How to install aluminum plate ceiling, how to install aluminum veneer ceiling

Updated on home 2024-03-01
6 answers
  1. Anonymous users2024-02-06

    Foshan Meililong said that the installation of aluminum gusset ceilings mainly relies on keels and tie rods to carefully fix and control, so in some aspects must not be ignored! Do these five points, install the aluminum gusset ceiling without worry!

    1. Install aluminum trimmed corners at the same height.

    2. Lift the boom and the light steel keel at appropriate intervals, with the boom spacing below the meter and the light steel keel at the interval.

    3. The vertical direction of the pre-installed boom on the triangular keel and the light steel keel is connected by the plate spacing, and the aluminum ceiling manufacturer said that the horizontal adjustment is very important as the last step. It is related to the smoothness of the overall ceiling.

    4. The two sides of the square plate are pressed into the triangular keel joint in parallel, first install the transverse sides to find the right side, and then straighten them line by row. (Note that the side of the square plate has a small hole in the direction of inserting into the triangular keel).

    5. Gloves must be worn when gusshing the plate. If you accidentally leave dirt on the board, wash it with clean water. Do not tear off the protective film when installing.

  2. Anonymous users2024-02-05

    1. Use of materials and tools.

    The size is 30*30cm square aluminum alloy ceiling.

    Ceiling keel materials, including baseline light steel, ceiling.

    Hanging wires for fixing keels, including height-adjustable steel bars, hooks, and screws.

    A cutting machine for cutting keel material.

    Second, lay the keel.

    Install the footing. Because the keel is installed according to the standard of the baseline, the height of the baseline must be measured before deciding.

    Measure the length of the footline according to the dimensions of the room.

    After installation, the footing must be flat and close to the edge of the tile.

    After installation, in order to ensure the smoothness of the foot line, you have to use a level to measure it again.

    Install the hanging wire. According to the actual size of the room, measure and determine the appropriate installation location.

    Use an electric drill to drill a hole and then drive the hanging wire into the hole. The depth of the hole is about 3cm to ensure the firmness of the hanging wire.

    What it looks like to install the hanging wire. The flatness of the hook at each lower end of the hanging wire can be ensured by adjusting the screws.

    Since the hanging wire bears the weight of the entire ceiling, you can experience its firmness with your own hands.

    Install light steel. Use a chainsaw to cut out light steel material that fits the length of the room.

    Fix the light steel on the hanging line. A light steel must be fixed with hanging wires at both ends to ensure firmness.

    After the light steel is installed, the two ends of the light steel should also be flat.

    There is a distance between the light steel and the footing after installation, which is left for the keel installed below.

    Laying the keel. Wear the keel between the footline and the light steel, and fix both ends on the footline.

    The junction of the keel and the light steel must be fixed with a special metal joint to ensure that it does not loosen.

    When installing, always pay attention to the spacing between the keels and make adjustments. The spacing is just 30cm in width of the ceiling.

    It can be seen that the keel spacing after installation and adjustment is very even.

    3. Install the ceiling.

    Install the ceiling. The edge of the aluminum alloy ceiling is sandwiched into the gap of the keel.

    Forcefully lift the ceiling upwards so that the edge of the ceiling is completely fixed in the crack.

    Refer to the position of the adjacent ceiling, adjust the position of the ceiling in time to achieve neatness.

    The edges of the two adjacent ceilings are completely submerged in the keel gap, so as to ensure that the ceiling is firm and not loose.

    Installation of corner edge ceilings.

    The dimensions of the ceiling edges are not the same as the size of the ceiling and must be cut before installation.

    Due to the wall blocking, it is inconvenient to fix the ceiling interface, and the workers have to fix the ceiling from many aspects.

    Break off the metal buckle on the foot line against the edge of the ceiling, so as to ensure that the edge of the ceiling does not arch and seam.

    After the construction of the above process, the ceiling is installed. It can be seen that the gap between the ceilings is horizontal and vertical, and there is no arching phenomenon at the edge.

    Hope the above can help you

  3. Anonymous users2024-02-04

    Preparation for the installation of aluminum veneer ceilings

    Check the construction drawings and on-site measured dimensions in detail to ensure the perfection of the deepening design and processing, and carefully check with the structural node diagram to find the inconsistent parts and correct the design as soon as possible. Check whether the quality of the horizontal and vertical keel meets the requirements of the drawing. The horizontal and vertical keel installation meets the requirements of the design specification.

    The connecting bolts installed with horizontal and vertical keels should not be missed.

    In order to ensure the installation accuracy of the plate, it is advisable to use theodolite to penetrate the beam mullion members, and the deformation joints, settlement joints, variable cross-sections, etc. should be properly handled to meet the requirements of use. The material and processing geometry of the metal connector must meet the design requirements, and the material must have a factory certificate and a retest report. The connection between the connector and the vertical keel should be reliable, and the elastic pad should not be missed.

    Aluminum plate installation steps

    Use detergent to clean the side of the aluminum plate against the interior surface and the surface of the column frame. The whole aluminum plate is connected with the keel through the surrounding aluminum corner code (hanging ear) and fixed on the keel. Fixing method, if it is a seamless splicing inside, it can be turned with an electric drill at the corresponding position on the keel, and then riveted with a flat head (countersunk head) aluminum rivet; If it is a plate with glue seams on the outside, you can use steel tail screws (also known as flange screws or phoenix tail nails, see figure) to drill directly into the keel through the connecting holes of the aluminum corner code to fix the aluminum plate, but pay attention to control the tightness of the drill bit to adjust the aluminum plate.

    The aluminum plate enters the site for trial assembly, first fix the aluminum plate slightly on the keel, pay attention to the installation accuracy control, and then tighten the plate after adjusting it. When installing the aluminum plate, it should be installed on the wall according to the number of the aluminum plate. The installation of aluminum plates starts from the front, large area, and corner parts, and is installed from top to bottom.

    The connection between the aluminum plate and the keel should meet the requirements of the drawing, be firm and reliable, and bolts should not be installed. The corners of the curtain wall and the surrounding walls, the connection structure of the upper and lower seals, and the treatment of deformation joints should meet the design requirements.

  4. Anonymous users2024-02-03

    There are 2 ways to install aluminum veneer ceilings, and we will introduce them in detail.

    The sleek flat surface of the hook-up board reflects the fashion touch and drives the inspiration of modern design. The stationary ceiling is smooth and stable, and can be loaded and unloaded by hand without the use of any tools, making it easy to draw; And it can be set up with soundproof cotton to create a perfect sound-absorbing function. Strong Spelling:

    The one-way parallel keel hook-up structure makes the keel fold together in an orderly manner, and the unique hook-up design controls the activity between the board and the plate to ensure that the gap is more rigorous and smooth. Strong windproof and easy to maintain: each board is designed and installed with a windproof card code, which is suitable for outdoor decoration; And this structure has a unique access port design for maintenance and maintenance, which not only does not affect the appearance, but also ensures the overall unity and beauty of the ceiling.

    The width of the board is 600mm, the length of the board is 1200mm, and it can be customized according to the customer's size: 600mm*1200mm, thickness:

    Hook-up mounting system.

    The unique Z-shaped keel is then fitted with a 38-bone shackle.

    The hook-up system is stable, easy to install, construct and disassemble, without any special tools, and easy for daily maintenance.

    Hook up the aluminum plate installation node.

    Installation method:1According to the requirements of the design drawings, measure the elevation of the ceiling after the installation of the aluminum veneer, determine the horizontal line of the ceiling, and fix the corners at the horizontal line position around the wall.

    2.Determine the construction direction, drill hoisting holes on the ceiling of the building structure at a distance of 1200mm, and fix the boom with expansion bolts.

    3.Fix the light steel keel hanger and light steel keel, adjust the light steel keel to the level and adjust the elevation of the light steel keel at the same time, and each keel is parallel to each other.

    4.Fix the hook buckle keel on the light steel keel with the bar buckle keel hanger, adjust the level, and the hook buckle keel must be parallel to each other and perpendicular to the light steel keel.

    5.Install the square gusset: press the hook buckle in the same direction and buckle it into the auxiliary keel groove.

    6.The edge should be measured according to the site situation, and the ceiling should be placed on the corner.

    7.During the installation process, hands should be kept clean, and there should be no sweat, oil and other undesirable phenomena.

    Ceiling aluminum veneer.

  5. Anonymous users2024-02-02

    How to install? ** If you pretend, there are a lot of them; Isn't it directly buckled to the keel if you install it?

  6. Anonymous users2024-02-01

    The ceiling has a great impact on the effect of decoration, so many users are more cautious about the choice of the ceiling, there are many kinds of popular ceiling materials, different materials show different ceiling effects, characteristics and performance are not the same, the current more popular solid wood ceiling, gypsum ceiling, and aluminum ceiling. The most common aluminum ceiling is used in the kitchen and bathroom ceiling, the effect of aluminum plate ceiling is better, and the life of use is also very long, the following is the installation method of aluminum plate ceiling.

    Springline

    According to the floor elevation level, use the ruler vertical vector to the ceiling design elevation, bounce on the roof on the keel position line, and bounce the elevation line of the roof on the wall.

    Install the main keel boom

    After the elevation line of the roof and the position line of the main keel are played, the elevation of the lower head of the boom is determined, and the one end of the boom without bolt slag is fixed under the floor slab with an expansion bolt according to the position of the main keel such as the mausoleum and the hanging spacing; 6m steel bar (8mm flat steel) for the boom.

    Install the main keel

    Assemble the boom nut, precipitously code the hanger on the main keel, assemble the main keel of the hanger, make the hanger penetrate the corresponding boom bolt according to the position of the gear line, tighten the nut, connect the main keel, install the connector, adjust the elevation and straightening of the cable, install the hole and attach the main keel, and set up and connect the clamping.

    Install the secondary keel

    According to the bounced secondary keel binning line, the secondary keel triangular hanger is clamped, the wooden keel is used, and the spacing of the secondary keel is 600mm; According to the spacing of the main keel specified in the design, the secondary keel is hung on the main keel through the triangular pendant; When the length of the secondary keel needs to be extended by multiple threads, the secondary keel connector is used to connect and straighten and fix the secondary keel while hanging the secondary keel.

    Install the side aluminum strips

    The specification of the side aluminum strip is: 25mm*25mm, and the elevation of the installation ceiling requires that the aluminum strip on the side of the wall is fixed with cement nails.

    Install the aluminum gusset

    When installing the ceiling aluminum gusset, press lightly along the flanging part, completely card both sides of the square plate into the secondary keel, and then push it tightly, and it is strictly forbidden to barbaric loading and unloading; And straighten the side aluminum strip card while fixing the edge aluminum plate. According to the design requirements, the ceiling of this project adopts 600mm*600mm perforated aluminum gusset.

    Install light fixtures and vents

    According to the ceiling plan, arrange the lamps and vents; At the same time of installing the aluminum gusset, open holes according to the size of the lamps and vents, and install the lamps and vents.

    Compared with other ceiling materials, the construction of aluminum plate ceilings is relatively simple, but the basic construction process is not much different, and it is also installed through the skeleton. Whether the effect of the aluminum plate ceiling is good or not mainly depends on whether the construction process is fine, and every step of the aluminum plate ceiling must be carried out strictly to ensure the flatness of the installation and the firmness of the ceiling. The aluminum plates are connected by clamp strips, so we must pay attention to the treatment of the seams when installing, so as not to cause safety accidents.

    You can get it for free

Related questions
9 answers2024-03-01

Precautions when installing.

1) The fresh air system is generally installed in the form of a suspended ceiling, which will have a certain impact on the floor height, so it should be included in the design and planning before the decoration, and the appropriate fan size should be selected, so that it is convenient for the service provider to design a reasonable installation plan and construction, ensure the quality of the system, and will not destroy the overall decoration pattern in the future. >>>More

13 answers2024-03-01

Many people don't know how to install after buying the ceiling, some even go to the installation master, in fact, we can install it ourselves, the specific installation steps are as follows: 1. Install the drill bit Select the right electric drill Install the drill bit Precautions: The hole in the ceiling is generally 6mm, and the installation is to choose the appropriate electric drill specification 2. Find the hole on the top plate of the suction cup Take the hanging plate off the ceiling tray Align the ceiling plate on the screw 3, drill the hole on the wall Mark the hole 4, the expansion screw Race the expansion screw into the hole and hammer it in 5, fix the hanging plate and completely embed the expansion screw into the wall Fixed the hanging plate 6, fix the ceiling plate and the lamp body Connect the hanging plate and the ceiling plate with screws Tighten the screws and fix the ceiling tray The last step is to install the lampshade.

9 answers2024-03-01

The cleaning of the integrated ceiling should be based on the material of the integrated ceiling >>>More

13 answers2024-03-01

5. Double-click to run in the unzipped file, and then follow the operation step by step to complete the installation. >>>More

16 answers2024-03-01

Before installing the gypsum line, the base treatment should be done, and the parts to be installed should be coated with water with a roller and the original putty powder should be removed with a shovel to ensure that the surface of the repaired wall paste position is flat and there is no protrusion or recess. To determine the baseline of the installation according to the width of the plaster line, use an ink fountain to flick the ink line. In the gypsum line of more than 15cm, glue it with adhesive powder, and then fix it with wooden screws or air nails. >>>More