What is the fire protection facility fee and what is the public facility fee?

Updated on society 2024-08-05
6 answers
  1. Anonymous users2024-02-15

    In order to meet the needs of economic development and fire-fighting work, improve fire-fighting facilities and equipment, for some new-build, reconstruction, expansion, and newly decorated projects, the specific charging standards for fire-fighting facilities are different in different regions.

    Take Guangzhou as an example: the specific standard for charging supporting fees for fire protection facilities: new construction, reconstruction, and expansion projects will be levied at 2 yuan per square meter of construction area from the construction unit.

    The decoration project carried out before the acceptance of the project is no longer charged, and the secondary decoration and the construction of temporary sheds after the delivery of the project shall be levied at 1 yuan per square meter of the construction area of the project decoration.

    Party and government organs, people's organizations, social welfare, medical care, education and other departments, as well as civil residences with less than seven floors (including seven floors), shall be exempted from supporting fees for fire protection facilities; The supporting fees for fire protection facilities shall be collected and settled by a designated bank entrusted by your bureau, and two lines of revenue and expenditure shall be implemented.

    And apply for the "Guangdong Provincial Administrative Fee License", and use the fee bills stipulated by the financial department.

  2. Anonymous users2024-02-14

    Supporting fees for fire-fighting facilities refer to the supporting fees for fire-fighting facilities in some places in order to meet the needs of economic development and fire-fighting work, improve fire-fighting facilities and equipment, and charge fire-fighting facilities for some new, reconstructed, expanded and newly decorated engineering projects within their administrative areas (including the external production and operation of the PLA garrison and projects involving urban planning).

    The scope and standard of fire protection facilities supporting fees.

    1. High-rise civil buildings with a building height of more than 24 meters and their underground works (including basements and semi-basements) shall be charged 4 yuan per square meter for first-class buildings and 3 yuan per square meter for second-class buildings according to their construction and decoration area.

    2. If the height of the high-rise industrial building exceeds 50 meters, it will be charged 4 yuan per square meter according to its construction area, and if it is less than 50 meters, it will be charged 3 yuan per square meter according to its construction area.

    3. Multi-storey industrial and civil complex buildings and single-storey buildings with a main body height of more than 24 meters shall be charged 2 yuan per square meter according to their construction area.

    4. Public buildings and architectural decoration projects such as hotels, theaters, shopping malls, song and dance halls, and catering industries shall be charged 4 yuan per square meter according to their construction and decoration area.

    5. Flammable, explosive, high-temperature, high-pressure, toxic and other industrial buildings, storage tanks and storage yards, according to the type of production or storage, the charging standards are: 5 yuan per square meter for class A, 4 yuan per square meter for class B, and 3 yuan per square meter for class C.

  3. Anonymous users2024-02-13

    If the cost is calculated according to the agreement between the special fire protection contract and the general contract, it shall be calculated together at the time of fire protection acceptance.

    The handler completes the on-site investigation within 5 working days, and if it is found that the conditions are unqualified but can be rectified, the rectification opinion is issued within a time limit, and the rectification report is accepted; Cost supervision and review: The manager completes the cost supervision and review within 15 working days and makes the cost supervision and review opinion. If the information is unqualified, a notice of replacement will be made.

    Within 5 working days, the handler shall review the application materials and put forward preliminary opinions according to the relevant national policies and regulations, the on-site investigation and the cost supervision and review opinions of the cost team of the Bureau. If the information is unqualified, a notice of replacement will be made.

  4. Anonymous users2024-02-12

    The explanation is as follows: the urban infrastructure supporting fee is mainly used for municipal public facilities outside the construction project, including the construction and maintenance of the city's main and secondary roads, water supply and drainage, power supply, gas supply, street lights, public transportation, environmental sanitation and landscaping, etc., which is a supplement to the municipal infrastructure construction funds, and the overall arrangement and use of various urban construction funds.

    In February 2019, the Guangzhou Municipal Bureau of Housing and Urban-Rural Development issued the Notice on Further Strengthening the Collection and Management of Urban Infrastructure Supporting Fees, reducing the charging rate for residential projects and the collection rate for scattered projects, that is, to 5% for residential projects and 5% for scattered projects. In addition, rehabilitated housing, schools and non-profit elderly care institutions will be exempted from urban infrastructure fees.

    Community projects refer to construction projects with a land area greater than or equal to 20,000 square meters. Scattered projects refer to construction projects with a land area of less than 20,000 square meters. The land area shall be subject to the area approved in the "Construction Land Approval Letter".

  5. Anonymous users2024-02-11

    The supporting fee for fire-fighting facilities is that they install fire extinguishers, induction sprinklers, pipes, and other fire extinguishing tools on your building.

  6. Anonymous users2024-02-10

    The differences between infrastructure fees and public facilities fees are as follows:

    1. The meaning is different.

    Infrastructure mainly refers to roads, heating facilities, water supply facilities, power supply facilities, gas supply facilities, communication facilities, lighting facilities, and greening related to the development of products, and the equipment and installation costs incurred in these facilities are collected in the infrastructure fee project. Infrastructure costs refer to the costs incurred in the construction of various types of infrastructure. Public facilities mainly refer to municipal public facilities and green spaces in residential areas.

    2. The content is different.

    The infrastructure supporting fee is mainly used for the construction of municipal public facilities, including the construction and maintenance of the city's main and secondary roads, water supply and drainage, power supply, gas supply, street lights, public transportation, environmental sanitation and landscaping, etc., which is a supplement to the municipal infrastructure construction funds, and the overall arrangement and use of various urban construction funds.

    Public facilities include roads, bus stations, sanitation facilities, various public pipelines and corresponding buildings and structures. Public facilities mainly include education, medical and health care, culture and sports, commercial services, administrative and community services, and green spaces.

    3. The nature is different.

    Infrastructure construction costs refer to the various infrastructure expenditures incurred in the development process of the development project, mainly including the cost of community pipe network projects such as roads, water supply, power supply, gas supply, sewage discharge, flood drainage, communications, and lighting in the development project, as well as the cost of landscape environmental sanitation and landscaping.

    The public supporting facilities fee refers to the expenditure of public supporting facilities incurred in the development project, independent, non-profit, and the property rights belong to all the owners, or donated to local ** and ** public utilities free of charge.

Related questions
15 answers2024-08-05

Common fire-fighting facilities and equipment:

1. Fire extinguishers: dry powder fire extinguishers, carbon dioxide fire extinguishers, household fire extinguishers, vehicle fire extinguishers, forest fire extinguishers, stainless steel fire extinguishers, water fire extinguishers, hanging fire extinguishers, gun fire extinguishers, fire extinguisher boxes, fire extinguisher hangers, etc. >>>More

9 answers2024-08-05

Fire Protection Act. Conduct a comprehensive inspection of the building fire protection facilities at least once a year to ensure that they are intact and effective, and the test records should be complete and accurate, and archived for future reference. >>>More

2 answers2024-08-05

Before a public gathering place is put into use or opened, its owner shall report to the public security and fire protection agency for fire safety inspection in accordance with the law, and shall submit the Application Form for Fire Safety Inspection, the Opinion on Fire Protection Design Review of Construction Projects, the Fire Protection Acceptance Opinion for Construction Projects, the fire safety management system and other relevant materials at the same time. From the date of acceptance, the personnel of the public security and fire department shall conduct an on-site inspection within four working days, and make and deliver the "Fire Safety Inspection Opinion" within three working days from the date of inspection, and agree to put it into use or open for business if it meets the fire safety conditions; If it does not meet the fire safety conditions, it will put forward rectification opinions, and the owner shall rectify it according to the requirements of the "Fire Safety Inspection Opinion" until it meets the fire safety conditions and can be put into use or opened only after passing the inspection by the fire protection agency. (Fu Dongjun).

8 answers2024-08-05

Check the signs of the fire control room and the last distribution box of each fire protection facility, as well as the meters, indicator lights, off and control buttons. Check the control mode and operation procedure of the distribution box and conduct the test: under the automatic control mode, manually cut off the main power supply of the fire fight, and observe the input of the standby fire power supply and the display of the indicator light; Under the artificial control mode, the main fire power supply should be cut off in the low-voltage distribution room, and then the backup fire power supply should be closed, and the input of the backup fire power supply and the display of the indicator light should be observed; Check the operation of the last level distribution box. >>>More

5 answers2024-08-05

1. First of all, fire detection is not difficult to learn, it should be said that it is relatively simple. Especially because all the contents of the test are done in accordance with the fire technical specifications, there are specific testing methods and standards, as long as you are serious, you can learn in a few days. >>>More