1. Pavement ground leveling.
At the ground pavement site of the stadium, it is necessary to keep no more than 2mm uneven under the straight edge, otherwise it is necessary to adjust the level with appropriate materials. The uneven paving floor of the stadium can be leveled first by the artesian lawn.
2. Floor moisture content.
The equilibrium moisture content of the wooden floor of the gymnasium is between 6% and 14%, which should be considered in the regional climate and environment where the stadium is located. Before paving, the wooden floor of the gymnasium must be tested to see if its moisture content is qualified.
3. Paving ground humidity.
The humidity of the stadium pavement environment should be reasonable. The relative humidity of the air should be the same as that of the building, otherwise a heating and/or extraction system will be used. The difference between lower and higher relative humidity should never exceed 30.
4. Venue environment.
Generally, the wooden floor paving of the gymnasium should wait for the completion of other construction projects before starting construction, and cross construction should be avoided; At the same time, the basic construction conditions such as water, transportation, electricity, and lighting of the stadium should all be in place, and there are construction conditions for the wooden floor pavement of the stadium.
-
Section 1: Preparatory work before construction.
The following works must be completed before the wood floor can be installed:
The foundation of the museum is completed and the maintenance period is not less than 28 days.
The decoration and decoration works in the museum must be completed and the relevant personnel must be withdrawn.
Installation and commissioning of lighting projects in the museum.
Installation and commissioning of audio in the museum.
Installation and commissioning of acoustic engineering in the museum.
Installation and commissioning of air conditioning and ventilation in the museum.
Installation and commissioning of display screens and related timing and scoring equipment in the museum.
The waterproof and leak-proof roof in the museum must be accepted.
Installation, commissioning and acceptance of fire-fighting facilities in the museum.
Anti-termite treatment in the museum (especially the foundation pit of the wooden floor should be treated with anti-termite).
Embedded equipment in the museum.
The installation of strong and weak electricity in the museum was completed.
Section 2: Basic conditions for entering the site:
It is required to have a three-phase four-wire power supply of more than 5kw;
It is required that there is a passage outside the stadium that can enter 10t trucks;
Adequate lighting conditions are required;
The installation of the foundation steps meets the requirements;
There is a place where goods and tools are stacked.
It is required to provide power supply, lighting, traffic roads, etc., and have sufficient construction site to negotiate and resolve temporary matters during construction.
-
1. The surface of the concrete surface layer of the base layer of the building structure should be hard, smooth, clean, dry and sand-free, and the surface flatness should be set under the concrete surface layer of the base layer of the building structure, and the wall surface at the base of the wall should also be waterproofed. Forced ventilation measures should be considered at the grassroots level to ensure that the grassroots layer is ventilated and dry.
2. The laying of wooden floors should be carried out after the completion of the ceiling project, wall decoration project, pipeline pressure test and electrical pipeline installation in the museum.
3. When fixing the sports equipment and installing the wooden floor, the embedded parts used to fix the wooden keel must be embedded accurately and firmly installed according to the requirements of the drawings.
4. The main materials and auxiliary materials (adhesives, surface coatings, anti-corrosion coatings, etc.) used in wood flooring projects should be in accordance with the design requirements, have quality certification documents and comply with the corresponding national (industry) standards, and there should be verification reports for important materials.
5. The laying of the wooden floor project should be constructed after the handover and acceptance of the previous project (especially the hidden knocking project).
6. Prepare common construction tools such as levels, desktop circular saws, portable electric innovations, sanding machines, portable cutting saws, electric drills, coconut heads, and levels.
-
Special operations personnel shall meet five conditions:
1. Be at least 18 years old and not exceed the national statutory retirement age.
2. Have passed the physical examination of the community or medical institutions at or above the county level, and have no organic heart disease, epilepsy, Meniere's disease, vertigo, hysteria, tremor paralysis, mental illness, dementia and other diseases and physiological defects that prevent them from engaging in corresponding special operations.
3. Have junior high school education or above.
4. Have the necessary safety technical knowledge and skills.
5. Other conditions stipulated in the corresponding special operations.
Extended Materials. Special types of work, different from special operations. In 1991, Article 2 of the Regulations on the Administration of Safety Technical Training and Assessment of Special Operations Personnel issued by the former Ministry of Labor defined special operations.
In 1999, the State Economic and Trade Commission promulgated the Measures for the Administration of Safety Technical Training and Assessment of Special Operations Personnel, which partially changed the above definition, clarifying that special operations refer to operations that are prone to personnel accidents and have major hazards to the safety of the operator, others and surrounding facilities (such as electrician, metal welding and cutting, etc.). The personnel engaged in this type of operation are called special operations personnel.
5) Ascending and erecting operations. Including more than 2 meters of climbing erection, demolition, maintenance workers, high-rise building (structure) surface cleaning workers.
Dear, do you have any other questions?
I'm glad to answer for you, if my answer can help you, please move your cute little hands to give a thumbs up! You can follow me, and you can continue to come to me if you need me in the future
I'm glad to answer for you, if my answer can help you, please move your cute little hands to give a thumbs up! You can follow me, and you can continue to come to me if you need me in the future
-
As the saying goes, "three points of flooring, seven points of installation" in the sports wood flooring industry. What are the installation requirements and procedures for sports wood flooring:
1. Installation requirements
1) Grassroots waterproof, moisture-proof and ant-proof strengthening measures: On the basis of the original building design structure self-waterproofing, the entire site range and the range interface may produce water seepage in the later stage are all FJS waterproof coatings, and then 150 thick concrete-L is applied as the wood floor structure G layer and waterproof protective layer, and the construction is carried out in advance to ensure that the concrete can be divided into ten dry, and continue to observe whether there is moisture return and leakage, so as to ensure that there is no leakage and moisture before the construction of the wooden floor. Coagulate the base layer:
l Termite control measures are added to ensure that the ant control is effective.
2) The horizontal flatness of the base layer of the site, the horizontal flatness of each layer of keel, and the horizontal flatness of the wool floor are controlled, and each procedure must be controlled by laser level.
3) According to the design of various sports competition equipment embedded parts and keel position accurate positioning and pay-off, installation of competition equipment to embedded parts and keel installation fasteners;
4) Precautions for installation at all levels, keel installation is the key to the sports floor, which must be stable, straight, consistent in spacing, horizontal and flat; Leave a 30mm gap between the keel and the façade to ensure the ventilation of the keel and the floor; The elastic rubber pad must be evenly laid to ensure that the elastic coefficient of the site is consistent: the joint laid by the wool wrench layer in the base layer must leave a 23mm gap; The seams of the face wrench mounting plate head should be staggered and should be relatively symmetrical to maintain beauty.
Second, the installation and construction process
Sports wood floor installation construction process: grassroots cleaning a measurement of the flatness of the ground, elastic line - embedded iron parts - installation of F layer keel, leveling - installation of sports wood floor special shock-absorbing rubber mat - laying sound-absorbing centrifugal glass wool - installation of the upper keel, leveling of a wool floor to find F installation - laying of shock absorption insulation moisture-proof film - overall surface floor paving - equipment embedded parts installation, baseboard production and installation - finishing cleanup.
-
1. Requirements for ground foundations:
The structural elevation of the sports floor is determined, and the height can be adjusted to 10-20mm;
The foundation requirements are basically flat, the overall horizontal difference of the floor is not more than 20 mm, and the 2m ruler is not more than 3 mm;
Before the ground floor venue is leveled, the waterproof layer of the building must be done;
The cement floor is dry and the humidity is less than 10%;
The ground is clean and clean, and there is no cargo or debris stacked;
According to the design requirements, install all kinds of sports equipment embedded parts (including the ground base part);
If the ground is designed with trunking, pipelines, etc., drawings and corresponding written instructions should be provided in advance;
Before entering the site, the owner should provide a track map of the activity stand.
2. Basic requirements for the construction site:
The construction above the floor and the fire test have ended, and there are no more projects to be constructed for the decorative ceiling, lighting and sound systems;
Indoor wall painting, sound-absorbing panels, soft packaging, glass curtain walls, painting, water, electricity, and other engineering projects have been completely completed and no longer under construction;
There shall be no water seepage and rain leakage in the venue to avoid the deformation of the floor when exposed to water;
In order to protect the product and construction quality, the floor installation adopts closed construction, which does not allow cross construction and avoids walking. Avoid duplicate construction.
-
The quality of the foundation ground treatment of the gymnasium has a great relationship with the installation of sports wood flooring, and the ground base is required to be flat, strong, strong and dry on the surface, so as to develop the corresponding construction plan, which has the following requirements:
1. The construction conditions of the floor base must meet the conditions stipulated in the national construction quality acceptance specification for the construction quality of the cement base in the national construction quality acceptance specification for the cement base "GB50209-2002", and the material laying work can be carried out.
2. To detect the moisture content of the ground, the moisture content of the base layer should be less than 3%, but it cannot be measured at the window or doorway, because the test value may be too low, and the depth of the test must also be noted: the suspended concrete floor is 20% deep from the surface downward; 40% depth of concrete floor;
3. The relative air humidity suitable for construction shall not exceed 60%. Use a thermometer to detect the temperature, the indoor temperature and the surface temperature should be 18 degrees, should not be below 5 degrees and above 30 degrees of construction, if the moisture barrier has been added, the relative humidity can be allowed to reach 85%, but once it exceeds 85%, it can not be laid.
-
The paving of the sports floor pays attention to the "right time, the right place and the right people", "the time of the day" refers to the sunny weather, and the sports floor is sunny before and after the installation, and it does not rain; "Geographical advantage" requires that the foundation ground has been thoroughly dried before laying; "People" means that pavement workers must be professional.
-
All aspects of the foundation of the site before the construction of the sports wood floor must meet the standards, which is the most basic requirement, and the construction site is also required to meet the following conditions in order to arrange the construction
a. The infrastructure project must be completed before the construction of the sports wood floor, and the construction site has been cleaned. The construction quality of the ground must meet the design requirements, and it should also be waterproof, moisture-proof, and air-isolated, and completely dry;
b. The indoor electricity, steam, water and ventilation projects have been installed, and the acceptance meets the design requirements and can be used normally;
c. Before the installation of sports wood flooring, the horizontal tolerance within 2m of the ground of the stadium shall not exceed 2mm;
d. Try not to cross construction, if you can't avoid cross construction, you need to reach a consensus through the relevant responsible person to form a written record to clarify the responsibility.
-
(1) The production conditions and safety facilities at the job site should meet the requirements of relevant standards and specifications, and the labor protection equipment of the staff should be qualified and complete.
2) Places where people often work and construction vehicles should be equipped with first-aid kits and storage of first-aid supplies, and special personnel should be designated to check, replenish or replace them frequently.
3) The safety equipment used on site should be qualified and meet the relevant requirements.
4) All kinds of operators should be informed of the risk factors and preventive measures existing on site and at work.
-
Professional basketball court floor paving special basketball court wooden floor. Basketball court wooden flooring, three-point flooring and seven-point installation, basketball court wooden floor installation and construction have basic requirements and conditions:
The construction conditions of the wooden floor of the basketball court are very different from those of the civil floor, which is manifested in:
1. Basic requirements.
Civil engineering should do a good job of waterproofing treatment in the floor construction, and the foundation construction requirements are as follows:
1) One felt and two oil waterproof layers.
2) 100mm thick concrete, Portland cement above grade level, aggregate particle size is not more than 15mm, concrete surface layer strength grade should not be less than C15.
3) Before the construction of the floor, the civil works must be completed and cleaned up, and the quality of the ground construction must meet the design requirements of the basketball court wooden floor before the construction of the sports floor, and the treatment of waterproof, moisture-proof and air insulation should be done, and it should be completely dry. (The foundation flatness is high, and the bottom difference is not more than 20mm).
2. The installation of indoor water, electricity, steam ventilation and other projects is completed, especially the water network pipeline must be tested to confirm that the design requirements have been met, and the normal use will not have an impact on the wooden floor of the basketball court (no dripping water).
3. The interior decoration roof, sound reinforcement, electroacoustics, lighting and other projects are completed, so as to avoid the impact on the construction of the wooden floor of the basketball court and potential safety hazards during cross construction.
4. The ground humidity or equilibrium moisture content is basically the same as that of the outside world.
5. If the wooden floor of the basketball court is constructed at night, it must have the lighting conditions for night construction.
-
1. Anyone entering the venue must wear sports shoes, and the soles of the shoes are free of mud or other dirt, and other staff must wear thick flannel shoe covers when entering the venue temporarily.
2. It is strictly forbidden to consign or roll hard objects on the surface of the floor to prevent scratching the surface of the floor 3. It is strictly forbidden to sprinkle water everywhere in the venue, littering, cigarette butts, metal products and sharp products 4.
Elevate the age of the contours of the looks.
JD crowdfunding individual initiation requirements.
1. The initiator of the project should be the JD crowdfunding platform. >>>More
The memorization method refers to remembering or recalling things that have gone by. >>>More
The basic conditions for joining a soldier are to meet the conscription standards of China's "Military Service Law" and to develop morally, intellectually, and physically in an all-round way. Morality is morality, and we must love the Communist Party, the motherland, the people, socialism, and labor, have a certain ideological consciousness, have noble moral character, obey orders, listen to commands, and abide by discipline. Wisdom means that the brain is normal, and it can't be stupid, stupid, or demented. >>>More
The main thing is to be beautiful, and in this regard, girls must be self-aware. Many people think they are pretty, but they are not. It is subject to the public's view. >>>More