Engineering English translation, ask friends to translate, urgent

Updated on educate 2024-04-08
4 answers
  1. Anonymous users2024-02-07

    12th, sep. the mid-autumn festival, there will be half day off for workers.

    13th, sep. outer wall building will start in packaging workshop, which heigth elevation is over

    meters

    14th, sep. bumping-prevention post will be yield in finished product warehouse

    15th, sep. turnover materials in packing workshop 2nd floor will be cleaned up and returned

    16th, sep. outer wall of elevator room in packaging workshop 2nd floor will be in building

    17th, sep. outer wall building will start in packaging workshop 1st floor.

    18th, sep. plastering inside face of the wall in packaging workshop 2nd floor begin.

    Translated into complete sentences as you requested.

    Actually, something like this is just a sticky note or a project schedule, and it doesn't need a complete sentence, a phrase, or a phrase to be OK.

  2. Anonymous users2024-02-06

    deck、through is a proper noun.,I'm not learning this line.,You have to check the book.,deck type is the kind of load-bearing objects of Zhaozhou Bridge are under the road; Through Type is the kind of cable bridge (bionic cheetah skeleton) of the Golden Gate Bridge, and the pavement is between the load-bearing objects.

    Original] Bridges in recent years can be roughly divided into two categories: deck and through. The deck class is a bridge where the pavement is laid on top of a load-bearing structure.

    All the load units in the whole structure are under the road surface (he is a bit repetitive. In the case of through, the pavement is laid between the units of a monolithic load-bearing structure, such as a cable-stayed bridge.

  3. Anonymous users2024-02-05

    In recent years, bridges can be divided into two types: "deck" or "through" type. On the deck of various types of bridges, supporting structures above the road, that is, the superstructure of the bearing elements in the road.

    In the type of bridge, the road passes through the components between the superstructure, as in the bridge through steel trusses. The dominant deck structures, as they have a clean exterior and offer a little better scenery for drivers in the surrounding area, solve the problem that future traffic really needs it.

  4. Anonymous users2024-02-04

    Corrosion onset time.

    Fig. 3 shows the potential of the half-cell for 14 C3a, measured along with 10 and 20 silica powder blended cement concrete. Part of the specimen is soaked in 5 NaCl.

    The solution and simulate the case of chloride corrosion, where chloride migration spreads to the steel from the outside at the concrete interface.

    The service life of the concrete structure. Table 1 shows the time -270 mV (standard coal), which is over time the plain and begins to take the corrosive silica powder, composite cement concrete. These data show that both 10 and 20 silica powders, composite cement concrete are carried out three times better, and the corrosion onset time is better than that of ordinary cement concrete.

    Similar results (rasheeduzzafar and others. 1991), got the writer.

Related questions
7 answers2024-04-08

3I like special clothes with good lyrics (rhythm lyrics forgot the meaning of the word).

8 answers2024-04-08

A typical setting for a young man's double-slit experiment. The distance between the double slit to the screen is m. The crack separation is millimeters and the wavelength of the incident light is 633 nm. >>>More

5 answers2024-04-08

Many people think that when they become rich and successful, happiness will follow. Let me tell you that the world is full of miserable rich people living in hell. Money obtained by dishonest means does not bring happiness. >>>More

4 answers2024-04-08

I'll translate it for you: the other tools are the command line program package source: distribution. >>>More

7 answers2024-04-08

There's a lot of English for that industrial engineering major.。。。