Electrician, plumber, basic knowledge, 8 years of experience summary of front-line masters, divided into 30 sections, let's take a look, what to learn:
1: Explanation of the details of home decoration and drainage (84 minutes).
2: Explanation of various practices of home improvement water supply (61 minutes).
3: Plumber and electrician look at the drawings to explain, floor plan and system diagram.
4: Explanation of the details of lofting in the early stage of home decoration and tooling.
5: Home decoration, tooling, water and electricity slotting details.
6: Home decoration, tooling plumber buried box details.
7: PVC line pipe various practices, in the face of different customers to choose different practices.
8: The relationship between 380 volts and 220 volts, and the details of wire size selection.
9: Detailed explanation of the specific practices of home decoration and tooling light lines.
10: Explain the details of the specific connection method of the lamp wire in the wire box.
11: Home decoration, tooling dual control, three control cable, wiring details explanation.
12: Home decoration bathroom suite bath bomb line details explanation.
13: Home decoration, tooling early electrical box and line details explanation.
14: Explanation of the early functions and circuit details of the weak current box.
15: Explanation of the details of the slot after the completion of home decoration and tooling.
16: Explanation of the overall details of home decoration and tooling after the completion of the early stage.
17: Home decoration, tooling later switch, socket installation details.
18: Explanation of the details of the installation of the electrical box in the later stage of home decoration and tooling.
19: Detailed explanation of the installation of lamps and lanterns in the later stage of home decoration and tooling.
20: Detailed explanation of hardware and sanitary ware installation in the later stage of home decoration and tooling.
21: Detailed explanation of the details of home decoration and tooling after the completion of the later stage.
22: Detailed explanation of the practice of water and electricity in rental housing.
23: Comparison of details of common 380 volt and 220 volt electric boxes.
24: Explanation of details beyond the drawings of the tooling hot pot restaurant.
25: Explanation of the details of KBG pipe practice.
26: Calcium silicate board opening and size details of the ceiling.
27: A comprehensive explanation of hydropower materials.
28: Focus on the maintenance of large electrical boxes.
29: Common sense that plumbers must learn.
30: Explanation of the prospects of electricians and plumbers.
This is what every hydropower master must master, and it is also a clear direction for the growth of every hydropower apprentice.
-
First of all, we must learn to understand electrical things, learn to make slots, wiring, put pipes, and then connect switches, power distribution phases, learn to weld pipes, arrange pipes, and learn these are basically the same.
-
What are the basic knowledge of plumbers.
1. Before construction, be sure to make layout drawings for electrical, water supply and drainage;
2. It is forbidden to lay wires directly in the wall, in the floor and on the ceiling;
3. The installation of lamps and lanterns should be carried out after the painting is completed;
4. Lines with different voltages, different circuits, and different signals are strictly forbidden to wear in the same conduit;
5. The switch of lamps and electrical equipment must be installed on the "phase wire";
6. It is forbidden to use the mobile switch at the head of the bed;
7. The interface of each line should be smooth and the connecting plate should be firm;
8. The water supply pipe can be PP-R pipe, copper pipe, etc.;
9. The installation position of sanitary appliances should be accurate, and the installation of supports and brackets should be smooth and firm;
10. The conduit should be selected with qualified products, not only that the soup wire can be penetrated, but also that there should be enough clearance to dissipate the heat generated when passing through a large current.
11. For the water supply pipeline, it is necessary to strictly test whether each part is connected tightly and firmly, and whether the direction is correct, and at the same time, the water pressure test must be done before it can be buried after testing the water for a period of time. The pressure test index is generally suitable.
12. The cross-section of the drainage pipe should have sufficient slope, and the connection between the various periods should be tight to ensure that there is no leakage.
-
1. Before construction, there must be electrical, water supply and drainage design and construction drawings.
2. It is strictly forbidden to lay the wire directly in the wall, on the floor, under the floor or on the ceiling without any protection.
3. Lines with different voltages, different circuits, and different signals are strictly forbidden to wear in the same conduit.
4. The installation of lamps and lanterns should be carried out after the painting is completed. Install lamps and lanterns on the brick-concrete structure, it is strictly forbidden to use wooden wedges, and use hooks, bolts or expansion bolts. There should be no less than 2 bolts to secure the fixture. Tung field lamps shall not be installed on combustible components.
5. The opening and closing of the lamp and electrical equipment must be installed on the "phase line", otherwise after the switch is dropped, the lamp off and the electrical equipment will still be live, which is easy to cause electric shock.
6. There are two power systems.
-
Electrician, plumber, basic knowledge, 8 years of experience summary of front-line masters, divided into 30 sections, let's take a look, what to learn:
1: Explanation of the details of home decoration and drainage (84 minutes).
2: Explanation of various practices of home improvement water supply (61 minutes).
3: Plumber and electrician look at the drawings to explain, floor plan and system diagram.
4: Explanation of the details of the lofting of the god in the early stage of home decoration and tooling.
5: Home decoration, tooling, water and electricity slotting details.
6: Home decoration, tooling plumber buried box details.
7: PVC line pipe various practices, in the face of different customers to choose different practices.
8: The relationship between 380 volts and 220 volts, the details of wire size selection 9: the details of the specific practices of home decoration and tooling lights.
10: Explain the details of the specific connection method of the lamp wire in the wire box.
11: Home decoration, tooling dual control, three control cable, wiring details 12: home decoration bathroom suite bath bomb line details explanation.
13: Home decoration, tooling early electrical box and line details explanation.
14: Explanation of the early functions and circuit details of the weak current box.
15: Explanation of the details of the slot after the completion of home decoration and tooling.
16: After the completion of home decoration and tooling, the details of the whole body are explained 17: the details of home decoration and tooling are solved in the later stage of switch and socket installation.
18: Home decoration, tooling in the later stage of the details of the electrical box installation explanation.
19: Detailed explanation of the installation of lamps and lanterns in the later stage of home decoration and tooling.
20: Detailed explanation of hardware and sanitary ware installation in the later stage of home decoration and tooling.
21: Detailed explanation of the details of home decoration and tooling after the completion of the later stage.
22: Detailed explanation of the practice of water and electricity in rental housing.
23: Comparison and explanation of the details of common 380 volt and 220 volt electric boxes 24: Explanation of details outside the drawings of tooling hot pot restaurants.
25: Explanation of the details of KBG pipe practice.
26: Calcium silicate board opening and size details of the ceiling.
27: A comprehensive explanation of hydropower materials.
28: Focus on the maintenance of large electrical boxes.
29: Common sense that plumbers must learn.
30: Explanation of the prospects of electricians and plumbers.
This is the basic knowledge that every hydropower master must master, and it is also a clear growth direction for hydropower apprentices to enter the industry.
-
The installation of water and electricity is part of the basic decoration, and it is a hidden project belonging to the living room, so it must be paid attention to when decorating. When we decorate water and electricity, we must first understand, so that we will not be blind when we supervise the staff, so let's understand the basic knowledge of water and electricity installation.
1. The pipeline of the water pipe is slotted, before the slotting, we must first play the line according to the drawings, the general regular pipeline slotting route is generally parallel or perpendicular, the pipeline of the flat walking line is generally controlled at 60-90cm high, and the pipeline on the wall must be vertical, and the depth is controlled at 4cm.
2. Waterway pipeline installation, most of the current decoration is the use of PPR pipes, the pipes are divided into cold water pipes and hot water pipes, and the hidden pipes cannot use galvanized iron pipes, and the construction personnel should inform the owner to discuss the location of the water area.
3. The supervision of the waterway pipeline, the supervision of the waterway pipeline is very important, which is related to the potential safety hazards in the future.
4. Conduit, when wiring the circuit, the conduit should be used, because the wire can not be crowded with the conduit, we must reserve enough space, the wire will generate heat when passing through the high current, if the conduit is too crowded, the heat is difficult to dissipate, which will lead to safety problems.
5. It is forbidden to connect wires in the conduit, and there can be no wiring in the conduit. It is one of the most basic basic knowledge of hydropower installation, so when decorating, it is necessary to avoid the joints of the wires, and generally wire in the junction box in the switch, socket and lamphead box.
After moving in later, it is very troublesome if there is a problem with water and electricity decoration. Therefore, it is still necessary to check the water and electricity in the early stage.
It is a small "rigid wire". The wire is too soft,,, head is bent by hand "pliers", bent a little more, "I don't know what to type for you, you can't tell me?? People turn high hydropower", skills,,, if you can't wear it, turn the wire a few times, turn the hand with a little force to wear, "the wire is small but if you want it to turn, yes, hold the main wire about 15-20cm with both hands, if you can't turn it,, bolt I didn't say", wire and wire joint, steel wire head bend 360 degrees, use pliers to pliers, don't be too big, first tie a wire to go, tie other wires on this wire, the text is not easy to describe, I can't understand it, I can't ,,, pull the wire, so I use pliers to clamp the master, eat a full meal, and pull the ......, the force is small and there are two, not enough to add people,,, but ......Be careful,,, don't pull the wire off,,, then pull it white. >>>More
Maintenance Worker Job Responsibilities.
1. Responsible for power supply line laying, inspection, maintenance and troubleshooting; >>>More
You can find it on the city** catch-up network.
I know that there is an electrician training class in Liwan District, Guangzhou, and the tuition fee is about 5,000 yuan.
1. The basic concepts of circuits: current, voltage, resistance, Ohm's law for part of the circuit, electrical work and electrical power. 2. Simple DC circuit: >>>More