coordinated project, and it is best to make an appointment in advance for a range hood, stove and sink so that they can be installed on the same day.
-
Generally speaking, the renovation period is about 45-50 days, and you can also learn about several decoration modes that are currently prevalent. Decoration is divided into three ways: package cleaning, half package and full package.
After the decoration company is selected after the plan is communicated and discussed, it will enter the stage of plan communication with the designer. You need to provide the designer with a floor plan of your house and tell him what you like (e.g. red or a certain piece of furniture), what you want (you need a study or bar), and what you have an approximate budget.
There are four main types of construction work: carpentry, bricklayer, oilman, and plumber. Even if you choose a brand decoration company, you don't have to worry too much about the construction, but you should pay more attention to your love nest.
-
The decoration process of the rough house is as follows:
Stage 1: Preliminary Preparation.
Including measuring the room, making the design plan, making the elevation model drawing, and finally producing the decoration renderings and construction drawings. While repeatedly communicating with the designer and modifying the plan, the owner can make a decoration budget table and a timetable of the purchase progress of decoration materials.
The second stage: demolition and modification stage.
It takes three or four days to demolish and renovate the wall and top surface of the normal house, and it takes a week to remove and transport the construction waste and build the new wall, and in general, this step takes 9 13 days.
The third stage: hydropower transformation.
As far as ordinary houses are concerned, hydropower renovation requires the design of routes, slotting, overall pipe laying and final acceptance works. While the workers are doing this series of things, the owner can choose some tiles and other things, and the whole process will take about a few days.
Stage 4: Bricklayer construction.
There are a lot of things that need to be done in this part of the bricklayer, such as filling the trunking, waterproofing the kitchen and bathroom, paving tiles, and closing water experiments, etc., which takes about 10 days, and the owner can buy hardware and sanitary ware during this time.
Stage 5: Suspended ceilings.
It takes about a week to install the ceiling, and at this time, the construction master can install the wooden door at the same time and prepare some hardware accessories that are needed.
Stage 6: Oilman.
At this point, the construction process is basically coming to an end, at this time, you can scrape putty first, polish and then paint the wall. At the same time as the construction, the owner can purchase furniture and electrical appliances, and this stage of work will take about half a month.
Stage 7: Final installation.
Finally, it is the overall installation and soft decoration stage of the home, which basically includes the installation of floors, cabinets, sanitary ware, switches and sockets, lamps and other items, which takes about 15 days and 20 days.
After completing the above decoration process, everyone can move to a new house and live in a new house!
-
Rough room decoration steps process flow
1. Before decorating the house, you must first understand the precautions for house decoration to avoid damaging the house during the decoration process. Next, measure the size, length, width, and height of each room in the house to determine the floor area and the dimensions of the furniture for subsequent renovations.
2. The layout of the house can be redesigned according to your preferences. The main body of the house was rebuilt, mainly for walls, walls, doors and windows, and demolition. At the same time as the main body remodeling, it is possible to determine the style of kitchen utensils, water heaters and utility doors.
3. After the renewal and transformation of the main body of the rough embryo house, the next thing to do is to carry out the hydropower decoration project. Hydropower decoration project is the first of the key new projects in the rough house decoration process and steps, if the hydropower decoration is not done well, in the future daily life, it will produce a lot of inconvenience to the owners of the community, and even lead to safety risk problems.
4. Use moisture-proof decorative materials to install pipes into the room. This step is often referred to as "assurance". Otherwise, exposed pipes are prone to damage, leading to their improper use and degrading the whole to a certain extent. The aesthetics of house decoration.
5. After the water and electricity pass, the bathroom and kitchen need to be waterproof. In waterproofing works, the original waterproofing layer must be kept intact and made into a double-layer waterproof structure. There is a problem with the waterproofing layer, and the initial waterproofing layer of a rough house can also act as a waterproofing layer.
6. Choose a professional bricklayer to lay bricks. When laying tiles, it is necessary to strictly follow the construction requirements, otherwise cracks and cracks in the tiles may appear. As a rule, after laying the tiles, many people choose to make tile joints and add that decoration.
7. After the tiles are finished, you can paint or lay wallpaper on the wall. Before wall decoration, you should level, polish and paint the wall. Otherwise, after laying wallpaper or painting, it is easy to cause the material to fall off or bulge, reducing the quality of decoration.
8. After confirming that the ground and wall are working, you can start to install the indoor socket. At the same time, pre-picked kitchen utensils, doors and windows, and water heaters will be installed. If your house space allows, you can also start preparing the ceiling of your house.
9. After completing all the above procedures and procedures for damaging the room, you need to clean the house. Usually this stage is called wasteland cleansing. After cleaning, you can move the purchased furniture to your new home in advance. After removing the formaldehyde from your new home, you can check in directly.
The steps and methods of water and electricity decoration of the blank room are as follows: >>>More
The steps and methods of water and electricity decoration of the blank room are as follows: >>>More
The renovation process consists of three stages. At first, it is the design stage, which requires the main decoration designer to communicate to understand the style that the owner likes, and integrate the popular trends into it, and determine the design plan before starting to screen the decoration company. >>>More
First of all, it is necessary to clarify the area of the decoration of the rough house: the size of the ground, the size of the wall, the size of the doors and windows, the size of the usable area of each house, and then according to these data, the number of decoration materials that need to be used, the size of the purchased furniture and the area to be reached, and finally a reasonable overall decoration plan for the design of the blank house. >>>More
Precautions for the delivery of rough houses: (1) First check the developer's "Residential Quality Assurance Certificate", "Residential Instruction Manual", "Construction Engineering Quality Certificate", "Real Estate Development and Construction Project Completion Comprehensive Acceptance Certificate" and "Completion Acceptance Record Form". (2) Inspect the house first and then go through the procedures. >>>More