There is a proportion of random inspections for the filing of fire protection design of construction projects, while the fire protection design review of construction projects is 100% checked.
The specific proportion of random inspections is as follows:
1) Places of public entertainment (random inspection ratio: 90%):
2) Other public gathering places (random inspection ratio: 85%):
3) Other crowded places (random inspection ratio: 80%):
4) Office (spot check ratio: 75%)
5) Residential (random inspection ratio: 70%)
6) Plant (random inspection ratio: 60%)
7) Warehouse (random inspection ratio: 50%)
8) Others (random inspection ratio: 40%)
-
1. The fire protection design filing does not belong to the administrative license, and the fire protection design review belongs to the administrative license;
2. The fire protection design record may be drawn, and the fire protection design review must be declared to the fire protection agency;
3. The fire protection design record can be declared on the Internet, and the fire protection design review must be declared to the fire protection agency;
4. If the fire protection design is qualified or unqualified, the results shall be announced on the Internet, and if the fire protection design is qualified or unqualified, the public security and fire protection agencies shall issue a legal document with a seal "Construction Project Fire Protection Design Review Opinion";
5. The time limit for handling is to announce the results within 30 working days for the fire protection design filing, and to issue legal documents within 20 working days for the fire protection design review.
-
According to the "Interim Regulations on the Management of Fire Protection Design Review and Acceptance of Construction Projects", Order No. 51 of the Ministry of Housing and Urban-Rural Development.
Article 16 The construction unit shall submit the following materials when applying for fire protection design review:
1) Application form for fire protection design review;
2) Fire protection design documents;
C) according to the law need to handle the construction project planning permit, shall submit the construction project planning permission documents;
4) Approval documents shall be submitted for temporary buildings that require approval in accordance with the law.
The specific fire protection design documents include: fire protection part design drawings; Fire protection design; design drawings of decoration and decoration parts; Decoration design;
By the professional fire protection design team of "Yiji Network"! Fire protection design, review to find "Yiji network"! Hassle-free design; Hassle-free review!
-
Application materials: 1) construction project fire protection design filing declaration form;
2) The industrial and commercial business license and other legal identification documents of the construction unit;
3) Qualification documents of the design unit;
4) Fire protection design documents (for specific content, see Liaoning Fire Protection Network Fire Office Hall - Normative Documents - Requirements for the Declaration of Fire Protection Design Documents for Construction Projects);
E) new construction, expansion project planning permission documents (construction project planning permit);
6) Temporary buildings that need to be approved by the competent departments of urban and rural planning in accordance with the law, and belong to densely populated places, shall provide supporting documents approved by the competent departments of urban and rural planning;
7) Construction permit documents (construction permits);
8) the examination documents issued by the construction drawing review agency; (Construction drawing design document review report) 9) other materials stipulated by laws and administrative regulations.
-
1. Application form for fire protection design review of construction projects;
2. The industrial and commercial business license and other legal identification documents of the construction unit (industrial and commercial business license, organization ** certificate, etc.);
3. Construction project planning permission documents for new construction and expansion projects (construction project planning permits, construction project positioning drawings, etc., interior decoration and use change projects do not need to be provided);
4. Qualification documents of the design unit (industrial and commercial business license, organization certificate, qualification, contract signed with the construction unit, etc.);
5. Fire protection design documents (should meet the requirements of the Ministry of Public Security "fire protection design documents for construction projects", each drawing should be stamped with a special seal for drawings, and the design CD should be provided. When folding the drawing, please use the folding method that is not bound into a book; The folded drawing format should be A4 size (210mm 297mm); When folded, the title block of the drawing should be exposed. )
6 Other relevant materials.
Power of attorney and power of attorney of the construction unit (personnel of the design and construction unit and personnel of other units shall not be entrusted);
Approval documents for construction projects;
Technical solutions and descriptions of special fire protection design, or Chinese versions of international standards and overseas fire protection technical standards adopted in the design, as well as other technical materials such as application examples and product descriptions related to fire protection design (in any of the following circumstances, it shall be provided: there are no provisions in the national fire protection technical standards for engineering construction;
The new technologies, new processes and new materials to be adopted in the fire protection design documents may affect the fire safety of construction projects and do not meet the provisions of national standards; to adopt international standards or overseas fire protection technical standards);
Interior decoration, fire protection change project of the building where the fire protection design review, fire protection acceptance, record spot check, copy of fire protection legal documents and legal proof of property rights, lease contract;
After the construction and engineering supervision unit is determined, it shall provide its industrial and commercial business license, organization certificate, qualification, and contract signed with the construction unit.
All photocopies should be stamped.
-
Application materials: 1) construction project fire protection design review declaration form;
2) The construction unit's industrial and commercial business license and other legal identification documents;
C) new construction, expansion project planning permission documents;
4) Qualification documents of the design unit;
5) Fire protection design documents (see attachment for requirements).
Expert review: In any of the following circumstances, the construction unit shall also provide technical plans and descriptions for special fire protection design, or Chinese versions of international standards and overseas fire protection technical standards adopted in the design, as well as other technical materials such as application examples and product descriptions related to fire protection design
1) There are no provisions in the national technical standards for fire protection in engineering construction;
2) The new technology, new process and new material to be used in the fire protection design document may affect the fire safety of the construction project and do not meet the provisions of the national standards;
3) It is proposed to adopt international standards or overseas fire protection technical standards.
Review period: A written review opinion shall be issued within 20 days from the date of acceptance.
However, if it is necessary to organize an expert review in accordance with the law, the expert review time shall not be counted in the review time.
-
Regulations on the management of the design review and acceptance of the fire ridge bridge of the construction project: the competent department of housing and urban-rural development is responsible for guiding and supervising the fire protection design review of the construction project, and the construction unit shall be primarily responsible for the fire protection design and construction quality of the construction project in accordance with the law, and the competent department for the review and acceptance of the fire protection design shall use Internet technology and other information means to carry out fire protection design review, fire protection acceptance, filing and spot checks.
Article 3 of the Interim Provisions on the Administration of Fire Protection Design Review and Acceptance of Construction Projects shall be responsible for guiding and supervising the review and acceptance of fire protection design of construction projects nationwide. The competent department of housing and urban-rural construction of the local people's ** at or above the county level (hereinafter referred to as the competent department for fire protection design review and acceptance) shall undertake the fire protection design review, fire protection acceptance, filing and random inspection of construction projects within the administrative area of the wild mu in accordance with their duties. The fire protection design review, fire protection acceptance, filing and random inspection of cross-administrative regional construction projects shall be designated and responsible for the fire protection design review and acceptance department of the administrative region where the construction project is located.
-
The filing is not taken for review first, but only registered, and if it is spot-checked, it will be reviewed. The fire protection design review is to take the drawings directly to the fire brigade for review after the design is completed.
-
The record is the completion of the construction of the project, and the fire protection record is reserved for spot checks! The audit is to hand over the construction drawings and plans to the fire department to find the problem and point out the corrections before the construction of the project! Construction can only be carried out after passing the audit....Without review, there is no record.
1.Review the "Technical Practice" subject in conjunction with the syllabus, read through the textbook, and familiarize yourself with the content of each chapter. After completing the chapter content learning, you can combine the online school courses and the free ** question bank to practice the chapter exercises and consolidate your memory. >>>More
1. There are three subjects in the fire engineer examination, namely "Fire Safety Technical Practice", "Fire Safety Technology Comprehensive Ability" and "Fire Safety Case Analysis", of which "Fire Safety Technical Practice" and "Fire Safety Technology Comprehensive Ability" are objective questions, and "Fire Safety Case Analysis" is a subjective question. >>>More
It is agreed that the subcontracting project of the general contractor shall be approved by the construction unit. The general contractor, Company A, subcontracts part of the non-main project to Subcontractor B with corresponding qualifications, and has obtained the consent of the construction unit. According to the Building Act. >>>More
It is recommended to continue your studies and get a college diploma. In this way, many boundaries can be broken through, and there will be more room for development. >>>More
1. After the completion of the unit (sub-unit) project, the contractor shall organize the relevant personnel to self-inspect according to the quality standards and design drawings, and evaluate the test results, and fill in the "Project Completion Inspection Form" after meeting the requirements and attach the project acceptance report and complete quality data to the project supervision agency to apply for completion pre-acceptance. >>>More