-
In the level of the land construction deep foundation on it. I built on it.
-
Section 1 Leveling the land and preventing the ramming of the dam.
Mechanical excavation and earthmoving.
First, the main construction equipment.
1. Excavation and earthmoving machinery: excavators, bulldozers, scrapers, dump trucks, etc.
2. Main measuring tools: theodolite, level, shovel, trolley, sledgehammer, wooden stake, small white line or 20 lead wire, 50 meters steel ruler, slope ruler, etc.
2. Preparation for construction.
1. According to the geometric dimensions of earthwork excavation, engineering geology and hydrogeology and surrounding environmental conditions, the earthwork technical disclosure is prepared, including slope support and earthwork excavation.
2. Before earthwork excavation, the above-ground and underground obstacles in the construction area should be removed and treated according to the construction plan and technical disclosure requirements, and the drainage work should be done on the surface.
3. Organize the project planning map according to the ground provided by the owner, sprinkle the earthwork excavation edge and river planning line, and should pass the inspection and complete the pre-inspection procedures.
4. Before night construction, there should be sufficient lighting facilities, obvious signs and red lighting warning signs should be set up in dangerous areas, and the excavation sequence should be reasonably arranged to prevent wrong excavation and over-excavation.
5. The roads, bridges and unloading facilities through which the construction machinery enters the site should be inspected first, and preparations such as reinforcement and widening should be made if necessary.
6. Build a ramp for transporting vehicles in the construction area, the slope should be less than 1:6, and when the slope surface strength is low, the pavement soil layer should be paved with gravel or muck of appropriate thickness to avoid the collapse of construction machinery.
7. Select earthmoving machinery, according to the topography and operating conditions of the construction area, soil type and thickness, total engineering quantity and construction period, give full play to the benefits of construction machinery, and prepare a construction plan.
8, the layout of the running route in the construction area, according to the size of the working face of the construction section operation area, mechanical properties, transportation distance, etc. and the terrain undulations are determined, each section and the main transportation line according to the site slope, select the part of the excavation and fill combination or the part with less amount of excavation and filling to determine, in order to prevent the destruction of the excavation unfinished transport road.
9. In the parts that cannot be operated by machinery, the slope slope and cleaning are equipped with manual work.
Third, the technical regulations for the operation of land leveling and guest soil padding.
The demonstration area is divided into 15 square fields by the production road, and the shape of the fields is mainly rectangular, and the slope in the square fields is less than 5°.
Hope it solves your problem.
-
Farmland rectification projects do not belong to the six types of projects that apply for construction permits, so construction permits are required.
Farmland rectification project is to change scattered small plots of land and infertile land, or land that is not suitable for irrigation, or other fields that are not suitable for mechanized operations, into fields that can improve yield and overall income, collectively referred to as farmland rectification projects.
Types of works that do not require a construction permit:
1. Minor projects below the limit determined by the construction administrative department (construction projects with an investment of less than 300,000 yuan or a construction area of less than 300 square meters);
2. As a project for the protection of cultural relics;
3. Rescue and disaster relief projects;
4. Temporary buildings;
5. Military housing construction;
6. Approve the construction project of the commencement report in accordance with the authority and procedures specified in the first place.
-
The construction process of the sub-project should accept and meet the requirements of the overall construction organization design, and the completion of the project should be accepted, and meet the requirements of the overall project construction period, quality requirements and investment estimates.
-
Farmland rectification refers to the improvement and transformation of farmland, and generally refers to farmland infrastructure construction such as adding ditches to create land.
You can refer to. Turn left|Turn right.
It generally includes the following contents: engineering pay-off, earthwork excavation, concrete pouring, steel bar binding, formwork installation, brick wall masonry, steel (wood) structure manufacturing and installation, stone paving and other decoration, sketches and furniture placement; Terrain arrangement, seedling planting, etc.
The basic way of flow construction.
First, wait for the rhythm of the flow of construction. >>>More
The preparation procedure for the general design of the construction organization is as follows:1. Collect and be familiar with the relevant materials and drawings required for the general design of the construction organization, and investigate and study the characteristics and construction conditions of the project; >>>More
and a wide range of savannahs. There is a prairie, wide, that prairie should be very good.