  1. Anonymous users2024-02-15

    Constructor, material clerk, budget clerk, safety officer, data clerk.

  2. Anonymous users2024-02-14

    1. Civil engineeringConstructor, quality inspector, safety officer, material clerk, budget clerk.

    2. InstallationConstructor, quality inspector, safety officer, material clerk, budget clerk.

    3. Municipal classConstructor, quality inspector, safety officer, material clerk, budget clerk.

    4. SupervisionCivil Supervisor, Installation Supervisor, Municipal Supervisor.

    5. GardensConstructors, quality inspectors, safety officers, and material workers.

  3. Anonymous users2024-02-13

    Now the five major construction personnel are generally referred to: construction personnel (civil engineering, electrical, HVAC), quality inspectors (civil engineering, electrical, HVAC), safety officers, data personnel, and material personnel. You can get a certificate from the China Construction Education Association for the exam, which is very easy, and sometimes if you don't have time, you can not take the exam.

  4. Anonymous users2024-02-12

    Technician, data clerk, safety officer, quality inspector, budget clerk.

  5. Anonymous users2024-02-11

    The five major personnel refer to 1. Civil engineering: construction personnel, quality inspectors, safety officers, material personnel, and data personnel. 2. Installation

    Constructor, quality inspector, safety officer, material officer, data clerk. 3. Municipal class: construction personnel, quality inspectors, safety officers, material personnel, and data personnel.

    4. Supervision: civil engineering supervisors, installation supervisors, municipal supervisors. 5. Gardens

    Constructors, quality inspectors, safety officers, and material workers.

    The specific work content of the budget clerk of the construction project budget clerk is as follows:

    First, master the management of design budget and construction budget, that is, the management of secondary calculation. Specifically, it is to do a good job in the preparation and comparison of the second calculation, and to prepare the budget for the increase or decrease of the received design changes, technical approval orders, and materials.

    Second, contract issuance control, contract planning, drafting and initiating the corresponding contract approval process for labor and professional contracting, and evaluating the performance of the contract award.

    Third, claim management, the owner does not perform or fails to correctly perform the obligations agreed in the contract and causes losses to the construction party, and the construction party must submit a claim for compensation to the owner and draft the claim documents.

    Fourth, the project settlement, according to the completion data to prepare the project settlement book, to determine the final cost of the project.

    The work of the constructor is to solve the relationship between the construction organization design and the site at the construction site, and the things in the organization design should rely on the constructor to supervise, measure, write the construction log, report the construction progress, quality, and deal with on-site problems. He is the liaison between the engineering command and the construction team.

    1. Implement the installation engineering quality evaluation standards and construction acceptance specifications issued by the state, and independently exercise the right of quality supervision and inspection and punishment in accordance with the regulations.

    2. Responsible for professional inspection and grasp the quality of sub-projects in each operation area at any time.

    3. Responsible for the assessment of the quality of the sub-project, establish the quality file, and regularly report the quality to the chief engineer of the project and the superior quality management department.

    4. Responsible for the image data recording of the construction process and construction quality of each process and concealed project of the sub-project.

    5. Report to the chief engineer of the project and the superior quality management department in a timely manner for non-conforming items, supervise the professional engineers to formulate corrective measures, and assist in the assessment of quality loss.

    Ensure that there are no safety problems during construction. Construction in strict accordance with the construction specifications, supervision at any time.

    1. Familiar with the construction process, prepare the material plan, and organize the material entry according to the plan.

    2. Be responsible for the quality of incoming materials and do a good job of tracking services. Grasp the use of materials.

    3. The materials entering the site should be stacked in different categories, and effective anti-corrosion, moisture-proof, and anti-deformation (quality) measures should be taken according to the nature of the materials.

    4. The materials that need to be re-inspected should be sent for inspection in time and correspond to the incoming materials.

    5. Timely statistics and reporting of on-site material loss.

    6. Ensure zero inventory and rational application of backlog materials.

    7. Establish material analysis files (**, source) and timely feedback to the decision-making level.

  6. Anonymous users2024-02-10

    1. Civil engineering: constructor, quality inspector, safety officer, material officer, data clerk 2, installation class: construction worker, quality inspector, safety officer, material clerk, data clerk 3, municipal class:

    Constructor, quality inspector, safety officer, material officer, data clerk 4, supervision: civil engineering supervisor, installation supervisor, municipal supervisor 5, garden: construction worker, quality inspector, safety officer, material clerk is these.

  7. Anonymous users2024-02-09

    They are: constructor, material worker, quality inspector, safety officer, budget officer.

  8. Anonymous users2024-02-08

    Constructor, material worker, quality inspector, safety officer, budget clerk.

  9. Anonymous users2024-02-07

    The five members are as follows:1. Civil engineering: constructors, quality inspectors, safety officers.

    Material clerk, budget clerk.

    2. Installation: constructor, quality inspector, safety officer, material clerk, data clerk.

    3. Municipal class: construction personnel, quality inspectors, safety officers, material personnel, and data personnel.

    4. Supervision: civil engineering supervisor.

    Installation Supervisor, Municipal Supervisor.

    5. Garden: constructor, quality inspector, safety officer, material officer.

    Material Clerk Responsibilities1. Familiar with the construction process, prepare the material plan, and organize the material entry according to the plan.

    2. Be responsible for the quality of incoming materials and do a good job in tracking services. Grasp the use of materials.

    3. The materials entering the site should be stacked in different categories, and effective anti-corrosion, moisture-proof, and anti-deformation (quality) measures should be taken according to the nature of the materials.

    4. Shenyan should send the materials that need to be re-inspected for inspection in a timely manner, and correspond to the incoming materials.

    5. Timely statistics and reporting of on-site material loss.

    6. Ensure zero inventory and rational application of backlog materials.

    7. Establish material analysis files (**, source) and timely feedback to the decision-making level.

  10. Anonymous users2024-02-06

    The five major construction personnel refer to the cost officer, construction personnel, quality inspectors, safety officers, and material personnel, and the five major personnel certificates are the corresponding certificates.

    The five major certificate levels are divided into: primary, intermediate and advanced.

    Application conditions for the five major member certificates:

    1. Primary (with one of the following conditions).

    1) Technical secondary school degree or above in this major or related major.

    2) Engaged in the profession for more than 2 years.

    2. Intermediate (with one of the following conditions).

    1) College degree or above in this major or related major.

    2) Continuously engaged in the profession for more than 4 years.

    3) Obtain the primary certificate of the profession and have been engaged in the profession for more than 2 years.

    3. Advanced (with one of the following conditions).

    1) Bachelor degree or above in this major, and have been engaged in this profession for more than 2 years.

    2) College degree or above in this major in travel, and have been engaged in this profession for more than 4 years.

    3) Obtain the intermediate certificate of the profession and have been engaged in the profession for more than 3 years.

    The curriculum of the five major certificate examinations:

    Budgeter: "Architectural Drawing", "Housing Construction", "Construction Quota and Budget", "Building Construction Technology".

    Constructors: "Building Mechanics", "Building Materials", "Building Structure", "Building Construction Technology".

    Quality inspector: "Quality Accident Allocation Town Sui Analysis", "Building Construction Technology".

    Materials: "Building Materials", "Building Construction Technology".

    Safety officer: "Safety Production Technology and Management Technology", "Construction Enterprise Management".

  11. Anonymous users2024-02-05

    The five major construction personnel refer to cost personnel, construction personnel, quality inspectors, safety officers, and material personnel. These five are the foundational positions for each function in the construction industry. After the state implemented the certificate system for the industry, more and more students who have received formal construction and burial education have passed the examination to apply for the "five majors", and on this basis, they have grown into senior talents in the industry.

    Therefore, in this industry that emphasizes experience, the "Big Five" can often open the door for fresh graduates and become the "cornerstone" for them to enter the industry.

    Extended Materials. 1. Budget officer:

    In the field of construction engineering, the budgeter has four main responsibilities: first, to master the design budget and construction budget management; second, the control of the contract issuance; third, claims management; Fourth, project settlement.

    These four responsibilities indicate the general requirements for enterprises to recruit budget officers: college degree or above, civil engineering and related majors, and hold a budget officer certificate, with basic knowledge of engineering construction, familiar with all kinds of building materials and processes, familiar with engineering quantity calculation rules, familiar with various related software operations.

    2. Constructor:

    As the name suggests, the construction worker is mainly to solve the on-site construction problems and give guidance to the on-site construction personnel. Because the foundation of the construction worker's work is stronger, the company likes to recruit some fresh graduates who can endure hardships, so that they can start the training of the construction industry in this position. Of course, there are also companies that are very strict with experience.

    Constructor is a necessary position for every project, and the demand for talents is particularly large. With the continuous deepening of economic development and road network renovation and urban infrastructure construction, coupled with the continuous development of the individual housing market, it can be said that construction workers have good employment prospects.

    3. Material clerk:

    The work of the material clerk is mainly to try to achieve zero inventory on the premise of ensuring the material, and to effectively keep the material. Construction is a low value-added industry, in its cost composition, the material content of residual materials accounts for 70% or more, so material management is the top priority of the business management of construction enterprises, which has a decisive impact on the profit and loss of construction enterprises.

    4. Quality inspector:

    The inspector should sign on behalf of the company on the quality inspection, conduct spot checks and reviews on the quality of the project, and supervise and assist the material staff to control the quality of the material. It can be said that the quality inspector is the first "gatekeeper" of the quality of the project.

    5. Safety officer:

    The main task of the safety officer is to be responsible for the overall management of safe production and civilized construction. The work of the safety officer is relatively simple, mainly to implement the national and local safety management regulations, establish the safety assurance system and various safety systems of the project according to these regulations, and then supervise the implementation.

    The recruitment of safety officers generally requires that the incumbent is very familiar with the safety operation procedures of building construction, has rich experience in on-site safety construction management, safe electricity use, and temporary water and electricity management, and holds a safety officer certificate.

  12. Anonymous users2024-02-04

    <> five major engineers refer to the project manager, designer, quality engineer, constructor and material worker. These five positions play an important role in a single engineering project, with different responsibilities such as project management, project design, quality control, on-site construction and material deployment.

    Each position has its own unique skills and knowledge requirements, and only when these five positions work closely together can we complete a high-quality SEH engineering project.

    In addition to the five major engineering officers, a complete engineering project also requires the participation of other professionals, such as safety officers, environmental protection specialists, buyers, etc. Each professional has their own scope of responsibility and skill requirements, and working together is required to make the project run efficiently and achieve the desired goals.

    The project manager plays a role in the overall planning, organization and command, coordination and management, and risk response in the project. The blind designer is responsible for the survey, design and scheme development according to the project requirements.

    The quality engineer ensures the quality of the project through comprehensive quality control and supervision. The constructor is usually a site manager who is mainly responsible for the command and arrangement of the construction site.

    The material clerk is to procure, order and order raw materials, components and other materials to ensure that the materials required for on-site construction are sufficient.

    The responsibilities of these five engineers and other professionals are different, but working together to complete the project allows the entire project to run efficiently and smoothly and meet the customer's requirements.

Related questions
15 answers2024-08-06

Constructor: "Building Materials", "Building Mechanics", "Building Structure", "Building Construction Technology". >>>More

20 answers2024-08-06

The eight members of construction refer to the eight major personnel of key technical positions in construction enterprises, which redefine the professional standards of construction site professionals in the new JGJ T250-2011 standard, which was released on July 13, 2011 and implemented on January 1, 2012. The eight members are as follows: >>>More

2 answers2024-08-06

Regarding the qualification certificate in engineering and construction, I often hear about the nine members and the five members. Whether it is the nine members or the five members, their essence is the same, but there are some differences in scope and division of labor. >>>More

5 answers2024-08-06

School of International Relations, School of Foreign Affairs,Beijing Institute of Electronic Science and Technology, China Criminal Police College, Shanghai Customs College. >>>More

10 answers2024-08-06

The theory of the five famous kilns of the Song Dynasty was first seen in the Ming Dynasty royal collection catalogue "Xuande Ding Yi Spectrum": "The firewood, Ru, official, brother, Jun, and named kiln utensils in the inner library, the style is elegant, and the picture is submitted." Xu Zhiheng of the Qing Dynasty said in "Drinking Liuzhai and Saying Porcelain": >>>More