Home improvement, which one to start doing? Where do you start to decorate your house?

Updated on home 2024-02-09
10 answers
  1. Anonymous users2024-02-05

    I don't know if the home decoration you said has done a good job in design, home decoration can be divided into 20 steps, 1. Preliminary design; 2. Theme demolition and modification; 3. Hydropower transformation; 4. Carpentry; 5. tiling; 6. Brush wall paint; 7. a kitchen and bathroom ceiling; 8. Cabinet installation; 9. Wooden door installation; 10. Floor installation; 11. paving wallpaper; 12. radiator installation; 13. Switch and socket installation; 14. Lamp installation; 15. Hardware sanitary ware installation; 16. a curtain rod is installed; 17. Pioneer cleaning; 18. Furniture entry; 19. Household appliance installation; 20. Furniture accessories. Hope it helps.

  2. Anonymous users2024-02-04

    Home decoration starts from deciding the style, and you can decide what style you want to install before you can proceed to the next step.

  3. Anonymous users2024-02-03

    Start with the design drawings, design the drawings first, and then start with hydropower.

  4. Anonymous users2024-02-02

    I squandered a little on the Internet, and I felt that what I said was right".

    First, the decoration should start with shopping around.

    Renovation is a big problem, and all new owners are new to this field, and they are more confused about how to start. The most basic thing should be to look more, ask more, go around the market more, and shop around.

    Second, the functional design of the living room is the most important.

    The most fundamental problem with renovation is that the owner first asks himself: what do I (or our family) really need?

    Third, the selection of the decoration team should be the right one.

    What kind of decoration company to choose, first of all, you must consider your own economic affordability, and choose one that is equivalent to your actual situation and affordability. The easiest, how much money you want to spend.

    Fourth, why decoration overruns cannot be eliminated.

    For example, today I saw that this brick is good, and our house is decorated once, this 40, that 50, and that 50 look a lot better, and it is not much more. So, that's it, piece by piece, and in the end it is much more than that. In addition, for example, the most unspectacular water and electricity transformation, the decoration company said that it happened according to the actual situation, how did it happen?

    Fifth, set the furniture first and then prepare for decoration construction.

    On the basis of determining the location of the furniture, set the water and electricity nodes, that is, determine which places need sockets, which places need faucets, and how much are needed. If the node is determined, the budget for hydropower renovation will be more reliable, avoiding the problem of crazy overspending on hydropower renovation in most decoration cases.

  5. Anonymous users2024-02-01

    You must first have an idea, about what style of furniture is, and then go to your suitable decoration company, design floor plans, renderings, contract construction: start with water and electricity...

  6. Anonymous users2024-01-31

    , design preparation stage.

    The design preparation stage is mainly to accept the entrusted task book, sign the contract, or participate in the bidding according to the requirements of the bidding document; Clarify the design deadline and formulate the design plan schedule, and consider the cooperation and coordination of all relevant types of work;

    Clarify the design tasks and requirements, such as the use nature, functional characteristics, design scale, grade standards, and total cost of the interior design task, and the indoor environmental atmosphere, cultural connotation or artistic style that needs to be created according to the use nature of the task;

    Familiar with design-related specifications and quota standards, collect and analyze necessary materials and information, including on-site investigation and visits to similar examples.

    When signing a contract or formulating bidding documents, it also includes the design schedule, the design rate standard, that is, the percentage of the owner's design fee charged by the interior design to the total investment in interior decoration.

    2. Scheme design stage.

    The scheme design stage is to further collect, analyze and use the data and information related to the design task on the basis of the design preparation stage, conceive the idea, carry out the preliminary scheme design, in-depth design, and analyze and compare the scheme.

    Determine the preliminary design scheme and provide design documents. Documentation of the indoor preliminary plan usually includes:

    1. Floor plan, common scale 1:50, 1:100;

    2. Interior elevation drawing, common ratio 1:20, 1:50;

    3. Flat top view or bottom view, common scale 1:50, 1:100;

    4. an indoor perspective view;

    5. Interior decoration material sample layout;

    6. Description of design intent and cost estimate;

    3. Construction drawing design stage.

    In the construction drawing design stage, it is necessary to supplement the drawings necessary for construction, such as plane layout, interior façade and flat roof, etc., as well as the detailed structural nodes, detailed drawings and equipment pipeline drawings, and prepare construction instructions and cost budgets.

    4. Design and implementation stage.

    The design implementation phase is also the construction phase of the project. Before the construction of the interior project, the designer should explain the design intent and the technical disclosure of the drawings to the construction unit; During the construction of the project, it is necessary to check the construction situation according to the requirements of the drawings, and sometimes it is necessary to propose local modifications or supplements to the drawings according to the actual situation on the site; At the end of construction, the project acceptance will be carried out in conjunction with the quality inspection department and the construction unit.

    In order to achieve the expected results of the design, interior designers must pay close attention to the links of all stages of design, pay full attention to all aspects of design, construction, materials, equipment, etc., and be familiar with and attach importance to the connection with the architectural design and facility design of the original building, and at the same time must coordinate the mutual relationship between the construction unit and the construction unit, and achieve communication and consensus in terms of design intent and conception, in order to achieve ideal design engineering results.

  7. Anonymous users2024-01-30

    Autumn is a good time to decorate the house, lukewarm, think about your hobbies, what kind of like, such as the color like that, what kind of put one, probably have an idea in mind, so that there will be some land in the heart of the decoration company. Haha, hope that helps.

  8. Anonymous users2024-01-29

    Rates**, décor is like a change of clothes! When you have money, what you want is to look good.

  9. Anonymous users2024-01-28

    First make the decoration design plan to finalize, the overall color tone includes the color of the furniture. Pattern planning, overall design. For example, whether there is a place to open the door, whether there is a partition that needs to be opened, etc.

    Then the layout of the home. For example, the washing machine is placed in**, the bed is placed in**, where is the dining table, the range hood, what is the position, **need to add a lamp outlet, add a switch, etc.

    Then according to the above overall planning, the circuit, switch, positioning. Including location, height, quantity.

    The transformation of water pipelines needs to add switches, and the place of the faucet is planned.

    Then there is the laying of waterways and circuits. Note that if the cable of the TV is to be wall-hung, the wire pipe should be left in the wall.

    Floor leveling, bathroom floor, wall, kitchen floor, waterproofing. Paste tiles, pave the ground, reserve the wall hole of the air conditioner, and then you can start the construction of indoor walls, ceilings, and TV walls.

    During this period, according to the size of the holiday and the beginning of the planning and design, you can start to choose wallpaper, furniture, kitchenware, lamps and so on.

    After the interior decoration is completed, according to the order, you can install window sills, electrical outlets, lamps, switches, kitchen utensils, curtains, electrical appliances, flooring, furniture.

    Hope it helps.

  10. Anonymous users2024-01-27

    Construction process of decoration:

    1) Enter, tear down the wall, build the wall.

    2) Toilet and kitchen floor do 24-hour closed water test.

    This task needs to be completed by the developer).

    3) Drill the trunking, hydropower transformation and acceptance.

    4) Embedding line.

    The tank concealed the hydropower renovation project, and the waterproof project began to be done without leakage in the closed water experiment.

    5) Bathroom, kitchen with wall magnets.

    6) Carpentry and ceiling hanging.

    Plaster corner lines. 7) Cover door covers, window covers. Make a wooden cabinet frame.

    8) Synchronous production of all kinds of wooden doors, modeling doors and flat pressing.

    9) Wooden panels are brushed with dustproof paint (clear oil).

    10) Window sill marble countertop leveling.

    11) Wood veneer pasting, line making and fine installation.

    12) Wall base treatment, grinding, leveling.

    13) Household goods, stickers are pasted on the seams of the door.

    protective edges). 14) Wall oil ici at least three times.

    15) Furniture paint entry, nail holes, paint.

    16) Treat the corners, lay floor tiles, solid wood or laminate flooring.

    Waterproof marble strips, baseboards.

    17) Installation and debugging of lamps, sanitary ware, handles, and door locks.

    18) Clean up and sanitize, repair the floor tiles, and withdraw from the site.

    19) Preliminary acceptance within the decoration company.

    20) The three parties make an appointment for formal acceptance and delivery to the owner.

Related questions
13 answers2024-02-09

The absolutely correct answer is: "Skinner".

Female star Ye Yuzhi has had plastic surgery and breast augmentation many times, and there is evidence after surgery. How do you know that in an accident, Yuzhi was electrocuted, which ruined the appearance and skin on her body, and all the plastic surgeons shook their heads and could not heal. Master Lin is the original residence of the island, with strong mana, and is ready to go to the villa on the island to see Yuzhi, and after Yuzhi has undergone the Jinyi soul teaching technique, she has regained her youthful beauty, and she is more radiant than before, and her skin is white and red. >>>More

9 answers2024-02-09

1990 TVB's Assassin Biography Zheng Shaoqiu (played: Jing Ke, Nie Zheng, Yu Rang, Zhuan Zhu.

11 answers2024-02-09

The strange fate of the immortals of Shushan Wonders.

6 answers2024-02-09

Original name]: Knight Rider Season One

Translation]: Thunderbolt Ranger. >>>More

9 answers2024-02-09

Title: Little Hate, Little Witch Proud Sister, Little Witch Fairy. >>>More