How to view the results of the Correct Seepage Calculation 25

Updated on technology 2024-02-28
2 answers
  1. Anonymous users2024-02-06

    How to view the results of the Correct Seepage calculation:

    Calculation item: Leling.

    Analysis Type: Steady Stream.

    Slope information] The water level on the left side is high:

    The water level on the right side is high:

    The water level on the left side is 2:

    The water level on the right side is 2:

    The number of grade segments is 9

    Slope Line Number Horizontal projection (m) Vertical projection (m).

    Soil Layer Information] Number of Grade Nodes = 12

    Number x(m) y(m).

    Number of additional nodes = 19

    Number x(m) y(m).

    Number of different soil zones = 5

    Area Code Soil Type KX ky Alfa Node Number M D) (M D) (degrees).

    1 Fine sand (11,10,9,8,18,19,)2 Fine sand (1,11,19,18,8,4,3,2,)3 Fine sand (0,1,2,3,4,5,6,7,-5,-4,-3,-2,-1,-10,)

    4 Fine sand (7,6,5,17,16,-9,-8,-7,-6,-5,)

    5 Fine sand (0,12,13,14,15,-9,16,17,5,4,8,9,10,11,1,)

    Polygon boundary data].

    Number of polygon boundaries = 10

    No. 1, Boundary Type: Known Head.

    Node number: -10 --0

    Nodal head height (m).

    No. 2, Boundary Type: Known Head.

    Node number: 12 --0

    Nodal head height (m).

    No. 3, Boundary Type: Possible Leaching Point.

    Node number: -2 --3

    No. 4, Boundary Type: Possible Leaching Point.

    Node number: -3 --4

    No. 5, Boundary Type: Possible leaching point.

    Node number: -4 --5

    No. 6, Boundary Type: Possible leaching point.

    Node number: -5 --6

    No. 7, Boundary Type: Possible leaching point.

    Node number: -6 --7

    No. 8, Boundary Type: Possible leaching point.

    Node number: -7 --8

    No. 9, Boundary Type: Possible leaching point.

    Node number: -8 --9

    No. 10, Boundary Type: Possible Leaching Point.

    Node number: -9 --15 [point boundary data].

    Number of Point Boundaries = 1

    No. 1, Boundary Type: Known Head.

    Node Number Description: -5

    Node head height.

    Calculation parameter] Split Length =

    Convergence judgment error (relative change in two calculations) =

    Maximum number of iterations = 30

    Output] Calculate Flow:

    Number of points of the flow calculation section = 2

    Number x(m) y(m).

    Draw an analysis curve:

    Coordinates of the start point of the cross-section of the analysis curve: (Coordinates of the end point of the cross-section of the analysis curve: (Calculation result:

    Seepage = m3 days.

    Infiltration line. x(m) y(m)

  2. Anonymous users2024-02-05

    I also want to know, why is the permeability ratio calculated for different water levels the same? Very depressed.

Related questions
8 answers2024-02-28

1. First log in to the mobile phone number and the local mobile company's online business hall; >>>More

3 answers2024-02-28

Highlight the ways of moral education penetration in subject teaching: change concepts and raise awareness; change the evaluation model to stimulate the enthusiasm for moral education; Combined with the characteristics of the discipline, the content of the textbook is linked; Think big, start small; Perseverance and unremitting efforts; Focus on incentives and praise appropriately. >>>More

12 answers2024-02-28

Server Event Viewer log file:

microsoft-windows-forwarding/operational >>>More

3 answers2024-02-28

Summary. 1 5 The file that needs to be opened can be opened by pressing the up, down, left, right and enter keys. 2 5 Use the Alt+Tab key to switch the open file view until the view needs to be closed. >>>More

6 answers2024-02-28

The moon order refers to the lunar month of birth, to be precise, it is called the moon order between the two solar terms, for example, the person born from the shock to the Qingming period is the person born in the month, and the month is the same as the other. >>>More