The floor of the bathroom and kitchen of the house we are buying now is not as high as the floor of our bedroom and living room, etc.
degree difference, so when the kitchen bathroom is paved with tiles (waterproof, tile plus cement mortar height greater than 4 cm), while.
Living room bedroom paved flooring (12 thick laminate flooring.
Add moisture-proof film less than or equal to centimeters), resulting in cooking.
The floor of the bathroom is more than 2 cm above the floor of the living room, so there is a "threshold".
Some people can accept this question, while others can't. One solution to this problem is.
The floor of the paving floor is all leveled to meet the requirements of the floor height of the bathroom and kitchen, but this method is Delta.
The important thing is that if geothermal heat affects geothermal energy, another way is to use bonding.
method to pave tiles, this method can greatly reduce the height of the bathroom and kitchen tile floor, but use.
There are still very few people for many reasons.
The most common treatment is to install a doorstone at the doorway.
Thus excessively achieving harmony. Been to a lot of guests.
Almost every household deals with it like this, and the final effect is as follows:
This treatment is a good way to block moisture or open water from the floor of the bathroom and kitchen.
so that it does not invade the floor.
Affect the normal use of the floor. However, it is worth noting that the floor and cement mortar should be treated well when installing the floor.
The connection of the layers should not make the floor directly contact the cement mortar layer of the bathroom or kitchen, otherwise it will come out.
Now the conduction of moisture, so that the floor is damp problems, it is best to place a floor mat at the door to avoid the flow of open water. Appear.
-
If the high one can't be shoveled, you can only fill in the low one.
-
Hello, if the floor and tiles have been installed, the more reliable and convenient way is to use high and low buckles at the joints, preferably metal, the market ** 50 yuan, a 90 cm, just use a door. If you have already laid tiles in your home, it is recommended that you level it, and if your floor is 12mm, reserve 14mm for the drop, because there is also a 2mm moisture-proof floor mat. I hope my answer will help you.
-
a The ground is uneven;
b The keel is unevenly laid;
c. Large deviation of floor thickness;
d The floor is deformed;
e Floor tenon and groove processing does not match.
-
The high ones are removed from the floor tiles, and the bottom ones are thinner.
-
What you said should be that the window head is high and the ceiling is low, so you can buckle the ceiling out to make a curtain box!
You are welcome! Hey!
-
The joint height difference and uneven joint width of sintered porous brick wall tiles may be due to:
1. The overall size of perforated bricks is not standardized;
2. There are problems in the masonry method of the construction personnel, resulting in uneven joint width;
Here's how to deal with it:
1. To purchase perforated bricks from regular manufacturers, they must have a factory certificate before they can be used;
2. Strengthen the technical quality education of employees and improve the technical level of employees.
-
The use of cement repair material leveling repair, to recommend you an economical use of cement repair material, Huatong high modulus cement repair material, thin layer repair deep repair at will, repair speed, ***, leveling repair at the same time can also deal with pavement diseases, killing two birds with one stone. The construction is very simple, 6 hours to open to traffic, high efficiency.
-
1. The raft reinforcement arrangement of high and low raft plates, the calculation of the bending angle of steel bars, the whole block of high and low raft plates is arranged and cut, and then the raft reinforcements are arranged in blocks; Note that you can't use the "Draw Reinforcement Area" command to lay out raft reinforcement! The high-rise building is generally composed of the main building and the podium, and the raft foundation of the main building and the raft foundation of the podium are of different thicknesses in the foundation, and at the same time, the post-pouring belt is generally left at the intersection of the foundation to prevent uneven settlement.
The reinforcement of the raft is generally double-layer two-way reinforcement, and the edge of the raft is made with its own edge banding structure, such as the upper rib bent down for 12d, the lower rib bent up for 15d, etc. However, when the software processes it, different calculation results will appear, and when the reinforcement function key is used to display the reinforcement result, it is found to be "30000-40+34d+12d-40". This shows that two raft foundations of different thicknesses have been anchored for 34d at the intersection and bent down for 12d at the other end, which is inconsistent with reality, how to deal with such a problem?
In general, the thickness of the raft foundation of the main building and the raft foundation of the podium is different, if the raft of the main building is separated from the raft of the podium, or there is a certain distance, then it is possible to do their own edge banding; In this way, I offset the raft foundation of all the podium from the raft base of the main building by 1mm, and after summarizing, the result of the reinforcement check is "30000-40+15d+12d-40", which shows that the reinforcement of the raft foundation of the main building and the podium do their own edge banding structure. From the above examples, we can know that the calculation results are used to analyze the graph, find the problems of the graph, and achieve the calculation results that match the actual situation through adjustments that have little impact.
When the software is processed, there will be an association relationship in the software after the intersection of various components, and this association relationship can not be removed, in most cases the components are associated, although a 1mm is not much different, but it provides us with a reverse solution to the problem! This method of analyzing the problem is a skill that every cost person who uses software should master in his work. In the actual construction, according to the drawings description, when the end has an overhanging structure, the upper and lower edges should be sealed to form a lap (la) three raft reinforcements of more than three kinds of plate thickness in the same raft foundation, and the raft plate with more than three plate thicknesses is arranged, except that the plate between the elevator is the thickest and arranged with a water collection well, the middle plate thickness can not be cut into blocks in the middle of the raft foundation, so it has to be arranged with a water collection well; However, the wellhead of the sump is set to 50*50;The height is 0, and the ribbing setting of the four-thick raft is set
Temporarily arrange with the pads: set the spacing of the pads to twice the spacing of the ribs, and modify the upper length of the pads and the length of the pads; So that the calculated amount is the same as the amount of the two tensions. 5. The order of the calculation results is from north (top) to south (bottom); From west (left) to east (right) Liuluban rebar budget version adds the function of freely drawing the collection well, which supports adjusting the direction of the rebar and the grading parameters of each side (the grading parameter adjustment supports the angle input method and the grading horizontal length input mode.
-
1. The bathroom door is generally between 60-70cm, and there is 60cm space after the door sleeve is done, and if there is a condition to expand the door opening, it is best to be 70 cm wide.
2. There must be a height difference between the laminate floor and the floor tiles, and the treatment methods: 1) The bathroom and the kitchen use marble transition, close to the laminate floor while grinding the beveled edge, so that there will not be an obvious height difference; 2) The bathroom is 2 cm lower than the outside, and it is normal for the threshold stone to be higher than the reinforcement board, so let it have a height.
Drink plenty of hot water, take a bath, wipe your body with warmer water, etc. If the child has a low-grade fever, he can choose to physically cool down, drink more hot water, let him sweat, take a bath or wipe his body with hotter warm water, if the body temperature has not dropped, but a high fever, you need to go to the hospital immediately.
When a child robs things and robs other people's things, parents need to educate him positively, ask him to return other people's things, and not to rob other people's things.
1. Abrasion (** surface damage after friction).
Treatment: a. Mild abrasions: Those with clean wounds can generally heal themselves as long as they apply red or purple syrup. >>>More
Children with high fever and more convulsions are prone to epilepsy. So be sure to pay attention to prevention. If the child has a fever, he can use pediatric massage to reduce fever, and the effect is good. >>>More
The treatment method after a slight scratch of the car: one: the bumper, rearview mirror and wheel eyebrow are scratched, because it is a plastic part, it will not rust, it doesn't matter if the problem is small or not, you can also use a paint pen or a small can of spray paint to repair the scars yourself. >>>More