After the house is renovated, the first thing that should be accepted is whether the overall layout of the house meets your expectations, and then whether the various circuits, gas routes, and water pipe routes are in accordance with the direction of the drawings, and secondly, whether the materials used in the decoration have cut corners! The most important thing is whether the house has a safety hazard.
-
The first point should check how the waterproofing of the bathroom is done, which is very important, the second point is that the overall structure of the kitchen decoration is not very strong, and the third point is that the cabinet in the bedroom should be checked for anything.
-
After decoration, it is mainly necessary to check whether the floor tiles are hollow and crooked, the wall paint, whether the doors and windows are smooth, etc., the furniture made by the workers on site, as well as water and electricity, such as the lights in each room, the water in the bathroom and kitchen, etc.!
-
1. Look at the nuclear area of the contract.
Check whether the actual facilities are consistent with the brand and quantity of the facilities and equipment indicated in the sales contract, and whether there are any omissions; Confirm whether the drawings attached to the sales contract are consistent with reality, whether the structure is the same as the original design drawings, whether the area of the house has been actually measured by the real estate department, and whether there is any difference with the area signed in the contract.
2. See whether the floor is flat.
If you want to check whether the floor is flat, you only need to use a long ruler to lean against the wall and the floor to check whether it is flat, and at the same time observe whether there are scratches and cracks, and whether the wall is hollow.
3. Look at whether there are cracks on the wall and hollow drums on the wall and floor.
While checking whether the wall is smooth, it is also necessary to see whether there are cracks on the wall, and there are four common cracks: strength cracks, settlement cracks, temperature cracks, deformation cracks, and whether there is leakage of local slippery wire and steel bars. If you find that the above wall is covered with wax and chan surface problems during the house inspection, you can sign it after the developer helps to repair it.
4. Whether there is a defect in the indoor staircase: the dust of the main hall depends on the flatness of the staircase and whether there is a defect.
5. Whether the door and window installation track is smooth.
6. Whether the drainage is normal.
7. Finally, pay attention to check the doors and windows.
-
1. Look at the nuclear area of the contract.
Check whether the actual facilities sold are consistent with the brand and quantity of the facilities and equipment indicated in the sales contract, and whether there are any omissions; Confirm whether the drawings attached to the sales contract are consistent with reality, whether the structure is the same as the original design drawings, whether the area of the house has been actually measured by the real estate department, and whether there is any difference with the area signed in the contract.
2. See whether the floor is flat.
If you want to check whether the floor is flat, you only need to use a long ruler against the wall and ground to check whether it is flat, and at the same time observe whether there are scratches and cracks, and whether the wall is hollow.
3. Look at whether there are cracks on the wall and hollow drums on the wall and floor.
While checking whether the wall is smooth, it is also necessary to see whether there are cracks on the wall, and there are four common cracks: strength cracks, settlement cracks, temperature cracks, deformation cracks, and whether there is leakage of barbed wire and steel bars. If the above wall problems are found during the house inspection, the developer can help repair them after all.
4. Whether there is a defect in the indoor source grinding staircase: it mainly depends on the flatness of the staircase and whether there is a defect.
5. Whether the door and window installation track is smooth.
6. Whether the drainage is normal.
7. Finally, pay attention to check the doors and windows.
-
<> before the house decoration is completed and delivered, it is necessary to test the water and electricity, and also start the water heater and range hood to try whether it can work normally; The most important thing is to carry out an air test.
For modern decoration, after the house is finished, people are not in a hurry to move in, but will find a professional air testing agency to do a test of indoor air, which is an important point that people are more concerned about at present. For villas and other houses, in addition to indoor air testing, it is also necessary to do water supply and drainage pollution-free testing, demolition and renovation building safety testing, etc. Some of these are the hard test indicators required by the state, such as the water supply and drainage qualification test, and some are the testing operations done by themselves for safety.
We know that once the house is delivered to the owner, we don't need to and can't test the quality of the house. Because since the house can be handed over to you, then the developer must have done the corresponding professional testing to obtain the permission to deliver the house to the owner. For homeowners, what we can do is to do an air test after the home improvement.
Some homeowners often test the items that are about to be moved to their homes when they customize their furniture and home appliances, or ask for a test certificate, but those are all testing announcements issued by a third party, and we as customers can't seem to participate in it. The only thing I can participate in is the air test after home improvement done to ensure my own health. So how do professional companies conduct indoor air testing?
First of all, they have professional instruments, which do detailed testing on different positions, different heights, and different spaces of furniture and houses, and the testing instruments used for air and furniture are different, and the detection methods used are also different. The purpose of the test is also to find out where the harmful substances are concentrated, so as to carry out targeted clean-up work. After the entire furniture, wall and indoor space have been removed from harmful substances, it is necessary to do a comprehensive professional test again until the test data is qualified and the test cooperation report is provided to the homeowner, then such a test is completed.
In other words, the test is actually just a procedure for air purification, and the purpose is to make the decoration environment of the new house reach a usable state. Of course, house to house is not the same, for most apartment houses and apartment buildings, the inspection after renovation is mainly air detection. For large houses such as villas, there are many inspection items after decoration, such as safety testing of indoor demolition and modification, safety and insulation testing of water supply and drainage and weak electricity, acceptance of yard greening, pollution-free water supply and drainage testing, etc.
-
In the process of decoration of a new house, it is necessary to start the acceptance, and should not wait until the decoration is completed to accept. If the acceptance is unqualified, the wall is smashed, and the hole is dug, wouldn't it be even worse? Below the author will describe step-by-step what important project acceptances are and when.
What are the decoration acceptance projects? When is it accepted?
1.Renovation of the house.
House renovation belongs to the first project in the decoration, seemingly inconspicuous, there are many cases of smashing the wall workers to smash the sewer pipe, if not accepted in time, wait until the masons finish the bricks, the source of the smell is covered but not sealed, and then ......Can't find the ** odor. In addition to ensuring that the pipes are not damaged, you should also pay attention to whether the doors and windows are damaged, especially the lower part of the gate, whether there are cracks in the load-bearing walls and load-bearing beams, etc.
2.Hydropower component.
After the renovation, 10 out of 10 owners felt that the socket was not enough or that there was a problem with the position of the socket switch. Hydropower should be on site during construction to simulate life scenarios to ensure that switches and sockets are in place. At the same time, the on-site acceptance of the construction standardization, whether there is no foreign matter in the sewer pipe after the water test, whether the faucet is enough, whether the spacing between the shower outlets is the standard 15 cm, whether the lock or yellow wax pipe is used in the bottom box to wrap the protective wire, whether the water supply pipe is free of leakage during the pressure test, etc.
3.Masonry part.
The masonry part has the well-known waterproof water test inspection, which is only one of them, and whether the bathroom threshold stone part is painted with waterproof and waterproof flow to the living room, whether the semi-dry cement mortar is used when the floor tile is paved, whether the cement mortar is mixed with laundry detergent (mixed with laundry detergent is unqualified), whether the tile is left jointed, whether the caulking is used with a scraper (the one with a rag is directly filled with a rag is unqualified) and whether the steel bar is inserted when the new wall is built.
4.Carpentry part.
The carpentry acceptance part is not much, but it cannot be ignored. The more typical items that need to be accepted include whether there are seams in the gypsum board ceiling, whether the corners of the ceiling are made of 7-figure technology, whether the nail hole cannot be seen on the outside of the ecological board cabinet, and whether the inside of the wardrobe or other cabinets is horizontal and vertical.
5.Painter part.
The phenomenon of cutting corners in paint projects is very common, mainly putty is only scraped once, latex paint is used with expired latex paint, the corner of the wall is not 90 degrees, and whether the top surface of the wall adopts yin or yang corner lines.
6.Installation works.
The installation project is mainly based on water and electricity, and the all-inclusive owner mainly carefully compares whether the installation goods are the brand and style they want. In addition, it is necessary to carefully observe whether the wiring of the installation master is standardized, whether the screws are tightened, etc.
If you don't understand the decoration, you can ask a professional home inspector to help inspect the construction quality. Some projects, such as water and electricity, must be present in person and solve problems on the spot. Finally, thank you for the invitation, I hope the above can help you!
-
It is necessary to pay attention to the condition of the wall, pay attention to whether the tiles are hollow, pay attention to the situation of the bathroom, the situation of drainage, and pay attention to whether the pipes in the kitchen are unblocked, all of which must be checked.
-
Pay attention to the condition of the wall, whether the tile is hollow, pay attention to the situation of the bathroom, the drainage, whether the kitchen pipes are unblocked, and some places must be checked.
-
It is necessary to carefully check the size of the door gap, the gap below should not be less than 5 mm, and should not exceed 8 mm, and the door gap on the other sides should not exceed 3 mm. When checking the windows, open and close the windows flexibly to see if the glass is broken and the window frame is not deformed.
-
It is necessary to pay attention to the size of the door crack, do not check the window, check the tiles, be sure to pay attention to the inspection of water leakage, and pay attention to the inspection of the circuit, so as to better ensure safety.
A home inspection is like a doctor's physical examination, and only after the physical examination can you feel at ease. >>>More
First of all, we must take a look at the overall decoration style of the house, as well as some of the materials used, and the decoration of the house uses some wooden floors, is it pure natural? These must be inspected in a timely manner, and there are some dead ends that are not in place, these are some experiences and methods of inspection.
Check whether the specifications of the door brand conform to the agreement of the annex to the contract, and if the anti-theft door is agreed, it should meet the national standard of the anti-theft door. Check whether there are scratches, collisions, corrosion and other phenomena that seriously affect the appearance on the surface of the door leaf, and whether the door leaf is installed perpendicular to the ground. Check that the door frame wraps around the edges, the hinges have obvious rust, and the door frame is installed vertically. >>>More
1. Color matching should be coordinated, we should pay attention to its color matching when decorating, if the bathroom space is small, then we can choose some cool colors with a sense of cleanliness, and match them with the same tone, which can make the whole space appear bright and tidy. Low-chroma and high-brightness colors are also a good choice, but you should not choose too many colors, otherwise it will make the small bathroom look too messy and easy to dazzle. >>>More
Advantages of the gate of the aluminium villa.