How do novices know if the bathroom waterproofing is done well? What should I do about the waterproo

Updated on home 2024-07-14
11 answers
  1. Anonymous users2024-02-12

    How to measure moisture in the bathroom; Doing a irrigation test is a common way to measure the waterproofing of the bathroom: first plug the floor drain in the bathroom and make a sunny corner strip to avoid the water storage flowing out; Then store water in the bathroom, generally 3 to 5 cm, and do a good job of marking the water line; Wait for a day to see if the water storage in the bathroom has been reduced, and go downstairs to see if there is water seepage. What should be paid attention to when doing waterproofing in the bathroom; Although it is necessary to do a water filling test in the bathroom, do not be overly anxious.

    After the waterproofing is done in the bathroom, it is necessary to wait for a period of time for the waterproof coating to dry, and then carry out the waterproof test, which can prevent the waterproof coating from being destroyed.

    In the case of irrigation test, the owners of the community, the property management, and their downstairs neighbors must work together to see if there will be water seepage, if they pass the inspection, there will be no water seepage, they must sign the agreement together, stating that the acceptance is qualified, and if the water seepage, it is necessary to immediately carry out rectification.

    In the case of irrigation test, in order to make the test information more accurate, the pipes and anti-odor floor drain in the toilet must be plugged so that it is not easy to seepage, and the water flow rate should be controlled at 3 to 5 cm to reduce the deviation of the experiment as much as possible. In the case of new buildings with interior decoration, it is not necessary to immediately throw away the bags and barrels of waterproofing paint, which will be applied during the irrigation test. The bags are filled with gravel to plug the sewer pipes, and the buckets are used to boil the impact of the running water on the vapor barrier.

    Brush the second waterproof material 'Note, the second waterproof material must have a certain interval between the time, after the architectural paint can be carried out after drying, the specific time depends on the architectural coating. If the spacing time is too short, the actual effect of waterproofing will be reduced. laying a protective layer; In order to avoid future operations destroying the ground waterproofing, the surface of the waterproof material needs to be paved with a protective layer.

    The protective layer should completely cover the ground and waterproof, without neglect, and be solid with the bottom layer, no cracks, no bubbles, and no peeling.

  2. Anonymous users2024-02-11

    Just turn on the water and try it, that is, turn on the faucet in the bathroom directly to see where the water flows.

  3. Anonymous users2024-02-10

    Toilet waterproofing practices require us to carefully supervise construction workers and try to avoid leaks. Before construction, ensure that the construction site is clean and dry, and the waterproof coating should be coated with no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off. The coating height is consistent, and the thickness should meet the requirements of the product.

    During the closed water test, the water at the highest point of the ground should not be less than 2 cm, and it should be stored for at least 24 hours, and it will be qualified only after observing that there is no leakage. If there is a leak, it needs to be redone, and it must not be negligent.

  4. Anonymous users2024-02-09

    The closed water laboratory of the restroom is the most effective in checking the waterproofing effect of the restroom. Therefore, it is necessary to grasp the basic process of closed water test. And you should look at whether the waterproof material is fully utilized.

  5. Anonymous users2024-02-08

    Everyone knows that when decorating the toilet at home, waterproofing is a particularly crucial step. After all, there is a lot of water here every day. If you don't do waterproofing seriously, it will be a lot of trouble to use, and it will also cause trouble to your neighbors.

    So in order to be able to check whether it is doing well or not, it is necessary to do itToilets are waterproof and water-closedTest. So what should be done about this correct method? When is the most appropriate time to do it, I will explain it to you below.

    Usually, as long as the waterproofing of the toilet is done, it can start after 24 hours. Before the test, check it to see if there are any cracks on the surface and whether it is flat. If there are any corners of the pipe that need to be repaired in all places, see if the waterproofing layer is completely dry.

    Toilets are waterproof and water-closedWhen testing, if the downstairs neighbor has already moved in, then say hello in advance and take precautions. If there is water seepage, stop the test immediately and carry out the test after repair.

    During the test, the depth of water discharge should not be lower than 20 mm, and the time should be enough for 24 hours. At the end of the day, there was no noticeable decrease in water. At the beginning of the test, I had to go downstairs once an hour to check it out.

    After the halfway point, go downstairs every three hours to check. If a leak is found, the test should be stopped immediately. After the waterproofing layer is repaired, the test is carried out.

    1. The floor drain of the toilet must be blocked strictly, and there can be no leakage.

    2. If the floor level of the toilet is the same, cement should be plugged at the door. However, be sure to wait until it is dry before starting to release the water.

    3. Put a small basin or mat under the water flow to avoid damaging the surface.

    Toilets are waterproof and water-closedTesting is very important, and it must be done carefully when installing toilets. In this way, you can feel more at ease after entering.

    You can get it for free

  6. Anonymous users2024-02-07

    As an important part of testing waterproofing, the closed water test is indispensable. The most important problem in bathroom decoration is the waterproofing of the bathroom, and the quality of the waterproof effect of the bathroom will affect the use of the bathroom in the future, and even affect the neighbors around the neighbors. Therefore, we usually use a closed water test when testing the waterproof performance of the bathroom.

    What should I do about the closed water test?

    Before starting, the three parties go downstairs together to check whether there are any traces of water on the top surface.

    Block the drain and doorway, and then release the water, the water storage depth should not be less than 2 cm, the height of the water storage wall is generally 3-10 cm, and mark the wall. In the early stage of the water storage test, you should go downstairs to check once every 1 hour, and in the later stage, you should go downstairs to check every 2-3 hours. If water leakage is found, the water storage test should be stopped immediately, the waterproof layer should be re-improved, and the water storage test should be carried out after the treatment is qualified.

    After 24 hours, the three parties went downstairs to check that there was no trace of leakage, and there was no obvious drop in the water surface of the water storage to be qualified.

  7. Anonymous users2024-02-06

    We all know that the bathroom is a very wet place, the ground is wet, we can use a mop to mop clean, but there will always be a part of the water, will seep down the small gap of the floor tiles, over time, it will form a water leakage, affecting themselves and the residents downstairs, therefore, it is very important to do waterproof engineering, so how to do the bathroom waterproof detection? Let's take a look at those who don't know yet! We all know that the bathroom is a very wet place, the ground is wet, we can use a mop to mop it clean, however, there will always be a part of the water, will seep down the small gap of the floor tiles, over time, it will form a water leakage, affecting themselves and the residents downstairs, so it is very important to do waterproof engineering, thenBathroom waterproofing detection how to do1. How to do the waterproof testing of the bathroom

    Bathroom waterproof testing.

    1. Waterproof treatment is a project with waterproof effect, and usually after this project is completed, if a certain measurement method is not taken, it is difficult to see whether its waterproof effect is good or not, and if the bathroom waterproof detection is not accurate, it will also affect the waterproof problem in the future, therefore, it is very important to carry out the closed water test correctly.

    2. The specific method, I will carefully explain here, after the completion of the waterproof treatment, after the protection of the twenty-four, you can do the bathroom waterproof test, floor drain, pipe mouth around the temporary blocking, toilet door to build a temporary retaining wall (20-25), waterproof to 5-20 cm, and do a good job of water level marking.

    When the waterproof test of the toilet is in progress.

    3. Water storage is the key to the test, mainly to see if the water level line has dropped, the duration is one to two days, after a few days, if the water level line has dropped significantly, you should check whether there is leakage around the wall and the ground, and see if there is water seepage from the ceiling downstairs, if not, continue to close the water, and complete the water closure the next day, and comprehensively check the downstairs ceiling and roof pipe perimeter.

    2. Precautions for closed water experiment

    1. Some people say that the closed water test is not the decoration master will do it, you may not know, the waterproof project should be done on the floor tiles, some engineering teams are fast, and will not carefully do the waterproof test, so when handing over the house, we can ask the property management company to do a bathroom waterproof test again, once the problem is found, you can postpone the house.

    Toilet waterproof testing project.

    2. Before the test, it is necessary to make preparations, the toilet with water storage is equivalent to a large pool, in order not to affect the accuracy of the test, it is necessary to clean up before discharging the water, and the pre-embedded nozzle and the inlet and outlet are temporarily blocked.

    Conclusion: Therefore, even if the master has done a good job of waterproofing engineering, the subsequent testing items cannot be missing, as introduced aboveBathroom waterproofing detection how to doI believe that everyone has learned, the next time you encounter the decoration of the bathroom, there will be a chance to use, it is very important to master the closed water test process and key points, so that you can reduce a lot of unnecessary trouble in the future.

  8. Anonymous users2024-02-05

    Closed Water Test Specification:First of all, it is necessary to block the floor drain in the waterproof layer area, and then stir the door with yellow clay and cement trembling mortar to make a water retaining strip about 25cm high.

    Start to release water on the ground, and the depth of the water can reach 5-20cm; After 24 hours of water storage, go to the corresponding bathroom location of the downstairs neighbor's house to check whether there is leakage on the floor slab, and re-do the waterproof layer if there is no leakage until there is no leakage at all; After the surface bricks are laid, the closed water test can be redone according to this method.

    Precautions for closed water test.

    1. The closed water test must be started only after the waterproof is completely dry.

    2. When doing the closed water test, the owner himself had better check with the property department and the downstairs neighbors to check whether there is any water leakage.

    3. The closed water area and floor drain should be blocked and kept in a state of no water leakage, otherwise it will affect the experimental effect.

    4. When doing the closed water test, the position of the door needs to make a stall, otherwise when the water surface height reaches a certain height, the water will run from the door.

    5. Put a cover or basin under the faucet or water pipe to alleviate the impact of small water flow on the waterproof layer and reduce the damage of the waterproof layer.

    6. When painting waterproof materials, do not discard the bags and waterproof barrels of waterproof coatings, which can be used in closed water tests, among which the packaging bags are suitable for blocking the sewer pipes, and the buckets can be used to reduce the impact of the waterproof layer on the waterproof layer.

  9. Anonymous users2024-02-04

    The waterproof and closed water test of the toilet is to test the waterproof effect of the toilet and ensure that there will be no water leakage during use. The specific method of making sedan cars is as follows:

    Close all drains and sewers in the bathroom to ensure that water does not flow out.

    Place a certain amount of water (usually 5cm-10cm) in the bathroom and let the water sit for 20-30 minutes to check for leaks.

    Check whether there are signs of water leakage in the corners of the bathroom, the junction between the ground and the wall, the bathtub, the glass glass in the shower room, the toilet and other parts, and if so, it needs to be re-waterproofed.

    Repeat the above steps until you have confirmed that the restroom is waterproof and leak-free.

  10. Anonymous users2024-02-03

    1.Plug the floor drain, before releasing the water, you must first plug the floor drain, otherwise all the water will flow away.

    2.In order to store water and not flow away, it is necessary to wipe a temporary water barrier with cement mortar at the door of the bathroom.

    3.Water storage, now you can start to release water, pay attention when releasing water. If the outlet is a certain distance from the ground, put some buffers on the ground to prevent the water flow from washing away the waterproof layer.

    Don't store too much water, a height of 3 5cm is enough. Once you've filled up the water, remember to mark the water level.

    4.Waterproof detection, after the water is stored, pay attention to the water level mark you made, whether there is a significant drop in the water level. If so, go downstairs immediately to see if there is a water leak.

    If there is no obvious water leakage, wait for 24-48 hours, and then go downstairs to confirm whether there is a water leakage, at this time, even if you find a little water stain, it is waterproof and not done well, you need to repair the leakage again, and then do a closed water test.

    In addition, it is necessary to keep the water unobstructed. All sewer pipes in the bathroom, including floor drains, plumbing pipes for sanitary ware, etc., should be kept unobstructed. In this way, flooding can be avoided in the first place.

  11. Anonymous users2024-02-02

    How should the bathroom be inspected for waterproofing? Is it really water-free? So we have to think of all kinds of ways to do a good job of waterproofing the bathroom.

    For example, now a friend asks such a question: how to make the bathroom waterproof so that it does not leak? Base treatmentBefore waterproof construction, it is necessary to do a good job in the base treatment of the wall, and ensure that the surface is solid, free of chalking, peeling, bulging and other phenomena.

    At the same time, the surface of the base layer must be clean and free of any debris stains such as dust, release agents, etc., that affect the adhesion of the paint. The waterproof layer in the non-shower area should not be less than 35cm. Meow said that if the decoration budget is sufficient, it is recommended that the waterproof height of the entire bathroom be 180cm.

    Another is that the thickness of the waterproof is as long as it is required according to the national standard, and the number of brushing is not less than twice.

    <> Zuogong brand polymer cement waterproofing slurry is a two-component waterproof slurry made of high-quality polymer emulsion and inorganic silicate cementitious material as the main raw material, adding a variety of additives, fillers and natural inorganic aggregates. After the toilet is renovated with water and electricity, before doing the waterproof project, we must first carry out the basic treatment of the bathroom, especially the slotted place, we must carry out special treatment to prevent water seepage due to improper treatment of the trunking when applying waterproof coating. In order to rush the construction of waterproofing, many people often start without waiting for the cement of the screed layer to dry completely.

    Under normal circumstances, it takes more than 7 days for the screed cement to dry. If you apply waterproof material before it dries, the waterproof layer may crack and peel.

    Most of the bathrooms in the house are sunken now, and it is recommended to enter the water and drain the ground when taking water and electricity. The advantage is that the water inlet is relatively complex and there are many elbows, and even if the water leaks in the upper part of the integrated ceiling after the day, it is convenient for inspection and maintenance. The bottom of the first pool should be good cement sand, the cement sand should be thicker, the surface is calendered, sloped, the bottom of the pool does not hide water, and then use the panther waterproof brush twice, the yin corner should be brushed more only a thin layer, not the thicker the better, remember to brush the joints several times, these are the most prone to water seepage.

Related questions
16 answers2024-07-14

Bathroom leakage generally does not involve the wall, if you knock on the wall, you only need to pay attention to whether it is a load-bearing wall. However, the waterproofing of the ground should be expanded. The location of the bathroom after expansion must be waterproof!

14 answers2024-07-14

Directly on the waterproof paint. And I personally recommend that in the shower room, a position with a lot of water, don't brush to a meter as required, and brush it directly to the top. Stay on the safe side.

6 answers2024-07-14

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

15 answers2024-07-14

1.Polypropylene cloth waterproofing is a waterproofing membrane. >>>More

18 answers2024-07-14

What should be done about the waterproofing of the bathroom? >>>More