How many tons of cement and how many tons of sand do you need to use for 1 cubic slurry block stone

Updated on Financial 2024-03-15
7 answers
  1. Anonymous users2024-02-06

    According to the current consumption standards for construction works. The materials used to build a cubic meter of slurry block stone retaining wall are as follows:

    Cement kilograms, medium sand cubes, rubble cubes, water 0.79 cubic meters!

    These contents are determined by combining the local advanced average level when compiling the standard quota, and there is no need to calculate the content yourself!

    According to the "Masonry Mortar Mix Design Regulations" (JGJ98-2000), the following proportions are based on weight.

    M10 cement mortar mix ratio:

    The proportion of the amount of each material of mortar: cement sand = 240 1221 = 1

    Condition: Cement mortar for masonry rubble retaining wall with a strength of m10 and a consistency of 30 50mm. The main parameters of raw materials, cement: grade cement; medium sand with a bulk density of 1221kg m3; Construction Level: Average.

    The amount of cement is 240kg m3, the amount of sand QS=1221kg m3, and the amount of water is 290kg m3.

  2. Anonymous users2024-02-05

    1 cubic slurry block stone retaining wall, with cement mortar, cement and sand are required.

    <> cement:;

    Yellow Sand:.

  3. Anonymous users2024-02-04

    Summary. According to the current consumption standards for construction works. The materials used to build a cubic meter of mortar rubble retaining wall are as follows:

    Cement kilograms, medium sand cubes, rubble cubes, water 0.79 cubic meters! These contents are determined by combining the local advanced average level when compiling the standard quota, and there is no need to calculate the content yourself!

    For example, the cement mortar used for masonry rubble retaining wall has a strength of m10 and a consistency of 30 50mm. The main parameters of the raw material, cement:

    grade cement; Medium sand, with a bulk density of 1221kg&47;m3;Construction Level: Average. The amount of cement is 240kg&47;m3, sand dosage QS=1221kg&47;m3, the water volume is 290kg&47;m3。

    How many kilograms of cement and how much sand do you need to use to build a 1 cubic meter rubble retaining wall.

    According to the current consumption standards for construction works. The materials used to build a cubic meter of slurry rubble retaining wall are as follows: cement kilograms, medium sand cubes, rubble cubes, water 0.

    79 cubic meters! These contents are determined by combining the local advanced average level when compiling the standard quota, and there is no need to calculate the content yourself! Such as:

    Cement mortar for masonry rubble retaining walls with a strength of m10 and a consistency of 30 50mm. The main parameters of raw materials, cement: grade cement; Medium sand, with a bulk density of 1221kg&47;m3;Construction level:

    So so. The amount of cement is 240kg&47;m3, sand dosage QS=1221kg&47;m3, the water volume is 290kg&47;m3。

    If my answer is helpful to you, please give a thumbs up (in the lower left corner), I look forward to your like, your efforts are very important to me, and your support is also the motivation for my progress. If you feel that my answer is still satisfactory, you can click on my avatar for one-on-one consultation. Finally, I wish you good health and a good mood!

  4. Anonymous users2024-02-03

    Summary. Hello, tons of cement, about 5 cubic meters of sand.

    Hello, tons of cement, about 5 cubic meters of sand.

    Hello, the average amount of mortar required for each top brick is (the ash joint is 10mm thick, and the slag front is not counted), (the width of the crack is high, the length of the joint is thick in cubic meters.) The amount of 10,000 pieces of mortar is cubic meters, the amount of water-based cherry mud and sand per cubic meter of masonry mortar is about 1,900 kilograms, the cement ratio of sand is 1:, and the amount of cement used in masonry mortar for 10,000 bricks is kilograms.

    The dosage of 100 sand is kilograms (based on the density of 1400, about 5 square meters).

  5. Anonymous users2024-02-02

    How many tons of cement and how many tons of sand do you need to use for 1 cubic slurry block stone retaining wall? Cement mortar of M10.

    Retaining wall masonry beam block stone a vertical cover with transport square meters needs cement 0.075 tons, sand about 0.25 tons, masonry block retaining wall, masonry wall volume and masonry ratio of about five to one, one cubic meter of retaining wall mortar is about 0.2 cubic meters of vertical rows, the ingredient ratio of sand and cement in the mortar is about three to one, 0.15 cubic meters of sand, 0.25 tons, 0.05 square cement, 0.075 tons.

  6. Anonymous users2024-02-01

    Summary. Kiss, 1 cubic slurry block stone retaining wall, with cement mortar, need to use cement and tons of sand.

    Kiss, 1 cubic slurry block stone retaining wall, with cement mortar, need to use cement and tons of sand.

    Cement: Yellow Sand:.

  7. Anonymous users2024-01-31

    How much cement and sand do you need for a cubic retaining wall?

    Dear, hello, I am glad to answer for you: how much cement, sand and gravel is needed for a cubic retaining wall? A:

    The retaining wall is generally about 33 kilograms of cement and about cubic meters of sand per cubic meter. The cost of the retaining wall per cubic meter is about 200 300 yuan, which varies from region to region. Retaining wall refers to the structure that supports the subgrade fill or hillside soil and prevents the deformation and instability of the fill or soil.

    In the retaining wall cross-section, the part that is in direct contact with the supported soil body is called the wall back; The part opposite the back of the wall and the part that is open is called the wall; The part that is in direct contact with the foundation is called the substrate; The top surface of the wall, opposite to the base, is called the top of the wall; The front end of the base is called the wall toe; The back end of the substrate is called the heel. Thank you for your patience. If you are satisfied with my service, please give a thumbs up, and once again wish you all the best!

    Peace and joy!

Related questions
23 answers2024-03-15

Neutron stars are a very extreme type of celestial body in the universe, and their state of matter is different. What would happen if 1 cubic centimeter of material was excavated from a neutron star and placed on Earth? >>>More

12 answers2024-03-15

Do you have an intake pressure of 2 kg? Roughly for you, the conditions: a trap is installed behind the coil, the air supply pressure is 2 kg, and the steam flow rate is 1 ton per hour. >>>More

17 answers2024-03-15

The area is 1,000 square meters and the ground is 15,000 cubic meters of concrete. The ratio of concrete sand, gravel and cement can be configured according to the amount of cement per cubic meter is 320kg, sand 678kg, gravel 1179kg and water 149kgConfigure concrete for standard C20. >>>More

11 answers2024-03-15

High temperature cold storage (0-5) 4 hp hermetic compressor or 5 hp fully enclosed compressor is acceptable. If it is a medium-temperature cold storage (-15 --18), use a 7-horse fully enclosed compressor or a semi-enclosed 5-horse compressor. Low-temperature cold storage (-20 --35) requires 15 hp semi-hermetic compressor. >>>More

7 answers2024-03-15

The 100 cubic cold storage unit needs about 4KW of power, and the common 6P unit can probably meet the use. However, in the actual situation, the temperature capacity of the cold storage will affect the actual situation, 3hp is generally used for small fruit storage, 5hp is used for small frozen meat storage, and 8-10hp medium-sized freezer is used more. >>>More