Why should the national investment in the diversion project be charged?

Updated on society 2024-03-07
22 answers
  1. Anonymous users2024-02-06

    Satisfied. Half of the country's money was spent by the official grandfather.

  2. Anonymous users2024-02-05

    The main stream of the Tao River is to take water from the electric pumping station, build water pipelines, safety storage tanks, water purification plants and water distribution mains, and the project design water diversion flow is cubic meters per second, with an annual water diversion of 8.56 million cubic meters and an estimated investment of more than 100 million yuan. After the implementation of the project, it will meet the needs of residents and industrial water and rural people and livestock in 12 administrative villages, including Chengguan Town and Fanjiazui in Lintan County, and take into account the solution of the problem of water for the settlement of nomadic herdsmen in the ecological protection of the Yellow River water source area.

  3. Anonymous users2024-02-04

    Yes. According to the "Interim Measures for the Management of Quality Deposit for Construction Projects": for construction projects that use all or part of the investment, the quality margin shall be reserved at about 5% of the total settlement amount of the project price. Social investment projects can be implemented by reference.

    It's not a hard and fast rule, it's generally 5%, but there are 10%, and I've never seen more than 10%.

  4. Anonymous users2024-02-03

    To do engineering construction projects, you must pay a deposit, and the state has this regulation as follows:

    The Measures for Bidding and Bidding for the Construction of Engineering Construction Projects and the Measures for the Bidding and Bidding of Goods for Engineering Construction Projects both stipulate that the bid deposit shall generally not exceed 2% of the total bid price, and the maximum shall not exceed 800,000 yuan.

    The deposit is to guarantee the performance of the debt, the debtor or a third party will hand over a certain amount of money to the creditor for possession, and when the debtor fails to perform the contract, the creditor can be repaid in priority for the deposit paid by the debtor.

    Article 37 of the Measures for Bidding and Bidding for the Construction of Engineering Construction Projects stipulates that the tenderer may require the bidder to submit a bid bond in the bidding documents. In addition to cash, the bid bond can be a bank guarantee, a certified check, a bank draft or a cash check issued by the bank.

    The bid deposit shall not exceed 2% of the estimated price of the project, but the maximum shall not exceed RMB 800,000. The validity period of the bid bond shall be consistent with the validity period of the bid.

    The bidder shall, in accordance with the manner and amount required by the bidding documents, submit the bid bond with the bidding documents to the tenderer or its entrusted bidding agency. For domestic bidders of projects that must be tendered for construction in accordance with the law, the bid bond submitted in the form of cash or cheque shall be transferred from its basic account.

  5. Anonymous users2024-02-02

    If you are unqualified and use some inferior materials, you are immediately required to rectify until you are qualified, and if you do not rectify it, your deposit will be deducted.

  6. Anonymous users2024-02-01

    Yes, the main ones to be paid are bid bonds, performance bonds, project quality bonds, and migrant workers' wage deposits.

    Reference: "Bidding and Bidding Law of the People's Republic of China", "Measures for the Management of Quality Deposit of Construction Projects".

    Opinions of the General Office on Comprehensively Addressing the Problem of Wage Arrears for Migrant Workers" Guo Ban Fa 2016 No. 1.

  7. Anonymous users2024-01-31

    There are individuals who have to pay accidents, and groups don't have much money.

  8. Anonymous users2024-01-30

    The world's mainstream now uses lists.

    The list is more scientific, more reasonable, and more accurate, and is gradually replacing the quota.

    Hope it helps.

  9. Anonymous users2024-01-29

    The cost of the project is copied.

    The audit fee is usually composed of two parts: basic fee + additional fee, the basic fee is generally set at about the total cost of the construction unit submitted for review, and the additional fee is generally set at about 4-9% of the amount of the medium-priced institution.

    The cost of audit services shall be paid by the construction unit and shall be separately paid in the project investment (the Ministry of Finance of the People's Republic of China has relevant regulations).

    Now the state does not make hard and fast regulations on the project audit fee standard, but only to guide the price, and the specific audit department can be negotiated.

    However, at present, when hiring an audit agency or signing a construction contract, it will be agreed at the same time that after the reduction ratio exceeds a certain percentage, the audit fee payable for the excess part of the proportion shall be paid by the construction unit. Prevent joint fraud between the construction unit and the audit unit.

    Expedited Customs Clearance Program ACCA's Global Private Classes College Students' Employer Express Program Weekend Face-to-face Classes Winter and Summer Vacation Crash Classes Other Courses.

  10. Anonymous users2024-01-28

    If you charge it normally, there will be an additional charge of 30806

  11. Anonymous users2024-01-27

    I want to know if PwC is a fraud, and I said that I could withdraw it, but it has not yet arrived in the account.

  12. Anonymous users2024-01-26

    First of all, you have to go to see the bidding documents and audit forms.

    If the audit has not been recalled, you can ask the owner, answer that they invite the audit unit when the audit fee is set, if there is no owner set the audit fee, you can refer to the national and local project cost consulting fees combined with the market.

  13. Anonymous users2024-01-25

    Here's a copy of Wuxi, Jiangsu.

    The terms of the contract for the regional fee bai, I hope you can learn from it:

    1. Preparation of bill of quantities and bottom bid

    The service fee is calculated according to the "Su Price Service (2004) No. 483" DAO "Jiangsu Province Engineering Cost Consulting Fee Standard" by 55%. 2. The whole process of cost control consultation in the construction stage is calculated according to the project cost (the personnel are not resident on site, and the cost control work is handled in a timely manner according to the needs of the project). 3. The service fee for the audit and consultation of the project completion settlement shall be calculated according to the amount of the reduction.

  14. Anonymous users2024-01-24

    The rate of the reduction amount is charged at 6% within 5% of the amount of the application fee, and the rate is charged at 8% beyond the reduction of 5% of the amount of the application for review), and the employer pays the contractor to 95% of the final review amount after deducting the audit fee, and the remaining 5% is used as the warranty money, and the return of the quality warranty money shall comply with the agreement in the quality warranty certificate. The audit service fee is paid by Party A, but both parties A and B in the China Jian'an market have been equal in a timely manner, you know.

  15. Anonymous users2024-01-23

    It is impossible for the state to invest in such a small project, as long as it is a state-funded project, regardless of the size of the project, the use of funds must be audited.

  16. Anonymous users2024-01-22

    On the one hand, Hangzhou hopes to improve the living and leisure environment of Hangzhou through the renovation of the West Lake Scenic Area and the exemption of tickets, on the other hand, by greatly increasing the tickets of scenic spots around the West Lake such as Lingyin, Leifeng Pagoda, Tiger Run and other scenic spots to stabilize the income of tourist tickets. By renovating the West Lake for free and improving the surrounding scenic spots, Hangzhou has not only improved the city's living environment but also stabilized its tourism income, so why not?

    As for Xixi Wetland, it is a national wetland park, in addition to the role of tourism, but also to protect the local ecological environment, it is obvious to control the number of tourists through the entrance fee**.

  17. Anonymous users2024-01-21

    This is the wise decision of the local **, last year's May 11** week in the income ranking of all tourist areas in Hangzhou is the first, you want to pay a very reward.

  18. Anonymous users2024-01-20

    A good tourist attraction does not necessarily have to charge an entrance fee, as long as you spend there you can still recoup your investment. The increase in the amount of funds for the consumption of non-admission fees is much greater than the revenue from tickets.

  19. Anonymous users2024-01-19

    For example, China has helped build a lot of railway stations in Tanzania for free, but Tanzanians don't accept the love of the Chinese. Japan gave Tanzania a road for free, and now the road is running on used cars that have been eliminated by Japan.

    It can be seen that you can't give up the child and can't trap the wolf, of course, you just can't give up the child, and you can't trap the sheep Sheep don't eat meat!

    In the same way, it is obviously impossible to build a park similar to West Lake in the wetlands of Xixi, one is because the ecology of Xixi is relatively fragile, and it is still in a relatively natural state, which is different from West Lake, which is already very humanistic, and has been transformed into a humanistic one, and forcibly developing Xixi is contrary to national policy, and the other is because Xixi has not yet become a strong agent for Hangzhou's tourism industry, and the GDP brought by the ancillary industries of tourism brought by Xixi has not yet reached a certain level, and it is necessary to maintain daily expenses.

  20. Anonymous users2024-01-18

    Why is it an online club?

    In that case, I can't it!

    Woo

  21. Anonymous users2024-01-17

    You're from the 04 Note of the Finance Academy, hehe.

    Dare to ask who is iayfang?

    Amei, even if you note it, you can't copy it, hehe.

  22. Anonymous users2024-01-16

    Why can't it be a network club.

Related questions
7 answers2024-03-07

Significance First of all, improving the living conditions of low-income urban residents is an important livelihood issue, and accelerating the construction of affordable housing projects is of great significance for improving people's livelihood and promoting social harmony and stability. Among the principles of the arrangement of the new 100 billion yuan** investment, the most important one is to invest in the places with the highest efficiency and the most need for development. In this sense, making great efforts to speed up the construction of affordable housing projects is a timely move to promote China's economic and social development. >>>More

7 answers2024-03-07

The 2016 registered safety engineer exam time has not yet been announced, but last year, the widely circulated in the circle of friends about the cancellation of the registration qualification of registered safety engineers is still being questioned. >>>More

5 answers2024-03-07

The so-called "Three Gold Project" refers to the "Golden Card, Golden Customs, and Golden Bridge" project. This is a major electronic information project that the state has started in recent years and is gradually implementing.