What are the main procedures required for the preparation for the start of construction projects?

Updated on society 2024-03-07
9 answers
  1. Anonymous users2024-02-06

    1. Project approval, whether the construction project has fulfilled the various approval procedures stipulated by the state, whether the data on which the feasibility plan is based are sufficient and reliable, and whether the relevant calculations are accurate; whether the depth of the argument is in place and whether the content contained in it is complete; whether the intermediary agency engaged in the feasibility study has the necessary qualifications; Whether a multi-scheme comparison and demonstration procedure has been implemented, etc.

    2. Whether the land is used without approval, whether the land use procedures comply with national regulations, and whether the actual use of the land is consistent with the permitted use.

    3. Planning permission, whether it is built without planning, whether the site selection opinion, construction land planning permit, and construction project planning permit are handled in accordance with national regulations, and whether the design drawings and the implementation of the project meet the requirements of urban planning.

    Fourth, whether to carry out environmental impact assessment. Whether there is an environmental report approved by the competent department of the industry.

    Fifth, the economic rationality of the design scheme, after the project makes an investment decision, the key to controlling the project investment lies in the design. The data show that: under normal circumstances, the possibility of influencing the project cost in the decision-making and design stage is 30 -75, and the possibility of affecting the project cost in the construction stage is only 5 -25 or less, the design unit has more problems of emphasizing technology and light economy, only seeking safety insurance, the design unit considers more from the perspective of safety, artificially increases the safety and function coefficient, and does not pay enough attention to the project cost, so the design waste is larger; As long as the construction unit is of the grade of the project, regardless of the cost, the loss and waste caused by the idea are serious.

    The focus of the design plan audit is the depth of the design plan and the economic rationality of the design plan, the depth of the drawing design is not enough, which directly affects the accuracy of the bill of quantities and the bottom of the bid, will mislead the project to win the bid, and will also lead to a large number of design changes and visas in the construction process, and the phenomenon of "construction while designing" occurs. The evaluation of the economic rationality of the design scheme can be carried out by index comparison and analysis, that is, the unilateral cost, unilateral reinforcement amount, unilateral concrete consumption and other indicators of the same kind of building are selected and compared with the audited project indicators, and the phenomenon of "thick beams, fat columns, and deep foundations" is found, which not only brings heavy workload to the audit work but also wastes a lot of working time.

    Sixth, the construction drawing design review, whether the construction drawing audit and review procedures have not been completed without authorization, and whether the construction drawing review conforms to national laws and regulations and mandatory standards and provisions for engineering construction.

    7. Whether the pre-construction audit is handled before the start of construction, and whether the pre-construction audit procedures are in accordance with national regulations.

  2. Anonymous users2024-02-05

    The most important thing is the permit to start construction.

  3. Anonymous users2024-02-04

    Strictly implement the reporting system for the first relatives of the start of construction.

    Before the start of the project, the contents of the preparatory work package are:

    1. Technical preparation. 2. Material preparation. 3. Preparation of labor organization. 4. Construction site.

    Preparation (three links and one level.)

    Temporary installation of electricity and water). 5. Preparation for the construction site and other preparations.

  4. Anonymous users2024-02-03

    What materials do I need to prepare before the construction site starts? The following information needs to be prepared before the start of the construction project:

    1. Construction project planning permit (including attachments);

    2. Construction project commencement review form;

    3. Construction permit for construction projects;

    4. Notice of inspection of the red line of the building issued by the planning department;

    5. Procedures for specific supervision and early inspection in the designated supervision agency;

    6. Design drawings and design documents reviewed and approved by the construction administrative department;

    7. Certificate of record for the review of construction drawings of construction projects;

    8. Drawing review minutes;

    9. Construction contract (copy);

    10. Raw materials such as leveling points and coordinate points;

    11. Engineering geological survey report and hydrogeological data;

    12. Letter of authorization from the representative of the construction unit on the construction site;

    13. The agreement signed between the construction unit and the relevant departments.

    The construction unit needs to make a sedan eggplant:

    1. Construction enterprise qualification certificate, business license and registration number;

  5. Anonymous users2024-02-02

    The following information needs to be prepared before the start of the construction project:

    1. Construction project planning permit (including attachments);

    2. Construction project commencement review form;

    3. Construction permit for construction projects;

    4. Notice of inspection of the red line of the building issued by the planning department;

    5. Specific supervision business procedures handled by the designated supervision agency;

    6. Design drawings and design documents reviewed and approved by the construction administrative department;

    7. Certificate of record for the review of construction drawings of construction projects;

    8. Drawing review minutes;

    9. Construction contract (copy);

    10. Raw materials such as leveling points and coordinate points;

    11. Engineering geological survey report and hydrogeological data;

    12. Letter of authorization from the representative of the construction unit on the construction site;

    13. The agreement signed between the construction unit and the relevant departments.

    The construction unit needs to get it done:

    1. Construction enterprise qualification certificate, business license and registration number;

    2. National enterprise grade certificate and credit rating certificate;

    3. Construction enterprise safety qualification examination and accreditation certificate;

    4. ** certificate of enterprise legal person;

    5. Quality system certification;

    6. Laboratory qualification certificate of the construction unit;

    7. Project pre-bidding document and project bid price schedule;

    8. Qualification certificate and employment certificate of project manager, chief engineer and management personnel. (All of the above materials are photocopies).

    9. Examination form and copy of employment certificate for special types of personnel in construction projects. (Safety officers and electricians must hold dual certificates of construction industry and labor department).

    10. The review record of the level point and coordinate point provided by the construction unit;

    11. Submit for review and approval of construction organization design, and design plan of construction organization;

    12. Construction site quality management inspection records;

    13. Report on the commencement of construction projects.

    The first thing to do is the construction organization design, company qualifications, relevant management personnel certificates, laboratory qualifications, and construction permits, and construction reports.

    Materials to be submitted for the construction project commencement permit:

    1. The application form for construction permit for construction projects has been stamped with all seals (in quadruplicate, only one copy is required for construction projects belonging to the district, but the district construction bureau should sign the opinion of "agreeing to start construction");

    2. A copy of the "Construction Transaction Record Form for Construction Projects" that has been stamped with all seals;

    3. Construction Project Planning Permit;

    4. A copy of the signed "Construction Contract" and "Supervision Contract";

    5. "Safety Production License" of the construction enterprise;

    6. Project Manager Qualification Certificate (including Project Management Manual), Safety Production Assessment Certificate B Certificate, Registered Supervisor Bihail Qin Engineer Certificate and "Construction Project Director Engineer Practice Registration Manual";

    7. Voucher for registration procedures for construction project quality supervision;

    8. Registration Form of Safety Measures in the Early Stage of Construction of Construction Projects issued by the Safety Supervision Station;

    9. Noise permit issued by the environmental protection department;

    10. If it is a project that should be tendered, submit a notice of winning the bid;

    11. If it is a foreign enterprise, it should also submit the filing documents for entering Shanshan handled by the Municipal Construction Bureau;

    12. If it is a project listed in item 9 of the "declaration conditions", the termite prevention and control contract shall also be presented.

  6. Anonymous users2024-02-01

    The procedures that need to be completed before the start of the construction project are as follows:

    1. Construction project planning permit.

    The construction project planning permit is one of the procedures that must be handled before the construction project starts, and it needs to be applied to the local planning department and can only be obtained after approval.

    2. Land use certificate.

    The land use certificate is one of the procedures that must be handled before the start of a construction project, and it is necessary to apply to the local land management department and obtain it after approval.

    3. Construction permit for construction projects;

    The construction permit of the construction project is one of the procedures that must be handled before the start of the construction project, which needs to be applied to the local construction department and can only be obtained after approval.

    4. Environmental impact assessment report.

    The environmental impact assessment report is one of the procedures that must be handled before the start of the construction project, and it is necessary to apply to the local environmental protection department, and it can only be rejected after evaluation.

    5. Safety production license.

    The safety production license is one of the procedures that must be handled before the start of construction projects, and it is necessary to apply to the local safety supervision department and obtain it after approval.

    Attention before the start of the construction project Wu Hong Zheng Xiang:

    1. The planning and layout of the construction site should be reasonable.

    2. Safety education and safety investment should be in place.

    3. The safety production management system should be sound. <>

  7. Anonymous users2024-01-31

    1. The construction unit submits the application report for project approval to the local development and reform department;

    2. The development and reform department issues an approval for the establishment of the project;

    3. The construction unit entrusts a survey unit with corresponding qualifications to carry out the survey of the project;

    4. The construction unit entrusts the design unit with the corresponding qualifications to carry out the preliminary design of the project;

    5. Initial design approval, and then formal design;

    6. Construction drawing review procedures;

    7. The construction unit shall go through the project planning procedures with the local construction administrative unit;

    8. The construction unit shall go through the project supervision procedures with the local construction administrative unit;

    9. The construction unit shall go through the fire review procedures with the local fire management unit;

    10. The construction unit entrusts the bidding agency to carry out the bidding work of the construction unit and determine the construction enterprise;

    11. Handle the filing procedures for safety conditions;

    12. Apply for construction permits;

    13. Entrust engineering experimental testing units;

    14. Start construction.

    Legal basisArticle 7 of the Construction Law of the People's Republic of China.

    Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the state, apply to the people's construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department.

    In accordance with the authority and procedures specified in the construction project approved by the commencement report, no longer receive the Shiqiao Sakura work permit.

  8. Anonymous users2024-01-30

    1.Project approval: The Planning Commission window handles the plan approval.

    2.Engineering planning: land use planning, engineering planning.

    3.Drawing review.

    Information to be submitted:

    1.Construction drawing design documents.

    2.Approved project approval documents or preliminary design approval documents.

    3.The main preliminary design documents.

    4.Report on the results of the engineering survey.

    5.The name of the structural calculation and the calculation software.

    6.A copy of the survey and design contract.

    7.Ready-mixed concrete is planned to be rolled with high usage.

    8.Review of other materials required.

    4.Engineering transactions.

    Engineering construction projects are registered for the record.

    Construction Project Transaction (General Procedures for Tendering).

    Tendering unit bidding qualification review.

    The bidding documents are wide and wide, including the large size of the inspection.

    The bid evaluation organization was established.

    Record the winning bid.

    Transaction advice (i.e. payment).

    5.Supervision of works.

    Contract filing. Quality supervision.

    Submissions:

    1.Notice of winning the bid of the construction supervision unit.

    2.Construction contracts.

    3.Supervision of the contract.

    4.A copy of the qualification certificate of the survey, design and construction supervision unit.

    5.Construction project quality supervision registration form.

    6.Construction drawing design document review report and review approval letter.

    7.Report on the quality responsibility system of the construction, survey, design and testing (test) unit.

    8.Construction and supervision unit quality assurance system report form.

    9.Geological exploration data, construction organization design, construction drawing design documents (returned after use) to pay the quality supervision fee).

    Project safety supervision.

    Submissions:1Safety production license for construction enterprises.

    2. Notice of winning the bid for the project.

    3.Engineering construction contracts.

    4.The use plan and cost plan of the safety protection facilities on the construction site.

    5.Temporary facilities planning scheme for construction sites.

    6.The model and quantity of the lifting machinery to be entered into the site for construction.

    7.Floor plan of the construction site.

    8.Accident insurance procedures for employees of construction enterprises.

    9.The person in charge of the project, the safety management personnel and the special operation personnel are certified to work.

    Construction permit for building works.

    1.Construction Permit Application Form.

    2.The original and copy of the construction certificate of the project.

    3.Original and photocopy of planning permit for construction land.

    4.Original and photocopy of construction project planning permit.

    5.Original and copy of real estate development and operation license (provided by real estate development projects) 6Proof of funding implementation.

    7.Approval letter for the review of the construction ** piece.

    8.Notice of Transaction of Works.

    9.Notice of winning the bid for the construction supervision.

    10.The record certificate of the survey, design and construction supervision contract and the ready-mixed concrete use contract that has been reviewed and recorded.

    11.Construction project quality supervision and safety supervision procedures.

    12. The contract for the transfer of the project completion file.

    13.Bulk cement approval procedures.

    14.Proof of civil air defense construction procedures.

    15.Proof of relevant payment.

    16.Other relevant materials.

  9. Anonymous users2024-01-29

    Earthwork is one of the main types of work in the construction of construction projects, including all earth (stone) excavation, filling, transportation, drainage, precipitation and other contents.

    Earthwork has a large amount of work, complex construction conditions, and is greatly affected by geology, hydrology, meteorology and other conditions. Therefore, before organizing the construction of earthworks, the necessary preparations should be made to ensure the quality of the project.

    1. Technical information that should be available.

    The construction unit shall provide the construction unit with the local measured topographic map (including the survey results), the original underground pipeline or structure completion drawing, earthwork construction drawing, engineering geology, meteorology and other technical data, in order to prepare the construction organization design (or construction plan), and shall provide plane control points and leveling points as the basis for construction survey and project acceptance.

    2. Obstacle clearing.

    All obstacles in the construction area, such as existing buildings or structures, roads, ditches, communications, electrical equipment, above-ground and underground pipelines, graves, trees, etc., should be removed or properly disposed of before construction.

    3. Surface soil layer cleaning.

    In the construction area, the weak soil layer, humus, large pebbles, turf, garbage, etc. that affect the quality of the project should be treated.

    4. Set up drainage facilities.

    Temporary or permanent drainage facilities should be set up in the construction area. In the hillside area, a cut-off ditch is set up at a higher point (5 6m from the upper edge of the slope) to prevent the flow of surface rainwater into the cut-and-fill area.

    5. Measurement, positioning, and pay-off.

    Earthwork construction can only be carried out after the earthwork construction survey and positioning line are carried out according to the building boundary, street control point and leveling point measured and released by the planning department.

    6. Build temporary roads.

    The road for mechanical walking in the construction site should be built before the start of construction, and a suitable working face should be opened up to facilitate the construction.

    7. Understand the hydrogeological conditions of the current base field.

    For construction in mountainous areas, it is necessary to understand the local stratum rock properties, geological structure and hydrology, topography, landform, etc. in advance. If a landslide may occur due to earthwork construction, measures should be taken. In the construction at the foot of the steep slope, the slope surface should be checked in advance, and if there are signs of instability such as dangerous rocks, solitary rocks, collapse bodies, and ancient landslides, they should be properly handled.

    8. Other preparations.

    Do a good job in on-site water supply, power supply, erection of temporary production and living facilities, as well as construction machinery and materials.

Related questions
8 answers2024-03-07

I'm studying civil engineering, I'll be honest with you, don't study, it's a popular major for men to study civil engineering, but women tend to prefer their grades in our school, but it's hard to find a job. Because the construction company does not believe in girls. Because they think that girls are afraid of hardship, and it is not easy to manage (dormitories, toilets have to be rearranged for you), you can only go to some units such as design institutes, but there are very few places. >>>More

8 answers2024-03-07

1. Construction drawings and design change records.

2. The main equipment and materials certificate, the re-inspection report and the equipment schedule 3, and the acceptance record of the concealed project. >>>More

10 answers2024-03-07

Hello, I am also a person engaged in the construction industry, I think there should be no such person as the pay-off person you said, these jobs are technicians, supervisors can be said to be the losers, the quality of the project is the professionals invited by Party A to supervise and know the construction quality and the project of Party B. >>>More

4 answers2024-03-07

What are the characteristics of the classification of construction preparation work according to the scope of preparation work? See below. >>>More

10 answers2024-03-07

1. Deeply understand the purpose and significance of the seminar, find relevant information and documents, and use ** reply, email and other answers to understand the suggestions and opinions of various units and relevant personnel on the seminar. Sort out the common and typical problems, and draft the theme and content of the seminar. >>>More