-
Environmental engineering (water pollution prevention and control engineering) is requiredDesign Qualifications。The design qualification is divided into Class A and Class B, and the design qualification is determined according to the scale of sewage treatment capacity.
1. Understand the basic knowledge of sewage treatment.
2. Understand the role and management methods of various structures in the sewage treatment plant.
3. Understand the distribution and use of various pipelines in the sewage treatment site.
4. Understand the meaning and application of analytical indicators in sewage treatment system.
5. Employees should have the ability to reasonably distribute water and sludge, reasonably dispatch air, correctly return and discharge sludge, and eliminate common faults in operation.
Function. The role of the sewage treatment station is to produce and domestic sewage.
Carrying out treatment to meet the specified emission standards is to protect the environment.
important facilities. industrially developed countries.
sewage treatment stations are already very common, and there are very few sewage treatment stations in villages and towns in China, but they will gradually increase in the future. In order for these sewage treatment stations to really function, they also need to rely on strict discharge systems, organization and management systems to ensure them.
The above content refers to: Encyclopedia - Sewage Treatment.
-
Municipal comprehensive qualification; Municipal drainage professional qualification or environmental engineering (water pollution prevention and control engineering) special design qualification. Among them, the environmental design qualification is divided into Grade A and Grade B, and the requirements are: Grade B for less than 20,000 tons per day (inclusive), and Grade A for the above; It does not include pipe network and factory office buildings.
Therefore, it is best to find a comprehensive municipal qualification, and the pipe network and office building can be done together.
-
1. Grade A qualification for water pollution prevention and control.
1. 2 registered power supply and distribution engineers;
2. 1 registered HVAC engineer;
3. 2 registered first-class structural engineers;
4. 3 registered water supply and drainage engineers;
5. 2 budget estimation professionals;
6. 6 senior environmental protection engineers, 7. 3 intermediate environmental engineers;
8. 2 senior mechanical engineers;
9. 2 automatic control professionals.
2. Class B qualification for water pollution prevention and control.
1. 1 senior mechanical engineer;
2. 2 registered water supply and drainage engineers;
3. 1 automatic control professional;
4. 4 senior environmental protection engineers, 5. 2 environmental intermediate engineers;
6. 1 registered power supply and distribution engineer;
7. 2 budget estimation professionals;
8. 1 registered first-class structural engineer.
To sum up, a total of 23 professional and technical personnel are required for Class A qualifications and 14 for Class B qualifications. Among these specialties, automatic control, budget estimation, and some environmental professionals are required to do performance.
-
1. Municipal comprehensive qualification;
2. Drainage professional qualification or environmental engineering special design qualification in municipal administration;
3. Grade B environmental design qualification for 20,000 tons or less per day;
4. Grade A environmental design qualification for more than 20,000 tons per day;
5. It does not include pipe network and office buildings in the factory area.
-
The design of the sewage treatment station requires the "special design qualification certificate for environmental pollution prevention and control projects".
Design Qualification Grading Criteria:
1) The environmental engineering design unit that holds the Grade A "Design Certificate" shall undertake the design scope of the environmental engineering project and is not limited by the regional and engineering investment limits.
2) The environmental engineering design unit holding the Grade B "Design Certificate" can undertake the design of the following environmental engineering projects with a total investment of less than 5 million yuan
1. Wastewater treatment project.
Wastewater treatment projects with industrial wastewater volume not exceeding 3,000 tons per day and COD not exceeding 3 tons per day.
2. Waste gas treatment project.
1) Waste gas treatment project when the industrial exhaust gas volume does not exceed 60,000 cubic meters;
2) Smoke and dust removal facilities for a single boiler and general industrial kiln with a capacity of no more than 60 tons.
3. Solid waste treatment project.
Treatment of solid wastes other than toxic and harmful.
4. Noise control project.
3) The environmental engineering design unit holding the Grade C "Design Certificate" can undertake the design of the following environmental engineering projects with a total investment of less than 1 million yuan
1. Wastewater treatment project.
Wastewater treatment projects with industrial wastewater volume not exceeding 500 tons per day and COD not exceeding tonne per day.
2. Waste gas treatment project.
1) Waste gas treatment facilities when the industrial exhaust gas volume does not exceed 15,000 cubic meters;
2) Smoke and dust removal facilities for a single boiler and small kiln with a capacity of no more than 20 tons.
3. Solid waste treatment project.
Treatment of other small solid wastes except toxic and hazardous wastes.
4. Noise control project.
Industrial workshops and other noise control projects can be designed.
-
1. There are more than 3 technical personnel with intermediate or above professional titles in environmental engineering or related majors, and more than 3 years of experience in solid waste pollution control;
2. There are transport vehicles that meet the safety requirements of the transportation department of the relevant dangerous goods;
3. There are packaging tools, transit and temporary storage facilities and equipment that meet national or local environmental protection standards and safety requirements, as well as storage facilities and equipment that have passed the experience;
4. There are disposal facilities, equipment and supporting pollution prevention and control facilities that meet the national or provincial, autonomous region and municipality construction plans for hazardous waste disposal facilities, and meet national or local environmental protection standards and safety requirements, among which medical waste centralized disposal facilities shall also meet the national health standards and requirements for medical waste disposal;
5. Have disposal technologies and processes that are compatible with the types of hazardous wastes operated;
6. Rules and regulations, pollution prevention and control measures and accident emergency rescue measures for hazardous waste management safety;
7. If hazardous wastes are disposed of by landfill, the land use right of the landfill site shall be obtained in accordance with the law.
What qualifications are required for civil engineering contracting?
The general contracting of construction projects requires the following qualifications:
1. The registered capital of the enterprise is more than 300 million yuan;
2. The net assets of the enterprise are more than 100 million yuan;
3. The business tax paid by the enterprise in the past three years is more than 50 million yuan;
4. The credit line of the enterprise bank has been more than 500 million yuan in the past three years.
[Legal basis].Article 13 of the Measures for the Administration of Hazardous Waste Business Licenses.
The comprehensive hazardous waste operation license is valid for 5 years; The hazardous waste collection business license is valid for 3 years.
Upon the expiration of the validity period of the hazardous waste business license, the hazardous waste business unit continues to engage in hazardous waste business activities, and shall submit an application for renewal to the original licensing authority 30 working days before the expiration of the hazardous waste business license. The original issuing authority shall conduct a review within 20 working days from the date of accepting the application for card replacement, and if it meets the requirements, it shall replace the card; If the conditions are not met, the applicant shall be notified in writing and the reasons shall be explained.
Article 14. If a hazardous waste business entity terminates its business activities of collecting, storing and disposing of hazardous waste, it shall take pollution prevention and control measures for its operating facilities and sites, and properly dispose of the undisposed hazardous waste.
Hazardous waste business units shall, within 20 working days from the date of taking the measures specified in the preceding paragraph, submit an application for cancellation to the original licensing authority, and cancel the hazardous waste business license after the original licensing authority conducts on-site verification.
-
Qualifications required to design a wastewater treatment plant: Destroyed.
1. Municipal comprehensive qualification;
2. Drainage professional qualification in municipal administration or special design qualification for environmental engineering;
3. Grade B environmental design qualification for 20,000 tons or less per day;
4. More than 20,000 tons of tomato per day must have Grade A environmental design qualification;
5. It does not include pipe network and office buildings in the factory area.
Jiangsu Jiangcheng Environmental Protection Equipment Engineering is located in the eastern suburbs of Yangzhou City, a famous historical and cultural city, at the intersection of Ningtong Expressway and Beijing-Shanghai Expressway. >>>More
Of course, it is a harmful type of work, our factory mainly treats domestic sewage, to put it bluntly, it is the residents' toilet flushing water, there are a lot of E. coli, but this is not the most harmful, the most harmful thing in the general sewage treatment plant is hydrogen sulfide gas, if the concentration is high for a few seconds, it can make people die, even if the concentration is low for a long time, it will have an impact on the human body.
ORP** monitoring can reflect the relative amount of oxidizing substances or reducing substances in the pool, ORP** monitoring can also reflect the quality of redox progress, and the use of ORP indicators to adjust the process flow can play a role in half the effort. Longpai (Henan) Plumbing and Environmental Protection is a professional and efficient production of water treatment equipment, reclaimed water reuse equipment, sewage treatment equipment, water purification treatment equipment, water supply equipment, heat exchanger, air conditioning, etc. Longpai water treatment equipment is sold all over the country, and has been unanimously recognized by everyone, with national delivery and national door-to-door guidance and installation.
It is recommended to use defoamers in a targeted manner, and food additive defoamers may not have a very good defoaming effect in sewage treatment.
Eight major measures for the prevention and control of sewage: 1. Strictly control the total amount of pollutant discharge, continue to reduce industrial pollution, promote the zero discharge system of wastewater recycling and closed circuit for key polluting industries such as steel, electric power, chemical industry, and coal, and effectively strengthen the audit and supervision of polluting discharge units. 2. Accelerate the construction of water-saving industry and water-saving society. >>>More