What do I need to pay attention to when dry laying floors?

Updated on home 2024-08-02
13 answers
  1. Anonymous users2024-02-15

    If the water in the cement floor is not removed before installation, a certain moisture shock wave will be generated, which will cause the geothermal floor to crack and cause the floor to warp after installation, so the moisture in the cement floor will be removed. Some people will say that it is difficult to see with the naked eye whether it is dry or not, because wood flooring can bring a natural atmosphere to the home. Compared with floor tiles, wood flooring has a softer texture, a comfortable feel on the feet, and better thermal conductivity and water absorption.

    But if the wooden floor is not installed properly, it will squeak when you step on it! Not to mention the warping of the ground destroys the beauty of the space.

    As one of the mainstream floor materials for decorating houses, wood flooring needs to know some basic knowledge of wood flooring when choosing and using wood flooring, so as to better enjoy the experience brought by wood flooring. From the point of view of the thermal performance that is most concerned, the tile is better than the floor, which can quickly make the indoor reach a certain temperature, but the heat dissipation of the tile is also stronger than the floor, which will cause the temperature of the ground to be higher than the indoor temperature. The floor heats up more slowly, but the insulation is better.

    Wood flooring is often used in home decoration, can also be said to be the standard configuration of the family, whether it is used in the living room or bedroom, will bring a good sense of feet, and at the same time the whole decoration presents a very warm and comfortable feeling, then for the decoration of wooden floors, the ground must be dry, moisture content can not exceed 20%. If the moisture content is too high, it is easy to absorb water and expand after paving the floor, causing problems such as arching, drumming, and ringing, so if the moisture content exceeds the standard, it is necessary to dehumidify.

    Wooden flooring is often used in home decoration, can also be said to be the standard configuration of the family, whether it is used in the living room or bedroom, will bring a good sense of foot, and at the same time the whole decoration presents a very warm sense of comfort, then for the decoration of the wooden floor, there are many kinds of wooden floor paving technology, according to the specific surrounding facilities, the owner's requirements and the structure of the floor itself and other factors, the paving process of the wooden floor will be different.

  2. Anonymous users2024-02-14

    Attention should be paid to the choice of color, because only a good color match can better highlight your own decoration style. Attention should be paid to the quality of the flooring, because only in this way can you better guarantee the safety of your house.

  3. Anonymous users2024-02-13

    Be sure to treat the ground flat, clean all the slag on the ground, and lay a layer of plastic mat on the ground to alleviate the friction between the floor tiles and the ground and prolong the service life.

  4. Anonymous users2024-02-12

    There are more and more users of modern home decoration to buy flooring, and after purchasing flooring, they will generally find some professional paving masters to pave and paste.

    So what are the precautions for laying flooring?

    First of all, before laying the floor, you should see if the ground at home is in a horizontal state, if it is not in a horizontal state, it is easy to appear uneven after paving; Secondly, we should pay attention to the use of glue when paving, otherwise it is easy to fall off the glue, and it is very troublesome to make up for it later; After the final paving is done, you have to wait until 24 hours have elapsed before you can step on it.

  5. Anonymous users2024-02-11

    Today, I will answer the question of what you need to pay attention to when dry-laying the floor? In addition to the bathroom and kitchen, the house has been renovated with wooden floors, mainly to keep the home warm and let the children walk barefoot at home. The installation of the floor is very simple, but the installation of seven-thirds of the time, the floor installation is not good, it is also troublesome to step on, and there are some detail problems, and the ground should be leveled before paving.

    This is the level of measurement that must be observed by the master on site during indoor acceptance. If you find that the ground is uneven, you should immediately request repairs. Otherwise, you will find that the ground is paved in the later stage, and many places are uneven, which directly affects the ground and produces noise, so the foot feeling is not so good.

    Once the ground has leveled, it's almost time to prepare for the installation phase. This stage must not be ignored at this time. That is, clean the dust from the ground.

    Otherwise, the installer will pave it directly regardless of your uncleanliness. So buy yourself a very cheap industrial vacuum cleaner to wash the dust off the floor, so as not to dirty the floor, and it is more convenient to move in. Many people think that the floor of a solid wood floor is supported by a keel, so there is no need to pad a moisture-proof mat.

    This is wrong. Your solid wood flooring or laminate flooring and flooring must be covered with moisture-proof mats. It is better to lay the floor.

    Spot gaze, moisture-proof mat seams should be taped. There are various packaging methods on the floor, such as hole cloth, oblique cloth, and nonzi cloth, etc., but the greater the loss of the floor of the complex packaging method, it is recommended that simple workers can do it.

    Installation of flooring is preferably family on site. It's better to watch the master do things. In this way, the master will not waste the floor of your house too much.

    Otherwise, he will be greedy and cut the finished product directly, without using a lot of scrap materials. If the family is staring at the scene, you can ask the master to set the materials in the corners of the floor under the wardrobe or under the sofa in an invisible place, which can save a lot. If you want to lay flooring at home, it is best to choose a flooring of one color.

    Don't do two or three colors. It's really ugly, and you can simply unify one pattern. When using Hetian jade to pave the floor, it is best to pass through the room.

    It is best to look between the room and the living room without a buckle partition, and generally do not deform. Don't worry about this. The floor end cap is generally from the aluminum buckle, and the color can also be selected, it is best to choose a similar color.

    Otherwise it's too sudden.

    There are generally some gaps between the feet and the wall. Generally don't care. Do not hit the glass glue.

    If the whole house is kicked out, it may not be very environmentally friendly, don't abandon the green environment for the sake of looking good. After the floor is laid, there may be some stepping sounds in some places, so you can usually step on it more. After a long time, it is more suitable between the floors, and there will be no sound.

    Dust and hair are easy to see on dark ground. It's not good. It is advisable to choose a light-colored floor.

    Otherwise, my house would have to be cleaned every two days. It's too much trouble. Remember, don't choose a dark floor!

    There are so many of the above, in fact, the most important thing is that the family is gazing at the construction site. If you find any problems, you can adjust them in time. Otherwise, nothing will change when it is paved.

  6. Anonymous users2024-02-10

    Just pay attention to three things:

    1. Leveling. Leveling is a very important step before laying the wooden floor, if it is not smooth and can not be reluctantly laid, the floor will appear in the later use of the process of hollowing, lock damage and other problems.

    2. Insect and ant control. After the leveling work is done, don't overlook a detail, remember to paint the floor with wall fixes or sprinkle anti-insect medicine.

    3. Laying direction. If it is a large area of wooden flooring, the direction of the living room shall prevail, and all spaces should be consistent with the direction of the living room as much as possible to ensure integrity.

  7. Anonymous users2024-02-09

    1. In summer, it is necessary to ventilate frequently, especially in rooms that do not live in people, and rooms that have been vacant for a long time are most likely to arch and curl, so be sure to check and ventilate regularly. 2. The floor should be kept dry and clean, and it is not allowed to mop the floor with a dripping mop, or wipe the floor with M water or soapy water, so as not to damage the surface gloss of the paint. If the board surface is accidentally stained, it should be removed in time, if it is stained with oil, it can be scrubbed with a rag dipped in warm water and a small amount of laundry detergent, if it is a drug or pigment, it must be removed before the stain has not penetrated into the wood surface, so as not to damage the floor.

  8. Anonymous users2024-02-08

    1.Before the floor tiles are dry-laid, clean the area where the floor tiles are laid to prevent the floor tiles from warping and hollowing out after they are laid. After cleaning the floor, pre-arrange the tiles according to the requirements.

    In the same room, it is better to lay full bricks. If you find that the tiles are incomplete, take care not to exceed one line horizontally or vertically. In the process of pre-drainage, water should be sprinkled frequently to prevent the ground from being too dry and causing hollowing.

    Apply mortar with a thickness of about 1cm on the back of the floor tiles as a bonding layer, and then use a special rubber hammer to evenly hit the floor tiles, paying attention to whether the levelness and gaps between the floor tiles are consistent.

    2.Keep the bricks on the same level. It is recommended to use a professional ruler for inspection.

    Then use a scraper to draw a line between the tiles, the purpose is to ensure that there is a certain gap between the tiles, to prevent unnecessary damage to the tiles caused by thermal expansion and contraction in the later stage. Determine the direction of floor laying, generally facing the south room, mainly in the north-south direction, that is, the direction in which the floor is facing the sun vertically, that is, the floor laying in the north-south direction is common. When beating wooden keels, the nails should avoid water pipes and line pipes.

    3.After the wooden keel is paved straight and accepted, the ground can be paved; Before fixing the floor, there should be enough time to equilibrate, or you should know the moisture content of the purchased floor to ensure that the moisture content of the floor is suitable for the environment. Ground moisture-proof treatment method:

    Generally, "three oil and two felt" (three layers of asphalt, two layers of linoleum paper, and then a layer of cement is smeared on top to prevent the release of harmful gases); The simple way to deal with this is to apply a moisture-proof film. Before laying the flooring, the purchased flooring products can be disassembled and arranged according to the color. At the same time, check whether the product quality is good and whether the texture is consistent.

    4.When laying, lay unsightly textured flooring on the furniture to make the home more aesthetically pleasing. Before laying the flooring, the purchased flooring products can be disassembled and arranged according to the color.

    At the same time, check whether the product quality is good and whether the texture is consistent. When laying, lay unsightly textured flooring on the furniture to make the home more aesthetically pleasing. The paving sequence is from left to right and vice versa.

    In addition, the floor and wall need to reserve a certain gap size to avoid warping of the floor due to thermal expansion and contraction. At the same time, the size of one millimeter should be maintained between floors to avoid unnecessary troubles in daily use.

  9. Anonymous users2024-02-07

    Be sure to ensure that the ground is flat, choose the right amount of cement and sand mixed together when dry paving, and then add an appropriate amount of water, be sure to clean the ground in advance, and then evenly sprinkle it on the structural layer, and then use a wire brush to brush it flat, and be sure to wet the ground with water before laying the floor.

  10. Anonymous users2024-02-06

    Sprinkle water on the ground, prepare the mortar, stir it, then lay the mortar base, then grout the brick base, then lay the floor, glue it.

  11. Anonymous users2024-02-05

    The correct step is to smooth the floor, then lay cement and sand on top of the floor, then lay the floor and then level the floor.

  12. Anonymous users2024-02-04

    I think it is necessary for Lele to remind the uncle of the worker who laid the floor.

    What are the precautions for flooring?

    1. Before the floor is paved.

    1) Before installation, ensure that the ground is dry, clean and flat. Whether the ground is dry, the easiest way to test is to put several pieces of film on the ground to be installed, seal it with tape around it, and after 12 hours, there is no water vapor condensation on the film surface, indicating that the ground is dry.

    2) The paved ground must be flat, and the height difference of each meter of surface should not be higher than 3mm. Before the floor is unsealed and paved, it must be placed flat at room temperature for 48 hours to make it balanced to adapt to the temperature and humidity of the installation environment, so as to avoid the phenomenon of floor expansion and contraction deformation in the later stage. The floor should never be placed on the ground or leaning against a wall.

    2. When the floor is paved.

    1) The floor should be laid in the later stage of construction, and no cross construction should be allowed. It should be sanded and painted as soon as possible after laying. This will not stain the floor or deform it with moisture.

    Moisture-proof measures should be taken for laying, especially in humid occasions such as the bottom floor. Moisture-proof measures include coating moisture-proof paint, laying moisture-proof film, using bedding treasures and so on.

    2) The keel should be flat and firm, and should not be reinforced with cement, and it is best to use expansion bolts, Meigu nails, etc. The keel should be made of larch and liu'an wood with strong nail grip. The moisture content of the keel or rough floor should be close to the moisture content of the floor.

    The keel spacing should not be too large, generally not more than 30 cm. Both ends of the floor should be implemented on the keel, not empty, and nails must be nailed to each keel. Water-based glues should not be used.

    3) The floor should not be spread too tightly, there should be enough expansion joints around it, generally it is left, and it should not be laid ultra-widely. The floor and the hall, bathroom, kitchen and other stone floor junctions should be thoroughly isolated and moisture-proof.

    4) The color difference of the floor is unavoidable, if there is a higher requirement for the color difference, it can be sorted in advance and a gradual transition method can be adopted to reduce the sense of visual mutation. Before the formal paving, you can test the whole paving to adjust the color difference of the wooden floor.

    3. After the floor is paved.

    When the wooden floor is just laid, it needs to be maintained, and it is best to step on it after 24 hours to make the floor stable, otherwise the floor may be unevenly stressed and there will be cracks. In the later use process, the floor needs to be well maintained to prolong its service life.

  13. Anonymous users2024-02-03

    What problems should be paid attention to when <> laying floors? Why? What problems should be paid attention to when <> laying floors?

    Why? When paving, it is best to buy the floor, who to install, so that the responsibility can not run away, the base layer and moisture content of the floor is a quantitative index, the general moisture content of the ground and wooden keel should be less than 16, so that the floor will not be damp, and with plastic film, moisture-proof mat, and keel must be paved relatively flat. We should understand the method and environment before paving the suspended assembled floor, and when installing the floor in winter, the floor must be flat and clean.

    The floor can be laid after dust removal before the floor is laid. If it is a non-absorbent ground such as mineral base, stone, tile, etc., it can be paved directly. Be sure to check whether the suspended assembly and transportation floor lock can be used normally, if it is too loose and too tight, or the lock has been damaged and not picked out, it will cause problems in future use.

    The old foundation ground, which is cracked or uneven, needs to be sanded and filled with cement before it can be paved. If there is snow on the ground, it is necessary to clean the snow on the surface before paving. The most important thing is that the suspended assembled floor belongs to modified plastic products, there is a situation of thermal expansion and cold contraction, in winter or cold weather construction, the floor has shrinkage, after the construction is completed, the side seams around must be reserved 15-30 cm, because in summer or when the weather is hot, it will be thermal expansion, and the appropriate shrinkage joints are not reserved, which will cause the floor to arch and deform.

    Suspended assembled floor from the cost performance, later maintenance, are slightly higher, in the same kind of products in the cost performance is higher, the use of the product investment, low maintenance cost, high grade, quick effect, is the best choice for all kinds of sports venues to lay. The service life is up to 10 years, and it will not fade or deform. When assembling a suspended floor, it is necessary to understand the method of laying the suspended floor and the environment in advance.

Related questions
15 answers2024-08-02

Today, I will answer the question of what you need to pay attention to when dry-laying the floor? In addition to the bathroom and kitchen, the house has been renovated with wooden floors, mainly to keep the home warm and let the children walk barefoot at home. The installation of the floor is very simple, but the installation of seven-thirds of the time, the floor installation is not good, it is also troublesome to step on, and there are some detail problems, and the ground should be leveled before paving. >>>More

13 answers2024-08-02

Kitchens and bathrooms should be paved with floor tiles or wall tiles first, wall tiles first, and floor tiles second. If the floor tiles are laid first, then the wall tiles must be paved and the tiles are dry and solidified. If the floor tiles are not completely dry and solidified, directly paving the wall tiles and stepping on the floor tiles will artificially cause the hollowing, loosening and inequality of the tiles. >>>More

10 answers2024-08-02

Precautions for flooring.

1. Overall trial paving: adjust the color difference of the floor. The floor with the same pattern and color can be placed in the living room, aisle or obvious place, and the slightly different ones can be placed under the furniture or in the corner, so as to achieve the overall aesthetic coordination. >>>More

14 answers2024-08-02

1. The renovation period takes 4 days The floor renovation is divided into five steps: grinding, scraping putty, coloring, painting, waxing and polishing. When sanding, the grinder should use 40 mesh, 80 mesh and 120 mesh sandpaper in turn (the larger the mesh, the smaller the sandpaper particles, the less obvious the scratches left by the sanding) three times, and then scrape putty to level the floor, and then paint or tone the floor. Since the texture of the surface layer of solid wood is natural, it is impossible to change the color of the décor, and only the depth of the color of the floor can be adjusted. >>>More

17 answers2024-08-02

Although the color of the wooden floor is colorful, you should not only care about personal preference when laying it. You have to think about lighting. There is still a big difference between decoration and clothing matching. >>>More