Generally speaking, the feasibility study report of a project prepared by a professional organization should include six parts: cover, abstract, objective, body, annexes and drawings. 1.Cover:
Generally, it should reflect the name of the feasibility report, the name of the professional research preparation institution and the time when the report was prepared. 2.Summary:
It is to summarize the general situation of the project, the market situation, the conclusion of the feasibility study and the relevant explanations or assumptions in concise and clear language, so that the reader can understand the essence of the whole report in a short time. There are also experts who advocate not writing an abstract because the feasibility study report is very important and the reader should read it carefully and thoroughly. 3.
-
The cost of writing a feasibility study report is divided into a one-time fee (some are 1-30,000 yuan) and a sectional fee (a certain fee is charged when preparing the report, and a certain fee will be paid after the project is approved or withdrawn according to a few percent of the application fund).
In addition, the more funds applied for, the more significant the project, and the higher the cost of writing the project application report and feasibility study report. For example, if you apply for a grant of 10 million, the cost of writing a feasibility study report will be hundreds of thousands (not less than 200,000). Some could even be a million.
-
According to the fee standard and the depth of the research of the report, the project application report and the feasibility study report are the same.
However, in practice, the situation of different projects is quite different, mainly depending on the owner's attention to the report and the capital, hehe.
-
Analyze the fee standard of feasibility study report from six points.
1. Feasibility study report on enterprise financing and foreign investment cooperation. This kind of research report usually requires accurate market analysis, reasonable investment plan, and provides actual operation plans such as competitive analysis, marketing plan, management plan, and technology research and development.
2. Feasibility study report, project proposal and project application report of the National Development and Reform Commission (formerly the Planning Commission). This document is formulated in accordance with the "Administrative Licensing Law of the People's Republic of China" and the "Decision on the Establishment of Administrative Licensing for Administrative Examination and Approval Matters that Really Need to Be Retained", and is a basic document. It is used to build large-scale infrastructure projects.
Based on the feasibility study, the NDRC will approve, file or approve and decide whether to implement a project. In addition, pharmaceutical companies are also required to prepare feasibility study reports when applying for relevant certificates.
3. Bank loan feasibility study report. When a commercial bank conducts a risk assessment before lending, it is required to issue a detailed feasibility study report of the project party. For domestic banks such as China Development Bank, if the report is issued by an A-level qualified unit, there is usually no need to organize an expert review.
Qualifications are not required for a loan feasibility study report.
However, it requires a sound financing plan, proper analysis, and comprehensive information. In addition, when applying for national policy support funds and industrial and commercial registration, it is often necessary to prepare a feasibility study report. This document is similar to a feasibility study for bank loans.
4. Feasibility study report and project application report for approval of overseas investment projects. When enterprises implement the "going out" strategy and invest in overseas mineral resources and other industries, they need to prepare a feasibility study report or project application report.
Submit to the National Development and Reform Commission or the Provincial Development and Reform Commission. Overseas key investment projects need to apply for credit from the Export-Import Bank of China. When supporting, a feasibility study report and a project application report should also be provided, with detailed provisions.
5. Feasibility study report for the company's listing. This kind of feasibility report usually requires a Class A engineering consulting qualification issued by the state.
6. Feasibility study report on applying for first-class funds (Ministry of Science and Technology, Ministry of Agriculture). This kind of feasibility report usually requires a Class A engineering consulting qualification issued by the state.
The above content refers to: Chengdu University - Fee Standard for Feasibility Study Report and Project Application Report.
-
According to the provisions of the National Development and Reform Commission, the "Interim Provisions on Consultation Fees for Preliminary Work of Construction Projects" are as follows, and the actual fees will be adjusted according to the market.
10,000 yuan, 30 million yuan, 100 million yuan, 100 million yuan, 500 million yuan, 500 million yuan, 1 billion yuan, 5 billion yuan, more than 5 billion yuan.
1. Prepare the project construction book 6-1414-3737-5555-100100-125
2. Prepare the feasibility study report 12-2828-7575-110110-200200-250
3. Evaluation project proposal 4-88-1212-1515-1717-20
4. Evaluation feasibility study report 5-1010-1515-2020-2525-35
However, in general, the fees of companies that do feasibility studies will be much lower and more preferential than the standards of the above-mentioned document regulations. Wuhan Wenda Consulting has rigorous feasibility study data, quality assurance, and very favorable fees, hoping to help you. Thank you!
-
According to the amount of investment to charge, the charging standard can be found in the document ** 1999 1283, but the general charge to the enterprise can only be used as a reference, on this basis discount, otherwise the enterprise can not afford the high fee standard
-
Notice of the State Development Planning Commission on Printing and Distributing the Interim Provisions on Consultation Fees for the Preliminary Work of Construction Projects (Ji ** [1999] 1283), specifically.
-
Please check the consultation fee schedule.
-
Summary:1. Feasibility study report fee standard 1, feasibility report fee (1) preparation fee: according to different project types, the preparation fee ranges from 1,000-10,000 yuan.
1. Feasibility study report fee standard 1, feasibility report fee book letter digging (1) preparation fee: according to different types of state audits, the preparation fee ranges from 1,000-10,000 yuan.
Generally, it is charged according to the size and complexity of the project regulations. For example, for large-scale projects (with an investment of more than 100 million yuan), the preparation cost is 2,000-3,000 yuan; Medium-sized projects (Yeqin investment in 50 million to 100 million yuan) preparation cost of 1500-2000 yuan; The preparation cost of small projects and simple projects (with an investment of less than 5 million yuan) is 1000-1200 yuan.
2) Appraisal and consulting fees: According to different consulting methods and contents, appraisal and consulting fees range from about 200-1000 yuan. (3) Examination and filing fee:
(4) The cost of achievement materials: between 100-300 (5) the review conference fee and travel allowance such as transportation and accommodation: between 200-800.
Note: The above ** is for reference only, and the actual provisions of the local price department shall prevail) Charging basis: "Law of the People's Republic of China", "Notice of the State Development Planning Commission on Issues Concerning the Standardization of Engineering Consulting Fees and Fees" (Ji ** 2001 2084), and the "Notice of the State Development Planning Commission on Adjusting the Charging Standards for the Preliminary Work of Some Construction Projects" (Ji Ban Investment [2006] No. 532).
2. Charges for energy-saving assessment reports (1) The charging standards for energy-saving special evaluation reports are in accordance with the notice of the General Office of the National Development and Reform Commission on printing and disseminating, and the special energy-saving evaluation reports are subject to guidance price standards, such as the nuclear year: (1) The energy-saving special evaluation report of the new fixed asset investment project is about 300-400 yuan per item; (B) the existing enterprise technical transformation project energy conservation special evaluation report of about 400-600 yuan each; (3) The energy audit of existing buildings is about 100-200 yuan per revision. (4) The charges for other related services stipulated in the Energy Conservation Law of the People's Republic of China shall be implemented with reference to the above standards.
Second, the feasibility study review process 1, the construction unit to the Municipal Department of Draft Reform and Reform of the feasibility study of the application for approval, the construction unit with the project approval documents or approval documents to the city to submit an application and fill in the "Beijing fixed assets investment project approval form". 2. Entrust some design units to design the city, and entrust design units with corresponding qualifications to carry out preliminary design and construction drawing design for investment projects.
-
For example, engineering projects (construction, municipal) shall be charged according to the work fee stipulated by the State Planning Commission; Social undertakings (education, health, etc.) shall be charged according to the cultural, educational, scientific and health expenses prescribed by the State Development Planning Commission; Agricultural projects (agriculture, forestry and water conservancy) can be implemented according to the standards formulated by the Provincial Price Bureau. 2. The fee for the feasibility report generally includes: the fee for the preparation of the feasibility report and the fee for the preparation of the review advisory opinion.
3. For projects with an investment amount of less than 10 million, the cost of the feasibility report shall be determined by both parties through negotiation. 4. For projects with an investment scale of more than 10 million yuan or high technical requirements, the feasibility report fee can be appropriately increased according to the specific conditions of the project. 5. The feasibility study of the procurement of equipment, special and important raw materials can be charged according to the engineering category.
Hello: The fee for the feasibility study report starts from 2,000-10,000 yuan.
Relevant information: 1. The fee for the feasibility report has different standards according to different project categories. For example, engineering projects (construction, municipal) shall be charged according to the work fee stipulated by the State Planning Commission; Social undertakings (education, health, etc.) shall be charged according to the cultural, educational, scientific and health expenses prescribed by the State Development Planning Commission; Agricultural projects (agriculture, forestry and water conservancy) can be implemented according to the standards formulated by the Provincial Price Shock Bureau.
2. The fee for the feasibility report generally includes: the fee for the preparation of the feasibility report and the fee for the preparation of the review advisory opinion. 3. For projects with an investment amount of less than 10 million yuan, the cost of the feasibility report shall be determined by both parties through negotiation.
4. For projects with an investment scale of more than 10 million yuan or high technical requirements, the feasibility report fee can be appropriately increased according to the specific conditions of the project. 5. The feasibility study of the procurement of equipment, special and important raw materials can be charged according to the engineering category.
-
Summary:Dear, hello, the feasibility study report will be more expensive according to the charging standard, and the starting price is tens of thousands. However, the current consulting companies will not charge according to the ***, and it will be relatively cheaper.
The following are the standards for the fees for feasibility study reports.
Dear, hello, the feasibility study report will be more expensive according to the charging standard, and the starting price is tens of thousands. However, the current consulting companies will not charge according to the ** of the Filing and Reform Commission, and it will be relatively cheaper. The following are the standard spring foolish wisdom of the feasibility study report fee stipulated by the first answer.
Explain the reasons, basis, and purpose of the project, what are the subjective and objective conditions for implementation, point out the existing problems, or put forward relevant suggestions. >>>More
All should be regular, and have a fixed format and fixed content, and the table of contents is as follows: >>>More
The focus of various feasibility studies varies greatly, but generally should include the following: 1. Investment necessity. Mainly based on the results of market research and development, as well as relevant industrial policies and other factors, the necessity of project investment and construction is demonstrated. >>>More
The outline is based on the following format, which can be adjusted specifically in Table of Contents 1 >>>More
1. The content of the research is different. The project proposal is the preliminary selection of the project, which determines whether the next step is needed, and mainly examines the necessity and feasibility of the proposal. The feasibility study needs to conduct a comprehensive and in-depth technical and economic analysis and demonstration, compare multiple options, recommend the best plan, or reject the project and put forward sufficient reasons to provide a reliable basis for the final decision. >>>More