1. Preliminary design.
The first step in the sequence of decorating the house is to determine the decoration style of the house, and it is also a project designed in the early stage, so how to determine the decoration style? The first thing that needs to be done is to measure the house project, the house measurement project mainly includes the overall area of home decoration, the decoration area of the house, tile paving, floor decoration area, the measurement of the house is not only the measurement of the area, but the overall planning of the home decoration, according to the size of the area to determine the decoration design is the safest way.
2. Demolition and alteration of the wall.
After measuring the area of the house, the next step is the wall demolition, which is also the second step in the order of decorating the house, the purpose of the wall demolition and renovation is mainly for the decoration design service, about this need designers and decoration companies to work together, after all, some wall design does not conform to the design of the decoration style, so it is transformed. In addition to changing the wall, it is also necessary to shovel the wall skin, remove the heating, replace the plastic steel windows, etc., if the home needs to carry out water and electricity transformation, it is also in this link of construction. After the wall demolition and renovation project, the hydropower renovation project needs to be used because some electrical appliances or electrical appliances that need water do not have water pipes or electrical appliances.
3. Ceiling decoration and carpentry entry.
Ceiling decoration is the third step in the order of decorating the house, the rooms that need to do the ceiling are the living room, kitchen and bathroom, the kitchen and bathroom ceiling style is generally the aluminum gusset integrated ceiling, the ceiling needs to install lamps and lanterns, the ceiling of the bathroom also needs to install a bath bomb and exhaust fan, so don't forget to reserve the wire of the bath bomb and the exhaust fan hole. Carpenters generally enter the site before bricklayers and painters, and specific matters include background wall installation, partition wall installation, wooden door installation, etc.
4. Bricklayers enter the site and paint the walls.
The fourth step in the sequence of decorating the house is the bricklayer decoration project, the specific process is the installation of the door stone, stone window sill and the paving of floor tiles. After installing the marble floor or window sill, the worker will generally prepare glass glue and seal the marble and window cover with glass glue to avoid contamination. The installation of floor drain belongs to the key project of bathroom floor paving, because the floor drain should be installed together with the floor tiles.
After the floor is paved, the order of decorating the house will enter the wall painting project, which includes the treatment of the base layer of the wall, the painting of putty on the wall, and the final treatment of the wall decoration with latex paint.
5. Furniture and sanitary ware entry and post-cleaning acceptance.
After the painting project is over, you need to build furniture and install sanitary ware, the size and specifications of the furniture as much as possible to install the home decoration style to buy, lamps and hardware sanitary ware do not need to choose too expensive brands, do a good job of saving decoration. After doing the above steps, it is time to clean and accept the project in the later stage, and you must carefully check whether there are any mistakes in the home decoration during the inspection.
-
1. Pre-design: Reasonable pre-design makes your new house decoration more time-saving and labor-saving, and also saves money;
2. Demolition and renovation of the main body: The main renovation is to build a basic framework for the house, such as shoveling wall skins, demolishing walls, demolishing heating, building walls, replacing plastic steel windows and other construction projects;
3. Hydropower transformation: After completing the main demolition and renovation project, the next step is to transform the hydropower of the house. It's about the foundation of future life;
4. Carpentry decoration: work such as wrapping risers, making decorative ceilings, and pasting gypsum lines belong to carpentry work;
5. Decoration of bricklayers and oilers: in addition to tiling, bricklayers lay laminate flooring. The bricklayer's work also includes the installation of marble window sills in the home, the installation of range hoods and the installation of floor drains;
6. Decoration and installation: When the above steps are completed, the next step is the installation of commonly used necessary electrical appliances and furniture at home;
7. Later decoration: due to the decoration, there will be many gases harmful to the human body, such as formaldehyde, benzene, etc. You need to ventilate the new house for half a month, and then you can move in with peace of mind.
-
There are three main stages in renovating a house, the design stage, the construction stage, and the installation stage. If you want to save a little trouble, it must be to find brand customization, decoration only needs to customize the brand, avoid the need to go to the shopping mall to choose furniture, measure size, move and install, and workers cut corners and other troubles, and the brand customization of the first budget will be written clearly, the design plan is also mostly customized through the on-site measuring tape, there will be no repeated construction and other costs, can avoid being pitted halfway. Like Opali light luxury customization, it provides one-to-one professional services from consulting, design, material selection to installation and after-sales, saving time, worry and effort in the decoration process, and also provides free warranty services within five years, which is a good choice.
-
In a house type drawing, all walls marked as black in the drawing are load-bearing walls, while walls marked as white are non-load-bearing walls. Such walls can be retrofitted and dismantled without affecting the construction of the building. If you don't have time to work but have enough money, you can opt for all-in"Construction now, pay later"You can grasp the initiative as your first choice, because the decoration company serves any of your customers in good faith, and will definitely bring them maybe more customers later; If you know a little about decoration, you can do half a package, the decoration company generally artificial accessories these will bring, the accessories are generally sand cement, early demolition and construction of walls, do water and electricity waterproofing, indoor ceilings, etc., these include, the main materials can be selected according to their own needs, and now many professionals are responsible for package installation.
<> to design special attention is that it is best to find a professional single paid kind, many examples of free design between large decoration companies are for reference only, because designers must need to make money, you hear the so-called free design, in the later stage may add a style to your decoration, some large decoration companies have to have any project management fees.
In fact, think about it, you are your best stylist, the design here does not refer to the renderings, but the functional design, which space in your home to achieve what function, you know best. Generally, a good renovation team will not talk to you about the decoration style at the beginning, he will listen to your planning and layout, and then optimize it from a professional point of view according to your ideas, and the final decision is still up to you. In short, the best decoration choice is the one that suits you.
It reminds you to learn to make trade-offs and know clearly what to do to make the most of your limited funds, so as to create a warm and comfortable home.
Do a detailed interpretation of the problem, I hope it will help you, if you have any questions, you can leave me a message in the comment area, you can comment with me more, if there is something wrong, you can also interact with me more, if you like the author, you can also follow me, your like is the biggest help to me, thank you.
-
When decorating the house, you should first find a more professional designer to design the style of the house, and you should also fix the position of the socket, install the water meter, and also do a good job of waterproof measures in the bathroom and kitchen at home, and find the location of the range hood, you should measure the cabinets, you should paint the walls and paint, then install the floor, install the chandelier, and finally install hardware and other things.
-
The process of decoration is mainly for the early stage of the style determination, the main body demolition, water and electricity transformation, carpentry, tiling, and then the follow-up cabinet and door installation and wall wallpaper, etc., which will be more conducive to the safety of the decoration process and the subsequent use of the process will not be a problem.
-
It must be designed, water and electricity must be done, and waterproofing must be done. Then you have to do a good job of carpentry, measure the size in advance, and measure it many times when you are tiling.
-
In the early stage of design, measure the size of the wall, carry out the main body demolition and modification, carry out construction, and carry out hydropower transformation.
-
1. Demolition and reconstruction of the main body.
The main demolition and renovation is the first project in the decoration, mainly including wall demolition, wall building, shoveling wall skin, dismantling heating, replacing plastic steel windows and so on. The garbage after demolition and modification should be cleaned out in time to ensure the cleanliness of the room and make it more convenient for future construction.
2. Renovation of waterway circuits.
Before the water and electricity renovation, the cabinet designer should come to the door to make the first measurement, help determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc., and formulate a renovation plan. It is also best to send someone to design the location of the power supply and interface according to the model you choose. The air conditioner and its power supply should be placed on the wall at the head of the bed as much as possible to avoid the situation where the air conditioner is blowing directly at people.
3. Paste wallpaper.
After the wall paint is painted, the oiler will brush the base paint in the place where the wallpaper needs to be pasted, and it can generally dry the next day, and then you can paste the wallpaper.
4. Install the socket panel.
The socket panel can be installed in about half a day, and it should be noted that the socket is best to buy a switch function, especially in the kitchen, such a design can make the rice cooker and microwave oven free from plugging and unplugging the power supply, and it can be controlled with a switch.
5. Install cabinets.
The cabinet is a matching project, and the range hood, stove and sink should be purchased in advance, and it is best to send it on the same day and install it together with the cabinet.
6. Install the finished door.
The finished door should be installed before the floor, mainly because of the complex steps of installing the door, hinges, door locks, door stoppers, door frames, etc., there are many tools used.
7. Install hardware.
It is recommended that before installing the floor, the drying rack, curtain rod, lamps, sanitary ware, bathroom and other fragmented items with a lot of ash scattered during installation are installed, if the procedure is reversed, it is likely to cause wear and tear to the floor.
8. Install the floor.
Before installing the floor, it must be leveled, and the ground must be cleaned, and it must not be cleaned with water. It is better not to cut the floor in the house, but to cut it in the hallway, so that you can clean the hallway at the end.
-
First of all, the floor is laid, then the water and electricity are renovated, then the walls are treated, then the cabinets and wardrobes are installed, then the ceiling is carried out, and finally the furniture can be placed. It is necessary to pay attention to the floor, wall and water and electricity renovation, pay attention to the preliminary installation, but also pay attention to the acceptance of the house, and also pay attention to the sound insulation of the house.
-
Install the kitchen first, then the bedroom last. It is necessary to pay attention to the color must be uniform, do not engage in bells and whistles, and the door is best to choose reddish brown.
-
Be sure to install water circuits as well as cabinets in advance. These two are more important. It should be noted that you must find a regular company. Don't look for a company through an intermediary. Installation of cabinets, underfloor heating,
-
Consult professionals, field visits, sign contracts, material decoration, recovery and delivery, and mid-term acceptance should be accepted during the decoration period to see whether the designer personally observes the scene, and whether the decoration personnel sell dog meat on the head of a sheep.
-
01 The steps of decorating the house are: design drawings, construction preparation, hydropower engineering, masonry engineering, painting, finished product installation, and soft decoration engineering. The house is the harbor where we anchor after a day's journey, it occupies an extremely important place in a family, and it is also the soul of the steps we begin to decorate the house, which directly determines the final shape of the house.
Therefore, a good upfront home design is crucial.
The steps to decorate your house are as follows:
1. Design drawings.
The design drawings of the house are the most important steps in decorating the house, so that you can know what the house is going to be, and you have a certain understanding of the overall layout and style of the house.
2. Construction preparation.
Before preparing for construction and decoration, it is necessary to confirm the relevant progress with the designer and the construction team leader and a series of work, in the process of construction, do not only pay attention to the total number of materials, but pay attention to the details of the materials, so as not to be shoddy, spend a lot of materials that are not good.
3. Hydropower engineering.
Hydropower engineering can be said to be the first step of house decoration, to carry out water, electricity, coal, exhaust pipes and other embedded work, water pipes and wires are best to choose better quality products, so as not to increase the cost of maintenance in the later stage.
4. Masonry engineering.
This step is mainly to rebuild the wall, carry out tile paving and other work, check the flatness of each wall and do waterproof testing on the bathroom and balcony, and the exterior wall of the house should be treated with multiple waterproofing treatments to avoid water seepage on the exterior wall, resulting in moldy wallpaper.
5. Carpentry engineering.
This step is mainly for the production of the ceiling of the house, various wardrobes and lockers, the material of the board must be environmentally friendly, and the size must be determined in advance when making the furniture of the wardrobe.
6. Paint. Paint is mainly putty whitewashing, latex paint, furniture painting, etc., when painting paint, pay attention to maintaining indoor humidity, so as not to cause pittings or small particles on the surface of the wall, the position to ensure the firmness of the wall, you can add a wall base film in the putty, which can prevent the wall from falling powder.
7. Finished product installation.
The main thing is to install wooden doors, floors, baseboards, sockets, etc., when installing switch sockets, do not install panels first, so as not to scratch the switch panel during wallpaper construction.
8. Soft decoration engineering.
This is the last step in the decoration of the house, let the sofa, bed and other furniture enter, these soft decoration must match the wall, floor, etc., the overall look will be beautiful and coordinated.
Buy your own materials, see other people's good early workers work, this will save money, I used to open a decoration company, that is, I am tired, there is time to work at the top of this point to see that the work is not good to the workers in advance, to wait for the work is done in the workers to say, he must not be willing to change for you.
1. Deal with the base layer of the wall.
The base treatment of the wall is very important in the painting step, sloppy, you must know that the base treatment of the wall is not done, it will affect the subsequent process, so we must level the base before painting, in addition, because most of the rough houses are not flat, so it is necessary to carry out the leveling and cleaning process, when painting the wall, the old paint should be removed, if it is an old house of more than five years, the putty must be removed. >>>More
When the house is decorated, it will definitely decorate the circuit, when it comes to the circuit, then you need to use wires, usually go to the building materials market, you will find that the boss usually asks you whether you want a soft wire or a hard wire, at this time if you don't understand, it is likely to pick the wrong one. Is it better to use soft or hard wires for house decoration wires? When I asked the old electrician, I regretted that my family didn't pick the right one. >>>More
1. Installation and placement of various electrical equipment. >>>More
How to decorate the bathroom, many people may not have carefully considered, think that the bathroom is a shower, toilet and washing, as long as the toilet, shower and washstand are installed, in fact, the bathroom decoration process is not understood, the later troubles are a lot, the following 8 major bathroom decoration process, do it, you can also install the perfect bathroom. Step 1, hydropower transformation, hydropower positioning, oblique tee, water trap, water supply pipe pressure test, drainage test water can not be missing, choose the wall row or the ground row, in this step also to plan Step 2, sewer sound insulation, sewer pipe sound insulation If you don't do a good job, as soon as you release water upstairs, your home will make a noise Step 3, the bottom layer is waterproof, and the bottom layer is slope waterproof to avoid hiding water at the bottom in the future. Step 4, the wall is waterproof, the base layer should be waterproof to be 40 cm, and the surface layer waterproof should be 2 meters 4 high. >>>More