Because of the equal cloth spacing!
a, b, c divided by their common divisor and added to get the construction section.
It can be understood as - A, B1, B2, B3, C1, C2 six equal steps and other rhythm flow construction.
-
In order to make the construction section reasonably divided, the following principles should generally be followed:
The amount of labor of the same professional team in each construction section should be roughly equal, and the difference should not exceed 10 15;
There should be enough working face in each construction section to ensure the production efficiency of the corresponding number of workers and leading construction machinery, and meet the requirements of reasonable labor organization;
The boundary of the construction section should be consistent with the structural boundary (such as settlement joints, expansion joints, etc.) as much as possible, or be located in the part that has little impact on the integrity of the building structure to ensure the integrity of the building structure;
The main conditions for organizing flow construction are as follows:
1) Divide the construction section (conceptual division).
2) Divide the construction process, and organize independent construction teams for each construction process.
3) Arrange the continuous and balanced construction of the construction team of the main construction process.
4) Organize parallel lap construction as much as possible in different construction processes.
-
It's the progress of the main project division, right?
-
Legal analysis: The division of the construction flow section is based on the structural characteristics, plane size and engineering quantity, and the basement structure and the above-ground structure are divided into flow sections. During the construction of the structure, according to the structural design form and engineering quantity, as well as the position of the post-band disturbing pouring belt, etc., the corresponding flow section is divided into the same flow rhythm and balanced flow.
See the division diagram of the flow section of the underground structure and the above-ground structure.
Legal basis: Article 795 of the Civil Code of the People's Republic of China The content of the construction contract generally includes the scope of the project, the construction period, the commencement and completion time of the intermediate delivery project, the quality of the project, the cost of the project, the delivery time of technical data, the responsibility of materials and equipment, the appropriation and settlement, the acceptance of the completion of the project, the scope of the quality warranty and the quality assurance period, and mutual cooperation.
-
According to the structural characteristics, plane size and engineering quantity, the basement structure and the above-ground structure are divided into flow sections. During the construction of the structure, according to the structural design form and engineering quantity, as well as the position of the post-pouring belt, the corresponding flow section of the dry limb source is divided to obtain the same flow rhythm and balance the flow flow. See the division diagram of the flow section of the underground structure and the above-ground structure.
In order to make the construction section reasonably divided, the following principles should generally be followed:
The amount of labor of the same professional team in each construction section should be roughly equal, and the difference should not exceed 10 15;
There should be enough working face in each construction section to ensure the production efficiency of the corresponding number of workers and leading construction machinery, and meet the requirements of reasonable labor organization;
The boundary of the stateless construction section should be consistent with the structural boundary (such as settlement joints, expansion joints, etc.) as much as possible, or be located in the part that has little impact on the integrity of the building structure to ensure the integrity of the building structure;
The number of construction sections should meet the requirements of reasonable organization of flow construction. If the number of construction sections is too large, the construction speed will be reduced and the construction period will be extended; The construction section is too small, which is not conducive to making full use of the working face, and may cause nest work;
For multi-storey buildings, structures or projects that need to be constructed in layers, they should be divided into both construction sections and construction layers.
Legal basis: Article 795 of the Civil Code of the People's Republic of China The content of the construction contract generally includes the scope of the project, the construction period, the commencement and completion time of the intermediate delivery project, the quality of the project, the project cost, the delivery time of technical data, the responsibility of materials and equipment, the appropriation and settlement, the completion acceptance, the scope and duration of the quality warranty, and mutual cooperation.
-
According to the structural characteristics, plane size and engineering quantity, the construction flow section is divided into the basement structure and the ground or state structure. During the construction of the structure, according to the structural design form and engineering quantity, as well as the position of the post-pouring belt, the corresponding flow section is divided to obtain the same flow rhythm of the Zen group beam and balance the flow of water. See the division diagram of the underground structure and the above-ground structure flow section of Heyun.
-
Answer]: C determines that the flow step k is the greatest common divisor of each flow beat, that is, k = 3 days. By the formula b1=6 3 =2, b2=6 3 =2, b3=3 3=1.
Determine the number of professional work teams participating in Shanpei's participation in the flow of water as a tease of sensitivity: n=2+2+1=5 (teams).
Determine the number of construction sections, take: m = 5 sections.
-
Liang Shenru answer]: c
When organizing the construction of multi-storey buildings, the number of construction sections should be greater than or equal to the number of construction processes, and when the number of construction processes is greater than the number of construction sections, it will lead to the suspension of labor or machinery.
-
The construction section and the working face of the flow construction belong to (d
a.Technical parameters.
b.Process parameters.
c.Time parameters.
d.Spatial parameters
I'm relying on this one that's too unspecific.
Should you start with **?
Otherwise, there is only a dead end. >>>More
Before the bracket is erected, check the bowl buckle rod in advance, and shall not use digging, bending, corrosion, etc., as well as components with damage and obvious defects, and the bowl buckle or pin must use a special pin. Bowl fasteners must be inspected one by one before entering the site to see if they meet the quality requirements and design requirements. >>>More
Typical example questions.
Brainless answers. Here's how to answer it. >>>More
The constructor is the technical organization and management personnel at the grassroots level. The main work content is to go deep into the construction site under the leadership of the project manager. >>>More