What are the precautions for the installation of color steel plates

Updated on home 2024-02-09
8 answers
  1. Anonymous users2024-02-05

    Nothing else, mainly waterproof. Because this matter of survival is very troublesome.

  2. Anonymous users2024-02-04

    1. After the color steel plate is transported to the site, the product qualification certificate and related documents should be issued, and the inspection procedures should be done. There should be no scratches on the surface of the color steel plate, and its geometric dimensions should meet the requirements of the design drawings.

    2. Do not tear off the plastic protective film on the surface of the wall plate during installation, and it is forbidden to hit and step on the surface of the wallboard. Accessories and various materials should be strictly inspected for their specifications, performance and integrity, and unqualified or damaged accessories are strictly forbidden to use.

    3. All installation gaps in the clean area should be sealed with silica gel, and the installation gaps must be strictly cleaned before gluing to remove impurities and oil stains, ensure that the paste is dense, and prevent falling off and dust accumulation. The surface of the silicone should be smooth and not wrinkled.

    What are the specific installation steps of the color steel plate partition wall?

    1. First of all, we need to set the size of the color steel plate according to the drawing, measure the doors and windows of the partition wall, and determine the type of the color steel plate.

    2. Next, it will be processed in the factory, and the color steel plate will be produced into a standard plate according to the relevant specifications, and it can be directly installed on site.

    3. After arriving at the scene, you need to draw the line of the color steel plate projection on the ground, and at the same time, the position of the doors and windows, including the center line, etc., should be kept within a reasonable range, and the error should not be too large.

    4. Next, the aluminum alloy profile should be installed, and the nail should be used for fixing. Assemble the components according to the design drawings and install the fixed inserts in place.

    5. Finally, install the ceiling plate, pay attention to the color steel plate, as well as the yin and yang angles and other parts to be installed firmly, pay attention to the direction of opening, and then paste with sealing silicone. For example, the gap between the glass and the window frame needs to be sealed with silicone to achieve the curing effect.

  3. Anonymous users2024-02-03

    Hello, the safety of the color steel composite plate factory when producing the color steel color plate operation can include the following measures: to ensure that the operator has received the necessary safety training, and master the correct operation methods and precautions. Provide the necessary personal protective equipment (e.g. helmets, glasses, gloves, etc.) and make sure everyone is wearing them correctly.

    Carry out regular maintenance of machinery and equipment to ensure that it is in good condition and avoid accidents caused by mechanical damage. Set up warning signs and isolation areas at the job site to remind personnel to pay attention to safety and avoid others from entering the dangerous area by mistake. Properly manage items or tools that may cause disasters or accidents, and check for leaks or other potential safety hazards before use.

    Comply with relevant laws and regulations and corporate safety rules and regulations, strictly implement operating procedures, and ensure that no harm will be caused to yourself and others during the operation.

  4. Anonymous users2024-02-02

    The installation method of the color steel plate room is as follows

    1. First of all, measure whether the size of the axis of each wall base meets the requirements of the drawing, and require that the deviation of the local line size should not be greater than 25mm, and the deviation of the height of the measured wall base should not be greater than 10mm.

    2. The materials are unloaded first, and the materials are reasonably transported to each construction point, so that they can be done in one step, and they should be handled gently when handling to avoid damage to the materials.

    3. According to the size of the drawing, first buy the chassis iron and fix it with the foundation with expansion screws.

    4. Steel structure assembly, first of all, the square pipe and the steel beam are assembled with screws one by one, and the bolts must be tightened when assembling, check whether the steel beam is vertical, whether it is in the same plane, and whether the size of the component meets the requirements until all are satisfied.

    5, the assembled steel structure is installed one by one, the first steel beam is supported at first, the steel beam is supported firmly with a steel pipe column after the steel beam is supported, and the first beam is adjusted with a plumb line, so that it is perpendicular to the ground, the size is measured with a steel tape measure, and then the second beam is supported, the installation is the same, and then the piece beam is installed, the piece beam and the main beam are fixed with studs, and the rest of the main beam and the piece beam can be installed in place according to the above steps, and check whether the position of the steel beam is correct again, if there is a deviation, it needs to be adjusted.

    6. After confirming that it is correct, weld the horizontal support and the frame in the steel beam with an angle iron, and then weld the square pipe column and the chassis angle iron.

    7. After the installation of the main beam, install the floor slab. The slabs should be dense between the slabs.

    8. After the floor is paved, start to install the wall panel, when installing the wall panel, reserve the position of the doors and windows, wait for the external wall to be installed, start to install the roof, cover the roof, first complete the top plate, including the eaves board, waterproof treatment, roof cover, etc.

    9. After the overall installation of the house, the installation of doors and windows should be carried out, the installation of the window should be dense, and there should be no gap with the wall panel, and the waterproof treatment should be carried out after the installation of the window, and the installation of the door should be flat and straight.

    10. Install stairs and railings, require the railings to be straight and firmly connected with the railing columns, the stair tread adopts angle steel stairs, the stairs should not shake, the stairs are fixed with the gable, and the railing plates are fixed with 75mm self-tapping screws and the stairs.

    11. The upper floor is poured by the user, and the lower ceiling is carried out after the installation of wires, and the gasket should be placed in the gusset nail to prevent the gusset from falling.

    12. Self-inspection will be carried out after the completion of the project.

    13. Conduct overall acceptance of the house in conjunction with the user.

  5. Anonymous users2024-02-01

    1. The deviation between the color steel plate and the verticality shall not be greater than 10mm.

    2. The color steel plate and the foundation must be firmly connected, and the fixing screws must be missing.

    3. The joints between the color steel plate and the aluminum groove and the aluminum mold jujube window must be coated with sealant.

    4. There shall be no obvious gap between the plates.

    5. After the installation of the gutter and wind edge is completed, the sealant must be checked to see if it is complete.

    6. When the plate and aluminum are fixed, the core-pulling rivets must be cracked neatly, and the spacing shall not be greater than 400mm.

    7. The installation of aluminum windows must be firm and complete.

    8. The roof is sprayed with profiled tiles, and the splicing shall not be less than one corrugation, and the joints of the ridge tiles must be smooth and well-sealed.

    9. The downspout should be installed firmly to maintain the verticality of the disassembly.

    10. After the completion of the project, clean up all the dust and garbage, so that the windows are bright and the lights are on, and the color steel plates on the exterior walls are clean and tidy.

    11. The exposed iron parts must be painted with anti-rust paint, the exposed foundation cement stucco, and the aluminum alloy at the root of the wall must be pressed firmly and not exposed.

  6. Anonymous users2024-01-31

    First of all, use a steel plate press to press out the caulking shape, and then like ants moving big insects, everyone works together to caulk the two color steel plates, and then put down the other piece, in short, let the two plates bite together. Just like that, one by one. After the entire roofing panel is completed, the occlusal gap of the two steel plates is pressed by the plate pressing machine, which is completely firm and will not leak.

    Place the ridge plate at the ridge again, connect it with the color steel plate with bolts, seal the bolts with neutral silicone anti-mildew and weather-resistant adhesive, and finally use foam to dense the gap between the ridge board and the roof panel.

  7. Anonymous users2024-01-30

    Depending on what part it is installed in, it is generally fixed with self-tapping screws.

  8. Anonymous users2024-01-29

    How to install 820 color steel plate? How do I fix the bracket?

Related questions
11 answers2024-02-09

Now that the character is normal and can enter WOW, then directly put the big foot in the folder where you are and click Update. >>>More

15 answers2024-02-09

It may be that you are usually too serious, on some occasions, show yourself appropriately, revealing your rich words will cause disgust, people will have feelings in the process of familiarization, so the most important thing is that you have to show yourself, like expressing your own opinions in communication with same-sex friends, when you go out to play, pay more attention to the friends around you, and small things can also reflect a person's charm.

5 answers2024-02-09

Author: MW HDS - Probationary Period Level 1 Don't talk nonsense!! An installation disk is nothing more than ***5 (the Blu-ray can't be that big). >>>More

5 answers2024-02-09

In fact, you can go online to find the operating system serial number, find a place to put it yourself, and it's OK!! >>>More

8 answers2024-02-09

Installation:1The installation of the anti-rat plate is very simple, first insert the expansion nail into the installation eye on the card slot, and then fix the expansion nail parallel to the wall on both sides of the door frame along the door frame, and the card slot is successfully installed! When using, you can put the anti-rat plate smooth. >>>More