Home décor is usually paved with wooden floors or tiles. The cost of using wooden flooring is relatively high, but it can reduce noise, moisture absorption, etc. So, today we will learn about the steps of laying wood floors, what should you pay attention to when laying wood floors?
First, the steps of laying wooden floors
1.If the ground is flat, we don't need to level the ground, we can lay the wooden floor directly. First of all, we need to lay a layer of plastic cotton film on the floor, mainly to prevent moisture and avoid deformation of the floor. The floor is then moved to the covering and easily removed when laying.
2. According to the actual situation, we have determined to lay the wooden floor from the first time, usually from the corner of the wall in turn.
3.When you place the first layer, the second block is connected to the first block. There will be grooves and protruding inserts between the plates, and the inserts must be tight when entering the slots. If there is a gap, tap it with a special tool on the hammer pad.
4.If you need to insert into the ground, you need to measure the dimensions. Dimensions must be measured. If the size is not good, the floor will be wasted, which increases our cost.
5, The floor is laid upstairs, if around the wall, we can nail the line around the wall. For aesthetic reasons, it can also be used as a fixed floor.
6.If it is a wooden floor, we need nail corners, mainly to repair the wooden floor. When nailing the corners, it is advisable to nail more to avoid the middle drum.
The above are the steps about laying wooden floors. So, what should be paid attention to when laying wooden floors?
Second, what should be paid attention to when laying wooden floors
1.Overall test shop: adjust the color difference of the floor, lay the same tone and color of the floor in obvious places such as the living room and the hallway, and lay the floor with color difference at the bottom of the furniture or in the corners to make the whole floor look beautiful and harmonious.
2.When laying a wooden floor, an expansion joint of about 8 mm must be left between the floor and the wall. Glue cannot be applied between the hardwood floor and the plywood.
3. When the wooden floor needs to be nailed, it is necessary to use special nails for the floor to enter the inclined plane, and it is impossible to use steam nails. Since wood flooring is a natural material, there is a certain difference in climate, temperature and humidity in each area, and the construction methods are also different. Professionals are advised to carry out the construction.
The above are the steps of laying wooden floors, and the knowledge of what should be paid attention to when laying wooden floors, I hope it will be helpful to everyone. If you want to lay wooden floors, you can refer to the above and lay wooden floors correctly, every step needs to be careful.
What should be paid attention to when laying wooden floors.
-
Wood flooring refers to the flooring made of wood, and the wood flooring produced in China is mainly divided into six categories: solid wood flooring, laminate flooring, solid wood flooring, multi-layer composite flooring, bamboo flooring and cork flooring, as well as emerging wood-plastic flooring.
-
Now there are two kinds of home decoration and flooring. One is floor tiles, and the other is wooden flooring. The cost of wood flooring is lower than that of floor tiles.
Moreover, the wooden floor has the function of reducing noise and absorbing moisture. Especially small children, they can play on it with their bare feet. So wooden floors often give people a feeling of mental pleasure.
With the ground relatively flat, we started to lay it. First of all, we have to spread a layer of plastic cotton film on the ground. This is mainly to prevent the deformation of the wood floor from re-damp on the ground. Then we have to move some of the flooring to the mulch so that it is easy to pick up when we lay it.
According to the situation on the site, we have to choose to start paving from **. Generally, they start from a corner of the wall.
When the first slab is laid, the second slab must be connected to the first slab. There are slots and protruding inserts between the plates. The insert should be tightly fitted into the slot.
The specific operation is to pick up a board and first put the plug of the long side into the slot on the front panel. I let the side plug of the board enter the groove of the side floor by hand push. If there is a gap, you can hit it with a special tool on the hammer pad.
Make it a perfect fit.
If the main family asks for a place to be planted or something. We're going to measure it and cut it. The size must be grasped well, and the proportion must also be grasped when cutting.
The floor is laid on the upper floor. If there are walls on all sides. We're going to nail the stickers around the wall. One is to look good, and more importantly, to stabilize the wooden floor underneath.
If it's a wooden floor for a table, we have to nail the corners. It is also mainly used to stabilize the wooden floor. When nailing the corners, it is better to drive a few more nails. Just in case there's a bulge in the middle.
The villa master provides you with local building policies, building drawings, and villa design drawings;
Villa appearance renderings service, thousands of popular drawings for you to choose.
Villa Master.
-
Wood flooring is one of the flooring decoration materials, and it is also a relatively common flooring decoration material. Many people don't know much about how to lay wooden floors. The following sections will introduce how to lay wooden floors and the precautions for laying wooden floors.
How to lay wooden floors
1.Before laying the wooden floor, make sure that the floor is level, and then spread a layer of plastic cotton film on the floor. The plastic cotton film is to prevent the floor from deforming due to moisture. The wooden floor is then placed on the floor film. It's more convenient.
2. First determine the method of laying the wooden floor, and after the measurement, you can start to lay, usually starting from the corner of the wall. When laying the first slab, the second slab must be connected. Then there is a slot and a protruding insert between the plate and the plate, and the insertion surface is tightly sewn into the slot.
The operation is to insert the long surface of the wooden floor into the slots of the front panel and push the sides of the panels into the slots of the side floor. If there is a gap, tap it with a special hammer. Can.
3.If all four sides of the paving are walls, then iron sheets should be nailed around the walls. Iron wire boards are not only better, but ultimately to stabilize the wooden floor underneath. When nailing the corners, nail a few nails. If there is a place in the middle.
What are the precautions when laying wooden floors?
Precautions when laying wooden floors1The construction work of the wooden floor should be arranged at a later stage, and no cross construction should be allowed. After the construction is completed, it should be sanded and painted as soon as possible to avoid dirty or deformed floors. When laying wooden dough floors, it is necessary to protect them from moisture, especially moisture.
In some cases, you can apply moisture-resistant paint to the floor or use fillers and moisture-proof films.
Precautions when laying wooden floors 2,The dragon bones should be flat and solid, not reinforced with cement, and can be fixed with bolts or nails, and the bones of the dragon should be made of wood for the eyes or searches, and the strong nail force should be used for larch or liu'an wood. The spacing of dragon bones should not be too large, generally less than 30 cm. The ends of the floor should fall on the dragon's bones.
They should not be left empty, and each dragon skeleton must be nailed. Water-based glues should not be used.
Precautions 3 when laying wooden floorsWhen laying the floor, it should not be too tight, leaving the left and right expansion joints, and it should not be laid too wide, if it is transported to a wider occasion, it should be cut separately and transitioned in the copper belt. The floors and the bottom floor connections of the bathroom and kitchen should be thoroughly isolated and protected from moisture.
The above is about laying wooden floors and what are the precautions when laying wooden floors, the paving effect of wooden flooring is good, but the precautions for wooden floor paving can not be ignored, otherwise the paving effect will be affected.
You can get it for free
-
Home decorations are usually packed with wooden floors or tiles, and the use of wooden floors is relatively high, but it can reduce noise, moisture absorption, etc. And then today introducedHow to lay wooden floors
How to lay wooden floorsFirst of all, lay the wooden floor If the ground is flat, we don't need to level the ground, we can lay the floor directly. First of all, in order to prevent moisture and prevent the floor from deforming, it is usually necessary to lay a plastic film on the floor. Then, when you move it to the covering, you can easily grab the floor.
How to lay wooden floors, depending on the situation, we will determine the location of the walls in turn, usually starting to build a wooden floor.
How to lay wooden floors, when laying the first layer, the second part is connected to the first. There are grooves and protruding inserts between the plates, and the inserts must be rigid. If there is a gap, use a special tool on the hammer pad to strike.
How to lay wooden floors, if it needs to be inserted into the ground, the dimensions must be measured. You need to measure the size, and if not, the floor will be wasted and the cost will increase.
5. The bottom is laid on the upper floors, if we can nail a line around the wall around all floors. For aesthetic reasons, it can also be used as a fixed floor.
How to lay wooden floorsIn the case of parquet flooring, we usually trim the corners to secure the wooden floor. If you're trimming the corners, it's a good idea to hit a few more nails to avoid the middle drum.
1. Timber floor construction should be placed at a later stage, without crossing the structure, when laying, and not when the structure or damp ground is deformed, the wood moisture measures, especially in the wetter and how, as soon as sanded in some cases, you can use moisture-proof paint on the floor, or use a padded and moisture-proof film.
2. Solid keels can not be reinforced with cement, bolts or repentant nails, choose wooden keels and should not insist on fixing or larch's strong power. Pitches can not keel, should be contained in empty shelves, each peg, instead of keel keels are nailed to tease using usually 30 cm or less, oversized floors on both ends, water-based adhesive.
3.How to lay wooden floors when laying can not be laid too tightly, if you need to remove the pressure switch to provide a large blue finger ridge applied copper strips can not lie wide. Bathrooms, kitchen floors and stone surfaces should be completely isolated from joint damping measures.
You can get it for free
-
Steps to lay wooden floors:
1.Clean the ground: Clean the ground to ensure that the ground is flat, dry, free of dust and debris, and ensure the flatness of the ground.
2.Install moisture-proof film: Seal the corners with cement after covering the floor with moisture-proof film to prevent moisture from entering.
3.Inspect the wooden floor: Check the wooden floor for damage and deformation, if there is, it is not suitable for installation.
4.Measure the room: Measure the length and width of the room to properly prepare for the use of wooden floors.
5.Laying the floor: Start from one corner of the floor, arrange it on the ground according to the size of the cut wooden floor, each wooden floor should be adjacent and not overlapping, and then use nails or nail guns to fix the wooden floor to the ground.
6.Cutting: When it reaches the corner of the room or the sinking bottom, the wooden floor needs to be cut according to the actual situation.
7.Similar methods of laying such as the rest of the flooring of Sun.
8.Trimming the floor: After laying the floor, use a chainsaw to level and polish the corners, and then apply wood floor oil for surface treatment.
Precautions for laying wooden floors:
1.Before laying a wooden floor, you should make sure that the floor is completely clean and level.
2.High-quality wood flooring should be selected to ensure its longevity and quality.
3.Professional tools and materials, such as nails and nail guns, are used during the installation process to ensure the quality of the installation.
4.The process of laying wooden floors should be carried out in a certain order, front and back, left and right.
5.Wooden floors need to be treated with moisture protection to ensure their longevity.
In conclusion, laying wooden floors requires certain steps and precautions to be adhered to, so as to ensure the quality and longevity of its installation. A good wooden floor can not only beautify the room, but also improve the comfort of the home.
-
In addition to laying tiles on the home floor, some people will also choose to lay wooden planks on the ground, because the wooden planks are relatively soft and comfortable to step on. There is no icy feeling of tiles, thenHow to lay wooden floors1. How to lay a good wooden floor.
1. How to lay the wooden floor and screen the floor. For decoration, the floor installation is carried out at a later stage, but for interior decoration, the installation of the floor is the most important and first step in the decoration. After the floor is delivered, we should not rush to disassemble it, we should place the wooden floor in the indoor shade, and wait for the floor to adapt to the temperature and humidity of the room, so that the physical properties of the floor can be more stable, and it will not be deformed in the middle of the construction due to the rapid loss of moisture, which is easy to lead to cracks.
2. How to lay the wooden floor and level the ground. Leveling is an important step when laying floors, but there is no need to worry too much. Many people have a certain misunderstanding of ground leveling, leveling is an important step in the process of laying wooden boards, because this is conducive to the convenience of laying wooden boards, that is, if you are not leveling on the ground, you also need to use keel leveling.
Generally speaking, the ground is generally flat, and only needs to be slightly repaired with plaster and sand, as long as the problem is not too big, there is no need to worry.
3. How to lay a good wooden floor and a moisture-proof film. Although the wooden floor is waterproof, it should not be left in a humid environment for a long time. Because wood is more susceptible to the influence of moisture content, especially after the change of humidity, it will deform and expand, especially for solid wood flooring.
Therefore, after we have laid the keel, we should sprinkle camphor wood blocks and desiccant below as much as possible, and we need to lay a layer of moisture-proof film, so that we can have a certain moisture-proof effect.
4. How to lay the wooden floor and lay the floor. For the floor against the wall, you need to leave a distance of 10-13mm, and you need to use the baseboard and the bottom edge to close the edge. For the gap between the floors, if it is located in the south, it needs to be adjusted a little more to avoid thermal expansion and cold contraction.
Second, what are the precautions for laying wooden boards.
1. Precautions for laying wooden boards, it is necessary to drain the moisture of the cement floor and keep our ground dry conditions. If we don't clean the water from the cement surface before the floor is installed, there will be some moisture, which will cause the floor to crack, and the result will be that the floor will warp after installation.
2. Precautions for laying wooden boards, the floor town should be surveyed in the direction of laying, and gaps should be left in special places. Before we lay the floor, we should pay attention to the direction of laying. Normally, the whole room is laid out as much as possible from the other side of the room, and then slowly turn to the other side.
3. Precautions for laying wooden boards, assembling models, and cutting floors need to be cautious. When we lay flooring, we usually use the first few rows of flooring as the standard for laying, and its main purpose is to ensure that the house is laid as a whole. Therefore, if the laying work of the first few rows must be done, and the splicing model must be done.
1. The pavement scheme should be constant.
For each stadium, or theater stage, what materials to pave, and how to pave, are determined according to the actual parameters of the sports venue and the investment budget. Therefore, once the sports wood floor paving scheme is decided, it should not be changed easily. >>>More
Introduction to the double-layer keel structure.
The double-layer keel structure is a suspended wood floor structure developed by Euclidean flooring to meet the development trend of the world's sports flooring industry, which is not only durable and durable, but also full of elasticity, and the sports performance fully meets the requirements of the German DIN standard, especially the design of an elastic shock-absorbing pad between the upper and lower keels, which solves the problem that the keel solid wood is easy to make noise in direct contact, and greatly improves the sports performance. >>>More
Consult with someone who has experience in decorating or someone who has recently finished decorating.
1. Testing performance.
Many people don't know much about the indicators that need to be achieved in the acceptance of sports wood flooring. If you only rely on visual recognition, it is obvious that it lacks enough convincing. You can use professional tools to test the paved sports wood flooring to test whether its professional performance is up to standard. >>>More
1. Check the quality of the panel before installation;
2. Lay the central floor along the direction of the central keel one by one, the surface is consistent with the design elevation, located in the center, the edge is in a straight line, and is reinforced from both sides after qualifying, the central row floor is a tenon type on both sides, and the steel nails are nailed at every 400mm at the two ends and in the middle when reinforced, and smashed into the inside of the floor, but the floor shall not be damaged, and the nail hole is smooth and smooth; >>>More