What does the tender notice have to say?

Updated on society 2024-03-16
6 answers
  1. Anonymous users2024-02-06

    Name and address of the tenderee.

    The name, quantity, technical specifications, and funds of the tendered goods**.

    Place and time of delivery.

    Where and when to obtain tender documents or prequalification documents.

    Fees charged for bidding documents or prequalification documents.

    The location and deadline for submitting prequalification applications or tender documents.

    Qualification requirements for bidders.

    The tender announcement of the project that must be tendered in accordance with the law shall be published through the newspapers and periodicals, information networks or other media designated by the state.

  2. Anonymous users2024-02-05

    1) the name and address of the tenderer, the name of the bidding project;

    2) the nature and quantity of the bidding project;

    3) the place and time of implementation;

    4) Bid deadline and bid opening time;

    5) the qualifications of the bidder;

    6) Methods for obtaining prequalification documents and bidding documents.

  3. Anonymous users2024-02-04

    1. Project name.

    2. Bidding content (approximate content).

    3. Total investment.

    4. Project scale (approximate content).

    5. Plan the start and completion time.

    6. Eligibility for registration.

    7. Registration requirements (materials required for registration).

    8. Registration time.

    9. Registration address.

    10. Contact person **.

    So be it, in order.

  4. Anonymous users2024-02-03

    1) Basic information and data table;

    2) List of members of the bid evaluation committee;

    3) Bid opening records;

    4) a list of bids that meet the requirements;

    5) Description of the scrapped standard;

    6) a list of bid evaluation criteria, bid evaluation methods or bid evaluation factors;

    7) Reviewed ** or score comparison list;

    8) the evaluation of the bidders ranking;

    9) the list of recommended winning bidders and the matters to be dealt with before signing the contract;

    10) Minutes of clarification, explanation and correction.

    Measures for the Bidding of Orange Bidding for the Construction of Engineering Construction Projects

    Article 65 For projects that must be tendered for construction in accordance with the law, the tenderer shall, within 15 days from the date of issuance of the notice of winning the bid, submit a written report on the bidding situation to the relevant administrative supervision department.

    The written report referred to in the preceding paragraph shall include at least the following contents:

    A) the scope of the bidding;

    B) the bidding method and the medium of issuing the tender announcement;

    3) the bidding documents bidder's instructions, technical terms, bid evaluation standards and methods, the main terms of the contract, etc.;

    4) the composition of the bid evaluation committee and the bid evaluation report;

    5) Winning the bid.

  5. Anonymous users2024-02-02

    2) the nature and quantity of the bidding project;

    3) the place and time of implementation;

    4) Bid deadline and bid opening time;

    5) the qualifications of the bidder;

    6) Methods for obtaining prequalification documents and bidding documents.

  6. Anonymous users2024-02-01

    According to Article 13 of the Administrative Measures for Bidding and Bidding for the Procurement of Goods and Services, the public tender announcement shall include the following main contents:

    1) The name, address and contact information of the purchaser and the procurement agency entrusted by it;

    2) The name of the procurement project, the budget amount, the maximum price limit shall also be disclosed;

    3) the procurement needs of the purchaser;

    4) the qualification requirements of the bidder;

    E) the time limit, place, method and price of the bidding documents to obtain the bidding documents;

    6) the period of announcement;

    7) the deadline for bidding, the time and place of bid opening;

    8) Name and ** of the contact person for the procurement project.

    Article 14 of the measures for bidding and bidding for the construction of engineering construction projects shall contain at least the following contents:

    A) the name and address of the tenderer;

    2) the content, scale and capital of the bidding project;

    C) the place and duration of the implementation of the bidding project;

    D) the place and time of obtaining the bidding documents or prequalification documents;

    E) the fee charged for the bidding documents or prequalification documents;

    6) Requirements for the qualification level of the bidder.

    Extended Information: Types of Tender Notices:

    1) According to the content of the bidding, it can be divided into construction project bidding announcements, labor bidding announcements, bulk commodity trading announcements, design bidding announcements, enterprise contracting bidding announcements, enterprise leasing bidding announcements, etc.

    2) According to the scope of the bidding, it can be divided into international bidding announcements, domestic bidding announcements, internal bidding announcements and internal bidding announcements of the unit.

    3) According to the term of the contract, it can be divided into two categories: long-term bidding announcement and short-term bidding announcement.

    4) According to the bidding link, it can be divided into bidding announcements, bidding notices, bidding regulations, etc.

Related questions
11 answers2024-03-16

The first keyless entry.

The "keyless entry system" is not a traditional key, it has an intelligent electronic chip inside, and when you step into a specified range, the system can recognize you as an authorized driver and automatically unlock the door. In the past, this configuration was only available in luxury models, but now many independent brands have popularized it and is a very practical configuration. >>>More

10 answers2024-03-16

On the coal mine, I would like to add a few points:

1. Emergency avoidance system drill. It involves safety monitoring and monitoring system, personnel positioning system, communication system, compressed air self-rescue system, water supply rescue system, and emergency avoidance system (which has not yet been established in China). >>>More

21 answers2024-03-16

Yes, people need the nourishment of love, otherwise it will be meaningless to live for decades.

16 answers2024-03-16

Social disease! On the one hand, it is decreasing, and on the other hand, it is more than the original. Society needs talents. Parents want to call their children to become talents, the education department wants grades, teachers can only shout to reduce the burden and increase the burden, there is a lot of homework.

3 answers2024-03-16

What I understand roughly means is that when a person is strong enough in his heart, he has his own perseverance and spiritual sanctuary, and is not disturbed by outsiders, then his heart will be calm and calm. >>>More