As shown in the figure below, the acceptance house should check and pay attention to the quality of the list in this screenshot.
-
The steps to accept the house at the time of handover are as follows:
1. Entrance door.
Check whether the brand specifications of the entrance door are consistent with the annex to the contract, and the agreement for the anti-theft door should meet the national standard for the anti-theft door, check whether the surface of the door leaf has scratches, bruises, rust and other phenomena that seriously affect the appearance, check whether the door leaf is installed vertically, check whether the door frame is full of grout, whether the door frame sealing cover is complete, whether the hinge has obvious rust, whether the door frame is installed vertically (if it is a wooden door, check the appearance and installation quality of the door cover), check whether the door opening and closing is smooth and flexible, whether there is abnormal noise, and whether the closure is tight, Check whether the lock and handle are installed firmly, whether the deadbolt function is normal, check whether the cat's eye, doorbell and other accessories are installed completely, whether the appearance of the function is normal, check whether the handle hits the wall when the door is opened, and whether there is a "door fight".
2. Strong and weak electricity.
Check whether the meter is installed in place, whether the meter specifications meet the requirements, record the starting degree of the meter, check whether the intercom system line is in place, whether the intercom system function is normal, whether the installation is vertical, check whether the lighting is energized, whether the socket is energized, and whether the wiring is correct. Check whether the appearance of the box cover of the distribution box is complete, whether the accessories are complete, whether the installation is vertical, whether the height is reasonable, and whether the number of reserved empty spaces is complete; Check whether there is electricity in the room, check whether the appearance of the box cover of the weak current box is complete, whether the installation is vertical, whether the accessories are complete, whether the weak current line agreed in the contract is in the home, and check whether the security system is consistent with the delivery standard agreed in the annex to the contract.
3. Water supply and drainage.
Check whether the water meter is installed in place, whether there is leakage in the front and rear joints of the water meter, record the reading of the water meter, test whether the water pressure is reasonable, whether the water pressure is too large or too small (the interface suitable for the water pressure gauge is required), test whether the floor drain is smooth, check whether the drainage pipes of the kitchen, bathroom and balcony are complete and damaged, check whether the drainage pipe on the upper floor is complete, and whether there is leakage (the drainage on the same floor can not be checked, and the water cannot be tested). Check whether the number of water supply points meets the requirements of the contract annex; Check whether the kitchen and bathroom drainage risers are set separately.
4. Balcony railing.
Check whether the height of the balcony railing meets the requirements of the code, check whether the vertical spacing of the balcony railing meets the requirements of the code, check whether the balcony railing is installed firmly, check whether the balcony railing needs to have anti-climbing measures, check whether the balcony has potential safety hazards that are easy to climb into the room, and check whether the balcony guardrail glass meets the requirements of the code.
-
The method of accepting the house at the time of delivery is as follows:
The first step in a new home inspection:
The developer shall notify the purchaser in writing to hand over the residence within the agreed time, and the owner shall go to the designated place of the real estate development enterprise within the time limit required by the notice of occupancy to inspect the documents that the real estate development enterprise shall obtain in accordance with the law with the certificate required by the notice of occupancy and other relevant materials. For example, two books and one table: two books refer to the "Residential Quality Assurance Certificate", "Residential Instruction Manual", and one table refers to the "Completion Acceptance Record Form".
The second step of a new home inspection:
Verify the area, the contract for the sale and purchase of the new house, and the issue of overpayment and underpayment. Confirm whether the drawings attached to the new house sales contract are consistent with reality, whether the structure of the new house is the same as the original design drawing, whether the area of the new house has been actually measured by the real estate department, and whether there is any difference between the area signed with the new house contract.
The third step of a new home inspection:
If the commercial housing has quality problems that do not meet the conditions for check-out or does not meet the agreed standards, the buyer may submit the quality problems or contents of the commercial housing that do not meet the agreed standards to the real estate development enterprise in writing, and the real estate development enterprise shall repair or compensate them one by one within a certain period of time.
1. Ground flatness inspection.
The texture of the table tennis ball is very light, put the table tennis ball on the ground, as long as the ground is slightly uneven, the table tennis ball will naturally roll to a low place, such as the bathroom requires the floor drain position to be lower, put the table tennis ball in the bathroom, if it rolls to the floor drain, it means that the bathroom floor meets the construction requirements.
2. Check the hollow drum of the wall and ground.
Check whether the wall and ground are hollow, is a very important part of the inspection process, if the cement base has a hollow drum, then the later surface layer will also be hollow, the later decoration will have an impact.
As for the inspection method is also very simple, use a small hammer to knock on the wall to listen to the sound to identify, but pay attention to be sure to grasp the strength, too much force to knock the wall to the loss outweighs the loss, if you do not grasp the strength well, it is recommended to buy a hollow drum hammer, so that you do not have to worry about improper operation and losses.
3. Check the power supply situation.
The inspection of the circuit is essential, whether all the power supply is charged when the switch is opened, whether all the power is off when the switch is turned off, these need to be checked, and the tool used is an electric pen, which requires enough patience when checking, and check one power supply at a time.
4. Sewage and sewage inspection.
On the premise of ensuring the flow of water, check whether the floor drain, sewer and sewage pipe are smooth, the tools do not need to be complicated, plastic basins or small buckets can be used, and the water is poured into the sewer pipe after receiving the water, and the smooth flow is normal.
5. Check the details of the house.
There are many places that are difficult to see during the inspection, such as the bottom of the entrance door and the bedroom door of the hardcover room, at this time you need to bring a "professional tool" to check, this "professional tool" is not complicated, a small mirror can be used, using the reflection principle of the mirror, to see if the bottom of the door is the same as it looks from the outside.
-
1.On-site survey: The acceptor should first go to the actual house to conduct on-site investigation, the structure of the house, the overall appearance of the house, the surface coating of the house, the water and electricity pipelines and other conditions of the survey, during the survey can be as close as possible to the target object to check the condition of the object, to determine the degree of perfection of the object.
2.Start the system: If the house has a corresponding system, you can start the system of the house for acceptance.
For example, the repentance key: air conditioning system, anti-theft system, smart lighting, smart home and other systems, which can verify the normality of various functions through operation. 3.
Detail inspection: check all the details of the house, especially the hidden parts, such as the state of the cabinet floor, whether the exhaust duct of the range hood is in good condition, whether the heating pipe is normal, the electrical box inspection, etc., must be checked and recorded, otherwise it is easy to ignore the problems that may arise in the future. 4.
Measuring the size: The size meter should accurately measure the size of the house to ensure that the dimensions of each plank, ceiling, wall and other dimensions are accurate. 5.
Report preparation: After the continuous review is completed, the housing acceptance report will be prepared in a timely manner, and the inspection results of each step will be recorded in detail; If there are flaws, be sure to detail them in the report and supplement the solution.
-
The steps to accept the house at the time of handover are as follows:
1. Entrance door.
Check whether the brand specifications of the entrance door are consistent with the annex to the contract, and the national standard for the anti-theft door should be met, check whether there are scratches, bruises, rust and other phenomena that seriously affect the appearance on the surface of the door leaf, check whether the door leaf is installed vertically, check whether the door frame is full of grout, whether the door frame sealing cover is complete, and whether the hinge has obvious rust.
2. Strong and weak electricity.
Check whether the meter is installed in place, whether the specifications of the meter meet the requirements, record the starting degree of the meter, check whether the intercom system line is in place, whether the intercom system function is normal, whether the installation is vertical, check whether the lighting is energized, and whether the socket is energized.
3. Water supply and drainage.
Check whether the water meter is installed in place, whether there is leakage in the front and rear joints of the water meter, record the reading of the water meter, test whether the water pressure is reasonable, whether the water pressure is too large or small, and test whether the floor drain is smooth.
4. Balcony railing.
Check whether the height of the balcony railing meets the requirements of the code, check whether the vertical spacing of the balcony railing meets the requirements of the code, and check whether the balcony railing is installed firmly.
5. Check the details of the house.
There are many places that are difficult to see during the house inspection, such as the bottom of the entrance door and the bedroom door of the hardcover room, at this time you need to bring a "professional tool" to check the stove, this "professional tool" is not complicated, a small mirror can be used, using the reflection principle of the mirror, to see if the bottom of the door is the same as the outside to see the liquid culture.
-
Hello, dear, when handing over the house, the acceptance of the house is a very important step, the following are some steps and precautions for the acceptance of the house:1Check whether the structure of the house is stable, mainly to see if the house has cracks or deformation.
2.Check that the ceiling and floor are flat to see if there are any unevenness, especially for new developments, which needs to be checked more carefully. 3.
Check whether the doors and windows are firm, whether the doors and windows can be opened and closed freely, and whether there is any air and rain leakage. 4.Check whether the circuit system is normal, whether the socket switch can be used normally, and whether the installation is liquid resistant and meets the relevant safety regulations.
5.Check whether the water, electricity, and gas pipelines are installed correctly, and whether there are any safety issues such as water leakage and electricity leakage. 6.
Check whether the cabinets and bathroom facilities are fully installed and whether there are quality problems. 7.Check the walls and ceilings for scratches, uneven paint and other decoration problems.
By the way, it is best to have a professional person go with you when you inspect the house, so that you can return to the ground to inspect the house more comprehensively and accurately. If a problem is found, it should be resolved through consultation with the developer in a timely manner.
The term of land use rights varies depending on the nature of land use, ranging from 70 years for purely residential land to 50 years for mixed commercial and residential land. Note that the starting point of the period is calculated from the time the developer acquires the land. >>>More
The time for filing land use tax is 3, 6, 9, and 12 months (before the 10th of each month) for the current quarter. >>>More
Common houses with only the right of use include the right-of-use houses with unit property rights and the right-of-use houses with the property rights of the housing management office. Most of the former are in accordance with the past policy, the original property rights units in the form of welfare housing allocated to employees for residential use. Therefore, for the right-of-use house with unit property rights, the buyer should ask the opinions of the original property rights unit. >>>More