  1. Anonymous users2024-02-15

    My space has some renovation logs, to see if it is useful, they are all renovation cases.

  2. Anonymous users2024-02-14

    Writing ideas: Write down what you see, hear and feel as a supervisor in a diary.

    The rain stopped working, the rain was a bit heavy today, and the construction site was empty, but it looked like the house was growing day by day, which was interesting.

    I can't go to the construction site today, so I can read the information in the project department. I did a little research on the things in the data cabinet, and there are a lot of people's usual records in the data cabinet such as supervision diaries, side station diaries, meeting minutes, etc., and there are many materials for review, as well as some plans and plans. I saw that the data supervisor was sorting out something called the supervisor's monthly report, so I went over and took a look.

    The supervision monthly report of our project department includes: this month's project overview, project progress control, project quality control, safety and civilized construction management, opinions and suggestions on the construction unit, supervision work and work statistics, etc. The form has ** text, bound into a book, archived records.

    I think the role of the supervision monthly report is to remind everyone to be aware of the progress and quality of the project, and it is also a reflection and general of the work. After reading the monthly report of the previous months, I also had a general understanding of the previous work status of the construction site, so the monthly report is also a small window for outline.

  3. Anonymous users2024-02-13

    Guangxi Urban Construction Consulting****.

    Project Name: Debao Commercial Plaza - 1st Floor Project of Shopping Mall.

    Date: 2012-3-016 Satellite: Fri, Temperature: 22, Weather: Sunny.

    Description of the work.

    Technical management personnel present on the day.

    The owner supervises the contractor's on-site construction.

    Situation Main working face.

    and all types of work.

    Power situation 1, earthwork excavation (one excavator).

    2. Manually clean the foundation groove (5 people).

    3. Install tower crane (4 people).

    Main materials, structures.

    Accessories, machinery in.

    Field, etc. None.

    Quality supervision. Situation: On-site quality patrol.

    Depending on the inspection.

    Sampling and witness of raw materials and semi-finished products.

    Quality supervision.

    Situation A situation where there is a quality problem.

    Safety supervision. Situation On-site safety production inspection 1. Conduct a comprehensive inspection of the safe and civilized construction such as temporary electricity and mechanical equipment operation status.

    There are situations where there is a safety hazard.

    Problem handling. Situation On-site quality issues.

    Handling the situation. Handling of on-site safety issues.

    Others (record the inspection of the site meeting, the owner and the relevant management department, the correspondence or notice of the parties involved in the construction of the project, the water and power outage, etc.).

    Recorded by: Supervising Engineer Review:

    QR-Superintendent-18

  4. Anonymous users2024-02-12

    Hello, the supervision diary must have the following points must be written 1, the beginning: explain the specific time, detailed weather conditions and the name of the recorder, need to record the weather conditions of the day in detail, including the temperature of the morning, noon and evening three periods, the highest temperature and the lowest temperature of the day, the size of the wind, the amount of rainfall and so on. 2. Main contents:

    It is necessary to introduce the specific parts of the construction on the day, the number of workers, the use of raw materials and equipment, the construction progress, construction technology, acceptance results of various departments, and the problems encountered in the construction process and their solutions. 3. The next work arrangement: the main content of the supervision log records the work of the day, and the supervision personnel need to make the following work arrangements according to these, which is conducive to ensuring the smooth progress of the entire construction, however, many supervisors often do not pay enough attention to this content, once there is a problem, the entire progress will be affected.

  5. Anonymous users2024-02-11

    The special diary for supervision is in a fixed format, which stipulates what needs to be written.

  6. Anonymous users2024-02-10

    Sample format of construction supervision work log.

    1. Inspection

    Bridge: 8 piers and 6 piles, 4 piers and 6 piles, 6 piers and 3 piles and 0 sets of 2 piles are being drilled (impacted); 2. The pier foundation pit is being excavated;

    Gravel pile: except for 7 machines that did not enter the pebbles and stopped working, other pile drivers are under construction;

    DK 109 culvert sample masonry construction, a group of mortar specimens extracted;

    The jet grouting pile (DK 383 culvert treatment) was not constructed in the morning.

    2. Re-inspection

    14:30 Quality inspection engineer self-inspection No. 6 pier 3 pile after inspection: the elevation is, the depth of the hole detector is down; The bottom (pointed) of the measuring cone is; Propose to re-clear the hole.

    Quality inspection of the reinforcement cage, the length is80+, diameter, main stirrup specifications, quantity and binding welding qualified.

    17:00 Check that the butt welding of the steel bar and the binding of stirrups meet the requirements of rotten hail orange.

    The depth of the cone tip is measured as.

    The total length of the lower catheter is.

    Concrete inspection, its ratio of 150:289:454:54:, Ganzhu cement. Duty: Bai Shiqing.

    Before 19:06, the back cover of the concrete (5 hoppers) was filled, the depth of the hole was measured, and the buried depth of the conduit was. Side station:

    3. Reporting

    17:15 17:55 Report to the superintendent on the situation of the underwater C20 concrete ratio and several problems (weak technical force and pebble mud content) in the steel processing shed of the small port bridge

    The construction can be carried out according to the ratio provided by Nanchang, and the samples will be sent to the four project departments for testing in the future.

    4. **Instructions:At 21:20, the director of the representative of the ** notice, tomorrow morning at 9:30 the superior to inspect the internal and external business.

Related questions
7 answers2024-08-11

Remember the date. Meteorological conditions.

1. Explain that you have been patrolling the site; 2. Contact the construction party to confirm that the operation will be stopped in rainy days (record the date and time of the shutdown); 3. Urge the construction unit to take safety precautions for construction in the rainy season. Record it. >>>More

13 answers2024-08-11

1. Is it a framework structure and an independent foundation? >>>More

12 answers2024-08-11

There is no internet speed and there is no way to email you. >>>More

11 answers2024-08-11

There are a lot of such logs on the Internet, so you can just search for them.

8 answers2024-08-11

Let me tell you how I feel! Reading this, my heart is very heavy, and I feel that it was written by someone I know alone. The things that are written in this blog are really similar to my experience. >>>More