-
For different seasons, the frequency of cement maintenance will be different, such as high temperature weather in summer, it should be watered every 4 or 6 hours; In other seasons, 12 24 hours can be watered.
Watering the concrete floor is for hydration, which can make the concrete ingredients tightly bound together after the plate is released; It can also play a role in heat dissipation and avoid cracks inside the concrete caused by excessive temperature.
Cement curing and watering is generally more than 7 days, and the specific curing time should be determined according to the growth of its compressive strength. Usually the time of watering and maintenance in high temperature weather should not be less than 14 days, and the time of watering and maintenance in low humidity weather should not be less than 21 days, of which the maintenance of the first 7 days is more important, and maintenance measures should be taken to avoid affecting the construction effect.
The number of days of sprinkling water on the freshly paved cement pavement
1. The cement that has just been laid basically begins to solidify after 24 hours, and the sprinkling time needs to be maintained for about 4 to 5 days. If the temperature is relatively high, this time can be extended to a week, and it is necessary to sprinkle water every day, up to several times a day.
2. If the current temperature is relatively high, every other.
One or two hours to sprinkle water again, to repeat many times a day, in order to effectively prevent the concrete surface cracking, in short, to keep the cement floor dry.
3. At the same time, you can't walk on it, and you can basically walk normally after sprinkling water for a day.
-
Under normal circumstances, cement mortar will begin to solidify after 2 hours, and you can walk around on it after 48 hours, but it takes days to completely dry, so after 24 hours, you can cover the sawdust at room temperature for 48 hours, and do not step on it during the curing period until it is stable.
How long does it take to sprinkle water to cure.
Under normal circumstances, cement mortar will begin to solidify after 2 hours, and you can walk around on it after 48 hours, but it takes days to completely dry, so after 24 hours, you can cover the sawdust at room temperature for 48 hours, and do not step on it during the curing period until it is stable.
How long do the floor tiles be laid to give the floor heat.
More than 72 hours, this time is the time to strengthen the cement cure, and if the humidity of the bottom of the billet is high, the time will be increased.
After the floor tiles are laid, how long can people go.
Dry paving: first mix with cement and sand, add little or no water, and then smooth them under the tiles, and then smear the bottom surface of the tiles with a layer of cement grout (or mix with a small amount of sand), square the tiles on top, and gently knock the surrounding areas with a mallet, which is the basic process. The weather is now about two days to dry.
Wet paving: first synthesize the sand and cement into a slurry with water, not too thin, then smooth it on the ground, and then put on the tiles, which can be dried in about 10 days. Hardly anyone uses this method anymore.
If it is floor heating, how long it takes to deflate the floor tiles is more appropriate.
More than 72 hours, this time is the time to strengthen the cement cure, and if the humidity of the bottom of the billet is high, the time will be increased.
How long does it take to lay a square meter of floor tiles.
If calculated according to the average speed, it generally takes about an hour for one person to lay one square meter of floor tiles.
-
The floor tiles can be sprinkled and cured after 24 hours of paving.
Floor tiles need to be sprinkled and cured because of the large volume of concrete, thick cement floor, etc., these large volume of cement, when the heat of hydration is high, and exposed to the air, especially in the high temperature and dry environment, shrink sharply, easy to crack. All cement must be slag Portland cement, (low heat of hydration, slow strength growth in the early stage). This is a structural requirement.
The same is true for the cement used for interior decoration. Whether the wall tiles are pasted firmly or not depends on the treatment of the base wall (according to the actual situation, the moisture content of the base wall is treated.
Flatness, you must not use the mortar pasted with wall tiles to find the vertical error of the base wall or the horizontal direction of the square error.
-
Generally, it should be maintained after 24 h in summer, and 48 h in spring and autumn, and the curing time should not be less than 7 days. It is best to spread sawdust and then water and cure, and when watering, you should sprinkle water with a watering can to keep the sawdust moist.
If slag Portland cement is used, the curing time should be extended to 14 days. During the curing period, the strength of the cement mortar surface layer is less than 5 ompa, and it is not allowed to walk on it or carry out other operations to avoid damaging the ground.
-
After the cement floor is poured, gently press it with your fingers without indentations and start sprinkling maintenance.
-
24 hours of hot weather, 12 hours.
-
The floor tile paving method generally adopts the dry paving method, and the floor tiles need to be sprinkled and maintained after the paving, let me explain it to you today.
After the completion of the floor tile paving, it should be sprinkled and maintained in a timely manner, which is said in the building decoration quality acceptance specification. The word given in the specification is timely maintenance, so it is necessary to carry out sprinkling maintenance on the day after the paving of the floor tile. Because the water evaporates quickly, we must ensure that there is moisture on the tile.
To judge whether the floor tiles need to be sprinkled with water for maintenance, in fact, the method is very simple, we just look at the surface of the tiles to see if there is water. If the surface of the floor tile has dried thoroughly and there is no moisture, then it is necessary to sprinkle water first. One of the most critical factors in sprinkling water is the need to ensure that the surface of the tile is always wet, that is, to withstand a state in which we can see the water, so the judgment method is also very simple.
-
Summary. Hello, the following is my bathroom floor tiles need to be sprinkled after paving, the general recommended maintenance time is about 7 days. The specific time may vary according to the local climate, ambient temperature and other factors, and you can ask about the maintenance time suitable for the local situation when consulting the brick laying master.
During the curing period, keep the surface of the floor tiles moist and avoid direct sun exposure or strong winds. After the curing is completed, follow-up maintenance work such as tile cleaning and waxing can be carried out. I hope to be able to help you, please give a thumbs up, thank you boss for <>
<> the floor tiles of the bathroom are paved and need to be sprinkled with water for a few days.
Hello, the following is my bathroom floor tiles need to be sprinkled after paving, the general recommended maintenance time is about 7 days. The specific time may vary according to the local climate, environmental temperature and other factors, and you can ask about the maintenance time suitable for the local situation when consulting the brick laying master. During the curing period, keep the surface of the floor tiles moist and avoid direct sun exposure or strong winds.
After the curing is over, you can carry out follow-up tile cleaning, waxing and other maintenance work. I hope to be able to help you, please give a thumbs up, thank you boss for <>
Happy Calendar Confession] <>
The bathroom is full of tiles and also needs to be sprinkled and maintained.
Yes, even if the bathroom uses full tiles, it needs to be bent to be sprinkled for maintenance, which can maintain the shine and beauty of the scrambled tiles. Tile surfaces are prone to accumulation of dirt and bacteria, and frequent sprinkling of water can effectively keep them clean and hygienic, and help prevent tile surface damage and aging. It is recommended to clean daily after use, and to perform regular deep cleaning and maintenance.
Slow down.
You can directly lay tiles on the cement floor, but if you pave them directly, it is easy to cause hollowing, and the flatness of the tiles cannot be guaranteed, so it is recommended that when laying tiles on the cement floor, you can first beat the ground to avoid problems such as unstable paving and falling off.
Originally, the floor was paved with granite.
floor tiles, re-surfacing parquet flooring. >>>More
Generally use different, because of the floor tiles of the bathroom. >>>More
It is not recommended to lay the wooden floor directly on the dusted floor, because the wooden floor forms a whole after being laid, and people walk on it to expel the empty qi below outwards and leave the expansion joints that will be left on the wall. >>>More
There are pits on the ground at home, of course, you can't lay wooden floors anymore, because such pits and pits will affect the flooring, and this quality should choose that kind of tile is relatively good, very practical.