What should a plumber be responsible for installing?

Updated on society 2024-07-03
14 answers
  1. Anonymous users2024-02-12

    First: Mainly engaged in water, electricity and public facilities in property projects.

    maintenance of equipment and daily operation management of public equipment;

    Second: For example, you need to do the maintenance work of the property plumber and electrician

    1. Maintenance of the common parts and public facilities of the residence.

    2. For residents who request maintenance projects to dredge water holes, sewers, toilets, and roof leaks, regardless of the first consultation or contact, they should be warmly received, patiently publicize and explain, and listen to the residents' maintenance contacts and repair practices.

    3. In accordance with the scope of household maintenance projects, timely, serious and service in place. Dredging water holes, sewer toilets, contacting at any time, and providing door-to-door service at any time to satisfy residents.

    Fourth, no matter how big or small the maintenance project, the implementation of unified management, first registration, first payment and then maintenance, after the charge issued vouchers. Put an end to the phenomenon of repairing first and then charging.

    5. After the completion of the maintenance of large and small projects, organize personnel to carry out acceptance on site and inspect the quality of the project in a unified manner. Submit it for inspection if it meets the quality. If it does not meet the quality requirements, it will not be accepted.

    6. Strictly control all kinds of raw materials and maintenance costs, and control the maintenance indicators of various departments at the beginning of the year.

    7. Complete the temporary assault tasks assigned by the leader.

  2. Anonymous users2024-02-11

    The sink is installed by the seller, the panel, and the faucet are all plumbers, and it is recommended that the bathroom shower must be bought first, so that the plumber can be accurate to the position, otherwise it is easy to look high and low. Generally, the large crystal lamp, the plumber master does not help you install it, it is easy to have problems, and the seller is generally directly responsible for the installation.

  3. Anonymous users2024-02-10

    The kitchen sink installation is installed with cabinets, and the faucets and showers are all electrician-equipped and included in them.

  4. Anonymous users2024-02-09

    Hello dear<>

    1. What are the contents of hydropower installation? Normal includes slotting, wire laying, waterway layout, pipe repair groove, switch socket and lamp configuration, sewer pipe arrangement, main water pipeline installation, distribution box main circuit setting, roof drainage, exhaust and so on. During the construction of hydropower and electricity, it is necessary to determine its direction according to the design drawings of the house and the needs of customers, and then the workers groove the wall and the ground according to the direction, and then bury the pipeline and the cassette, and then check the circuit and carry out the pressure test on the waterway, and then use cement mortar to smooth the trunking, and finally wait for the wall and wallpaper to be paved to do the configuration of the circuit panel. Second, what are the points of attention to in the construction of hydropower renovation 1, when slotting holes, do not damage the original wires and water pipes, the wires must be routed, but can not directly bury the pipeline into the ground or the wall, so that not only there is no way to ensure safety, but also damaged is inconvenient to maintain, pay attention to the water pipe installation must be carried out after the pressure test, to ensure that the construction can be continued after the qualification, so as to avoid water leakage caused by damage.

    2. The kitchen and bathroom must pay special attention to waterproofing projects, and the closed water test must be carried out after completion to ensure that the tiles are paved after reaching the standard. 3. The wire joints should also be waterproofed, and they can be wrapped with black tape with excellent viscosity. 4. The circuit construction must meet the standards, such as the wire pipe with a diameter of 16 mm can be configured with up to 3 wires, and the spacing of strong and weak wires should exceed 50 cm, so as to avoid the signal being disturbed.

  5. Anonymous users2024-02-08

    The hydropower project in the interior decoration is a hidden project, and the materials and construction should be selected to avoid burying hidden dangers in the subsequent home life. Therefore, it is very important to look for reliable workers in hydropower construction. So, what are the specific tasks of hydropower installation workers in **?

    Let's take a look at the relevant introduction.

    First, the water and electricity installation workers are looking for **.

    1. Visit the community construction site.

    The simple and straightforward way is to visit the renovation sites in the community. When the owners of the community begin to complete the decoration, you can learn about other people's hydropower masters hired from **, and observe the construction process of the hydropower masters. Secondly, you can go to the residential construction site developed by the real estate developer and have a face-to-face conversation with the hydropower construction master of the foundation engineering construction.

    2. Ask the material merchant.

    If the water pipe and wire manufacturer can be trusted, you can directly call their after-sales service to inquire and ask them to help introduce the plumber master.

    3. Search online.

    You can search for plumber masters in the same city on the Internet, you can see some very useful information, and even you can call to ask, and you can also find reliable plumbers through platforms such as Tieba and TikTok.

    4. Find a professional decoration team.

    The way to save trouble is to find a professional decoration team, you can search from the Internet or inquire through acquaintances, and you can also go to a nearby decoration company to see which decoration team is better. After the decoration team is confirmed, the plumber master and electrician master are all there, which is more convenient.

    Second, what work is specifically responsible for hydropower installation.

    1. Change the water. Generally, the place that needs to change the water is the kitchen and bathroom, if the location of the shower or faucet is not the same, the location of the water change is also different, therefore, it needs to be modified in advance, the purpose is to install the bathroom after the bathroom is beautiful and there will be enough activity space.

    2. Change the battery. Everyone's lifestyle is different, so it can be changed according to your usual habits. For example, the location of the power supply can be installed next to the bed, where the air conditioner is installed, or where you want to put the refrigerator, etc.

    It is better to change a few power supplies at home, and it is more convenient to use, but if there are children at home, it is better to change the position of the power supply to a higher level or take some safety measures.

    3. Opening the line slot.

    After determining the location of the power supply, it is to open the wiring slot, which can only be completed by professional decoration plumbers. The machine that uses the open trunking is also more dangerous, so no matter who uses it, you should also pay attention to safety. Which is the live line and which is the zero line, in relatively large electrical appliances, there must also be a bottom line, etc.

    The above is all the content of Guan Qing search in the hydropower installation workers in **, what work is specifically responsible for hydropower installation, I hope to help you understand the water rotten shouting electricity workers, more decoration knowledge, decoration company evaluation, decoration cases, please continue to pay attention!

  6. Anonymous users2024-02-07

    1. Pipe slotting.

    When installing hydropower, the first thing is to need pipe slotting, which includes two aspects, one is water pipe slotting, and the other is wire line slotting. When the pipeline is slotted, it is best for the owner to check the quality on site to ensure that the horizontal and vertical lines are played before slotting, and the construction is carried out according to the line.

    2. Water pipeline installation.

    The installation of water pipes in hydropower installation is very important, most of the water pipe materials are PPR pipes, aluminum-plastic pipes, and the installation of water pipes should also pay attention to the placement of faucets, and the owners had better supervise and observe in person, so as to ensure its practicability.

    3. Wire wiring.

    Wires are a key material in hydropower installation, and the common wires on the market have copper core wires of more than square meters. When installing wires, it is necessary to separate the strong and weak currents, switches, air conditioning sockets and electrical sockets, so that the panel installation at the back will be smoother.

    4. Water pipe inspection.

    After the construction is completed, it is necessary to carefully check whether there are quality problems in the water pipes, so that the potential safety hazards of the waterways can be eliminated. When inspecting, you can use the method of pressure test, first use the gambling head to bet all the mouths to death, test the water with a pressure gauge, check all pipes and all joints after the pressure, and if there is no water leakage, it means that the water pipe installation is qualified.

    What to pay attention to in the installation of water and electricity.

    1. When designing the waterway, you should first think about all the equipment related to water, such as water heaters, water purifiers, washing machines, toilets and wash basins, etc., and think about the installation location, method and whether you need hot water.

    2. In addition to the water outlets such as wash basins, cloth pools, and clothes machines, it is best to install a faucet in the bathroom to facilitate the connection of water and flushing the ground in the future.

    3. It is best to have the property present when conducting the suppression test, so as to play a supervisory role and avoid some decoration teams from deceiving the owners. The method of pressure is to open the "return valve" of the pressure pump to form a circuit to see if there is pressure in the tube, especially for the electric pressure pump, we should pay more attention.

    4. After the waterway is installed, it is necessary to pay attention to check whether the waterway in each place is kept unblocked, such as: whether each drain outlet of the faucet such as kitchen, bathroom, balcony is unobstructed. If you find that the drainage is slow or poor, you should get the property unblocked in time.

  7. Anonymous users2024-02-06

    The content of hydropower installation is very extensive, and the content of water, electricity, heating, and intelligent consumption are both, but if you are home decoration, the scope is much smaller.

    The landlord means rough, then it's very simple: 1Must be used, 2Reserve it for later use.

    Electrical: think as much as possible about what electrical appliances (including weak electricity) may be added in what part of the point in the future, and now open the wall groove to bury PVC20 (do not use 16, 16 is cheaper than 20 a few dimes a meter, and the line should wear several less) electrical pipes, install the junction box, and install the switch socket if you need to use it.

    Water supply and drainage: The water supply pipe is now mostly PP-R, using DN20, divided into cold and hot water pre-embedded, buried on the wall as much as possible (marked), not buried on the ground, which is our more than 30 years of experience. Because the water is relatively simple, the design of the pipeline is in place in one step, the appliance is slow, the PP-R pressure test is 10 kg, and the pressure is maintained for more than 60 minutes.

    Drain pipes, try to keep them in their original state, with little change.

    Air conditioning, reserved holes.

    Water and electricity do not include tiles, washbasins are poured inside.

  8. Anonymous users2024-02-05

    One. Water and electricity should first be opened with the relevant departments. Second, the installation of water refers to the installation of water pipes, faucets, washbasins, vegetable washing basins, toilets and other water terminals; Electrical installation refers to the installation of power cords, switches, and lamps. Third, if it is not decorated now, it is recommended that the water and electricity lines be concealed.

  9. Anonymous users2024-02-04

    Electricity includes slotting, conduits, power cables, mounting panels, and installing lamps.

    Water includes slotting, draining inlet pipes, discharging water pipes, installing angle valves, kitchen and bathroom sanitary ware.

    Tiles are the business of bricklayers.

  10. Anonymous users2024-02-03

    1.Positioning pay-off.

    Positioning pay-off is the key point of hydropower transformation layout, and the overall layout of the space environment is determined through pay-off lofting in the early stage, and a reasonable construction plan is formulated.

    2.Slotted pipe routing, bridge laying.

    First use the cartridge to bounce the line in the slotting, avoid horizontal slotting, and carry out the construction in accordance with the hydropower construction drawings.

    3.Laying wires and cables.

    After slotting, it is necessary to lay wires and cables, and the wiring needs to clearly distinguish the strong and weak currents, the ground wiring of the electrical wiring group, and the top surface of the wall wiring of the switch and lighting wiring group.

    4.Lamps, switches, socket panel mounting.

    Multiple sockets, network installation bottom surface flush and flat, installation requirements in the middle of the walkway with sprinkler, fire horn, smoke detector consistent.

  11. Anonymous users2024-02-02

    1. Construction organization design (plumbing, electrical, fire water, fire electricity).

    2. Three disclosures (quality, technology, safety).

    3. Material inspection (valves, radiators, wires, switches, sockets, national standards are mandatory to do a second retest, and pipes are to be retested according to landmark regulations).

    4. Concealed records (only the buried part of the plumbing and fire water or the part of the pipe ditch that is not passable, according to the concealment of the system parts, and the concealment of the line pipe of electrical and fire electricity).

    5. Construction records (suppression, flushing, fire hydrant test firing, fire linkage, grounding resistance test, electrical test operation record, etc.).

    6. Inspection batch (buy local standard, pick the project you have to do).

    7. Sub-project and energy-saving part.

    8. Archive application form and archive directory and as-built drawings.

    That's all, I'm from Heilongjiang, this is Heilongjiang's practice, I hope it can help you! Don't spray it with peers across the country I know that local food stamps can't be eaten nationwide But I guess it's pretty much the same

  12. Anonymous users2024-02-01

    You can go to the information sheet in the information room of the Construction Committee, then you have a detailed ** catalog.

  13. Anonymous users2024-01-31

    Mainly responsible for the initial stage of hydropower installationWiring. Installation.

  14. Anonymous users2024-01-30

    In a word, responsible for the installation of the home has work related to electricity and water related work.

Related questions
9 answers2024-07-03

You can find it on the city** catch-up network.

6 answers2024-07-03

Electrician, plumber, basic knowledge, 8 years of experience summary of front-line masters, divided into 30 sections, let's take a look, what to learn: >>>More

9 answers2024-07-03

Three hundred and sixty lines, the line is the champion, "no matter which line, there is a way out if you do it well." The best way out for a plumber is to be a plumber engineer. Plumbers are currently in demand and have a future. >>>More

14 answers2024-07-03

It is a small "rigid wire". The wire is too soft,,, head is bent by hand "pliers", bent a little more, "I don't know what to type for you, you can't tell me?? People turn high hydropower", skills,,, if you can't wear it, turn the wire a few times, turn the hand with a little force to wear, "the wire is small but if you want it to turn, yes, hold the main wire about 15-20cm with both hands, if you can't turn it,, bolt I didn't say", wire and wire joint, steel wire head bend 360 degrees, use pliers to pliers, don't be too big, first tie a wire to go, tie other wires on this wire, the text is not easy to describe, I can't understand it, I can't ,,, pull the wire, so I use pliers to clamp the master, eat a full meal, and pull the ......, the force is small and there are two, not enough to add people,,, but ......Be careful,,, don't pull the wire off,,, then pull it white. >>>More

19 answers2024-07-03

Because from the perspective of this construction engineering procedure, it is divided into three partsIf it's yoursRenovation companyTo undertake your renovation, then your decoration company is directly responsible, but if it is said that you hire your own workers, then it depends on your own prior agreementAfter all, such a thing as filling the pipe groove does not require high technical content. <> >>>More