Many inverters are used in the same way! Introduce several common and simple methods of controlling frequency converters.
One. Wiring method of the main circuit of the inverter:
r s t three terminal blocks.
It is the power inlet end of the inverter, and three live wires are connected.
U v w is the motor that needs to be controlled for outlet termination.
Two. Types of control methods:
1.Panel controls. This control method is to start and stop the inverter through the inverter panel, modify the frequency, etc.
2.It can be controlled by an external controller or instrument. This control mode is mainly through the controller such as PLC to the inverter start and stop signal and frequency signal, this control mode can be divided into two kinds according to the different signal types. One type is switching signals and analog signals.
The other is communication digital signals.
Three. Control loop wiring.
Wiring of panel control: The panel control is the simplest and the least wiring, the enabling terminal of the inverter must be wired, no matter what control mode must be enabled inverter first! Potentiometer.
Wiring, if you feel that the panel button is not very convenient, then you can use the potentiometer to adjust the frequency, some of the inverter panel has been installed with the potentiometer, some are not installed, but the reserved potentiometer terminal!
Wiring via external controller or instrumentation: This type of wiring varies depending on the type of signal. 1.
The wiring method that relies on switching and analog control needs to be connected to the enabling terminal, the starting terminal, and the frequency given terminal is generally a current or voltage signal, and if it is a closed-loop control of PLD regulation, it is also necessary to connect the external sensor signal to the signal acquisition terminal of the inverter. 2.Relying on the communication mode to control the wiring mode of the inverter requires the enabling terminal, and the communication cable can be connected to the communication port of the inverter and the communication partner.
Four. Inverter parameter settings.
1.Panel control parameters: motor power; Control mode: panel; Frequency Given: Panel Potentiometer; upper and lower limits of frequency; There are slight differences in the parameters of different frequency converters!
2.Switching and analog control parameters: motor power; Control mode:
Remote; Frequency given: external analogue; External analog channel: depending on the wiring, choose which way to connect; External Analog Channel Signal Type:
According to the analog signal type of PLC output, there are generally current and voltage signals, and the signal range is determined according to the actual PLC analog output channel, commonly used 4 to 20mA, 0 to 10V; The PLC side needs to write the control program.
It can also be said to be the station number; Communication protocols.
Use communication protocols that are supported by both inverter and PLC; The PLC side needs to write a communication program!
Hope it helps!
-
It's equivalent to not saying. What we need is a parameterization**!
-
Summary. Dear, the instructions are as follows: Dear customers:
Thank you very much for choosing HHKC-GS600 inverter. In order to help you better use the inverter, this document sorts out all the contents about HHKC-GS600 inverter, including product appearance, working principle, installation implementation, operation and adjustment, maintenance, safety, etc. First, the appearance of the product Huahao Kecheng (HHKC)-GS600 inverter adopts cabinet structure design, the panel is closed with four sides, and the steel plate protective cover ensures the effective operation of the inverter in harsh environments, and the inverter provides a variety of operation modes, protection functions, output compatibility and other attractive functions.
Second, the working principle of Huahao Kecheng (HHKC)-GS600 inverter has the characteristics of high precision and high reliability. It not only has the function of three-phase speed regulation, but also has safety functions such as limit protection, soft start, and overspeed alarm. 3. Please find the platform when installing the inverter, and ensure that the machine is installed in a flat position that is not subject to vibration outside the ground before operation.
The installation should be in accordance with the instructions in the installation manual to accurately install the inverter, and correctly connect each line to avoid damage to the inverter and cables. Fourth, operation and adjustment 1Turn on the inverter, press the "OK key" to set the parameters of the inverter, and press the "OK key" to determine the parameter setting value; 2.
Set the relevant parameter setting value according to the requirements, and press the "Reset" button to reset; 3.Turn on the output switch and check whether the output of the inverter is positive.
Ask for a copy of the HHKC GS600 model inverter manual
In order to help you better use the inverter, this document sorts out all the contents about HHKC-GS600 inverter, including product appearance, working principle, installation implementation, operation and adjustment, maintenance, safety, etc. First, the appearance of the product Huahao Kecheng (HHKC)-GS600 inverter adopts cabinet-type structure design, the panel is closed on four sides, and the steel plate protective cover ensures the effective operation of the inverter in harsh environments. Second, the working principle of Huahao Kecheng (HHKC)-GS600 inverter has the characteristics of high precision and high reliability.
It not only has the function of three-phase speed regulation, but also has safety functions such as limit protection, soft start, and overspeed alarm. 3. Please find the platform when installing the inverter, and ensure that the machine is installed in a flat position that is not subject to vibration outside the ground before operation. The installation should be in accordance with the instructions in the installation manual to accurately install the inverter, and correctly connect each line to avoid damage to the inverter and cables.
Fourth, operation and adjustment 1Turn on the inverter, press the "OK key" to set the parameters of the inverter, and press the "OK key" to determine the parameter setting value; 2.Set the relevant parameter setting value according to the requirements, and press the "Reset" button to reset; 3.
Turn on the output switch and check whether the output of the inverter is positive. Often.
First, who is this inspection addressed to?
The second is the specific process of your mistakes, that is, what mistakes you have made; >>>More
Hello everyone, I am a lively and cheerful girl, my name is Song Li, after reading this name, some people may think that I am a boy, but in fact, I am a girl with a more extroverted personality. >>>More
How should I write an application correctly?
The main content of the tender can be divided into three parts: procedural terms, technical terms, and commercial terms. It contains the following nine main contents: >>>More
The construction organization design should first calculate the engineering quantity, consider the construction plan, select the construction machinery and tools, and determine the approximate number of people according to the engineering quantity. Then draw the construction schedule and adjust it continuously until the conditions of reasonable construction period and minimum cost are met. Finally, after the failure of the preparation is determined, the calculation of the material use plan, the personnel and staff species entry plan, and the safety tremor measures are broken.