Project approval documents refer to various scientific research, engineering, construction, investment and other projects in order to obtain the approval of relevant departments, before the implementation of the project involved in a variety of materials composed of text, drawings, **, **, electronic data.
Including research report, project proposal, project report, project plan, project initial expansion design, feasibility study report, technical and economic analysis report, etc. Different projects, different approval departments, and different approval procedures require different project documents.
Engineering construction. Engineering construction provides an important material and technical foundation for the development of the national economy and the improvement of the people's livelihood, and plays a role in promoting the revitalization of a variety of industries, therefore, it occupies a very important position in the national economy, and the state also attaches great importance to the use of legal means to strengthen the management of engineering construction through the formulation and implementation of engineering construction management regulations.
The assembly of various mechanical equipment that needs to be installed in production, power, lifting, transportation, transmission, medical treatment, experiment, etc., the installation works such as workbenches, ladders, and railings connected to the equipment, as well as the pipeline laying works attached to the installed equipment and the insulation, anti-corrosion, heat preservation, and painting of the installed equipment.
In order to determine the quality of the installation project, the commissioning work is carried out for the stand-alone test operation of a single equipment and the system linkage no-load test run of the system equipment.
-
Approval and application report of construction project.
Approval documents for land use for construction projects.
Notice of opinion on site selection of construction projects and planning and design (land use) conditions: state-owned land use right transfer (lease) contract, land use red line map and state-owned land use right transaction confirmation or Wuhan state-owned land allocation decision, construction land planning permit and land use red line map.
Red Line Locator Book of Construction Land.
State-owned land use right certificate (copy).
Construction project planning approval documents.
Construction project planning permit and construction red line map.
Construction project red line locator book.
Planning acceptance certificate and as-built drawings.
-
Summary. Hello dear, this is me for you.
Hello dear, this is me for you.
Dear, this is the information I found for you. Hope it helps.
-
Dear, hello for you to inquire: the project preparation stage documents involved in the relevant aspects of the rubber: project documents refer to a variety of scientific research, engineering, construction, investment and other projects in order to obtain the approval of the relevant departments, before the implementation of the project involved by a variety of text, drawings, such as car, electronic data composed of materials.
Including research reports, project proposals, project reports, project plans, project initial expansion design documents, feasibility study reports, technical and economic analysis reports, etc. I wish you a happy life If you think mine is helpful to you, please give a thumbs up <>
-
1. The entire project team includes the project manager 2, the project management organization within the organization, including the project sponsor (project business leader) and the project management office (PMO) 3, other project business support functional departments within the organization 4, all the best business providers downstream of the project team 5, the project team upstream of the project contract customer and the ultimate owner (if any) 6, the functional supervision department or institution 7, the professional association to which the project business belongs8, and the third party of the project cooperation 9, Others (such as project account opening, letter of guarantee, bank, import and export of goods, customs, etc.).
-
The entire project team includes the project manager, the project management organization within the organization, other project business support functions within the organization, all the leading businesses downstream of the project team, the upstream project contract customers of the project team and the final owner (if any), the first functional supervision department or institution, the professional association to which the project business belongs, the third party of the project cooperation, and others (such as project account opening, letter of guarantee bank, import and export customs of goods, etc.).
Before the start of the project, it is necessary to erect the top, approve, requisition, survey, design, bidding, etc., so the relevant parties involved are these.
The project preparation stage document is a document formed in the project preparation stage, before the start of the project, in the project preparation stage such as topping, approval, land acquisition, rock survey, design, bidding and other documents formed.
-
1. Project approval documents.
1. Project proposal.
2. Approval opinions of project proposal and preliminary work notice.
3. Feasibility study report and annexes.
4. Approval opinions of the feasibility study report.
5. Meeting minutes and leaders' speeches related to the establishment of the project.
6. Expert advice documents.
7. Survey data and project evaluation research materials.
2. Construction land, land requisition, and demolition documents.
1. Site selection application and site selection planning opinion notice.
2. Land use application report and approval letter of urban and rural construction land of the people at or above the county level 3, demolition and resettlement opinions, agreements, plans, etc.
4. Construction land planning permit and its annexes.
5. Documents for the allocation of construction land.
6. State-owned land use certificate.
3. Survey, mapping and design documents.
1. Engineering geological survey report.
2. Hydrogeological survey report, natural conditions, and survey.
3. Notice (book) of construction land nailing
4. Report on the results of topographic survey and land allocation.
5. The declared planning and design conditions and the notice of planning and design conditions 6, preliminary design drawings and descriptions.
7. Technical design drawings and descriptions.
8. Approve the notice of design plan and review opinions.
9. Relevant administrative departments (civil air defense, environmental protection, fire protection, transportation, gardening, municipal, cultural relics, communications, confidentiality, rivers and lakes, education, termite control, health, etc.) approve documents or obtain relevant agreements.
10. Construction drawings and their descriptions.
11. Design calculations.
12. ** Opinions on the approval of construction drawing design documents by relevant departments.
Fourth, the bidding documents.
1. Survey and design bidding documents.
2. Survey and design contract.
3. Construction bidding documents.
4. Construction contract.
5. Project supervision bidding documents.
6. Supervision entrustment contract.
5. Approval documents for the commencement of construction.
1. The application documents for the construction project to be included in the annual plan.
2. The approval document of the construction project included in the annual plan or the annual plan project table 3, the planning approval declaration form and the documents and drawings submitted.
4. Construction project planning permit and its annexes.
5. Construction project commencement review form.
6. Construction permit for construction projects.
7. Investment license, audit certificate, payment of greening construction fee and other certificates 8. Project quality supervision procedures.
6. Financial documents.
1. Materials for estimating project investment.
2. Engineering design budget estimation materials.
3. Construction drawing budget materials.
4. Construction budget.
7. Construction, construction, supervision institutions and responsible persons.
1. List of project management institutions (project management department) and persons in charge 2, list of project supervision institutions (project supervision department) and persons in charge 3, list of project construction management institutions (construction project management department) and persons in charge.
-
There are also some compilations of records, especially those in the system, that should be consistent with specific projects.
-
1. Construction organization design;
2. Collection and sorting of project procedures;
4. Sorting out various systems;
5. Collation of safety data;
6. System data;
7. Collect and sort out the documents of all participating units and personnel;
8. Miscellaneous.
Glossary books, long and difficult sentences, test question sets. >>>More
Apply now.
It is possible to enter the university next September. >>>More
2.The era of the technological revolution was from 1870 to 1945 >>>More
3. The overall design budget estimate is high or low, which not only affects the control of the project cost, but also affects the authenticity of the investment plan and the reasonable allocation of investment funds. It is important to review the design budget estimates and do a good job in the review of the design budget estimates. >>>More
Second, the application materials: academic qualifications, ID card, **, professional title English certificate, professional title computer certificate, continuing education certificate, ** (intermediate titles generally need to be published in provincial journals more than 2-3 articles, specific publication grades, and author rankings need to ask the local personnel bureau regulations), assistant certificate, declaration form (on the official website of the Personnel Bureau, print, fill in, seal).