You understand quite right, the certification department responsible for qualification and professional certification is different.
-
I just got out of the exam last year, if you don't know anything, you can consult me in detail!
My mailbox.
-
The differences between a budgeter and a estimator are:
1. The meaning is different: the budgeter has two meanings, one refers to the detailed or rough statistics made on the most basic labor, materials, machinery and other expenses completed by a project, including taxes, profits, etc. Second, it is also called a construction budget officer or a civil construction budget officer.
Cost officer refers to the professional who has passed the cost qualification examination, obtained the "National Construction Project Cost Qualification Certificate", and obtained the practitioner seal through registration and engaged in engineering cost activities.
2. The policy is different: on January 13, 2016, the executive meeting decided to cancel 61 professional qualification licenses and recognition items on the basis of the previous cancellation of 211 professional qualifications in four batches. The national construction project cost engineer qualification is one of them.
The budgeter did not cancel.
3. Job responsibilities are different: the budget clerk is mainly responsible for reviewing construction drawings, participating in drawing review and technical disclosure, and making budget adjustments according to their records. Assist the leaders to do a good job in the project declaration, organize bidding, approval before the start of construction and acceptance after completion.
Fully grasp the terms of the construction contract, go deep into the site to understand the construction situation, and lay a good foundation for the final account review.
The responsibilities of the cost officer are to be familiar with the laws and regulations of the country and the management regulations related to the project cost, be proficient in the theoretical knowledge of the profession, be familiar with the engineering drawings, master the project budget quota and relevant policies and regulations, and lay the foundation for the correct preparation and review of the budget. Responsible for reviewing construction drawings, participating in drawing review and technical disclosure, and making budget adjustments according to their records.
-
<> friends who do engineering cost may know that the budgeter and the cost clerk seem to be a bit similar in terms of work content, but in fact, there are certain differences between them. Today, the bidding network will explain the difference between the budget officer and the cost officer, let's take a look!
Cost officer refers to the cost of the qualification examination, obtained the "National Construction Project Cost Qualification Certificate", and through registration to obtain the professional seal, engaged in engineering cost activities. Originally referred to budget estimators.
The most important thing is to be professional, to be familiar with the drawings, to the current price list, comprehensive and various quotas, building materials must be familiar, in addition to the calculation formula of the engineering quantity, the structural practice of the project, concealed engineering, change and other professional to be familiar with the use, analysis of materials and calculation of engineering materials; Familiar with the sub-items and sets of items in the quota, and be able to communicate with Party A, supervision, audit and other departments.
Difference Between Estimator and Estimator:
1. Difference in conceptual understanding: budget is only a single small item within the scope of cost; 2. The scope of work is different: the budget clerk is mainly the budget rather than other work related to the project cost, while the cost can be engaged in bidding, bidding, auditing and other more extensive work.
The budget clerk is to budget the investment of the project before the construction of the project, and the cost clerk is to carry out cost consulting (audit) work on the actual cost of the project after the completion of the project. Estimators can also work on budgeting, but they cannot do cost consulting. 3. The nature of practice is different
As long as the budget clerk has obtained the certificate and seal, it is basically OK, and the cost clerk must be registered, and the local cost management department will carry out management and continuing education and training. 4. The scope of practice is different: generally speaking, the budget clerk can only work effectively in the local area where the certificate is issued, while the cost clerk is used nationwide.
-
1. The certificate is different. The budget officer is a certificate printed by the Hubei Provincial Department of Construction and issued by the Hubei Provincial Department of Construction. The cost clerk is the certificate of the China Cost Consulting Association (China Price Association) and is issued by the Hubei Provincial Cost Management Station.
2. The budget clerk is a qualified certificate for the training of key positions in the construction industry in Hubei Province, and the certificate can only be issued after passing the examination after participating in the training. The cost officer is the national cost officer qualification certificate, and there is no requirement for training.
3. The application conditions are different, and the budget staff basically does not limit the application conditions, and does not require relevant work experience. There are strict application conditions for cost personnel, and non-cost majors must have more than one year of cost-related work.
So many questions·· If you still want to learn all at once about civil engineering, garden installation, steel structure and water conservancy!! >>>More
1) The two levels are different: the cost engineer is intermediate, and the budget clerk is junior. >>>More
Very good, as long as you do this line, you should do anything, the budget is more careful than the construction, you can't miss items, you can't have more than one, the requirements are fast, accurate, good, your first entry is to look at the engineering quantity calculation rules! "Those that should be counted, those included in the project, and those that can't be counted" (because you are more familiar with the construction drawings) The second is the calculation method: according to the construction order. >>>More
There is nothing difficult in the world, but I am afraid of those who have a heart.
Corrected, it's the cost officer, not the cost engineer. It's not very important, but if you want to engage in the cost industry, you generally need to take the test, which is equivalent to a qualification certificate. I can only say that the more certificates, the better, and you will have a higher pass rate in school, and the people I know have basically passed the exam twice, one is that I am busy with work and have no time to review, and the other is that the invigilation in the society is stricter. >>>More