For the project subcontracted by Party A, is the data made in the name of the general contractor or

Updated on society 2024-04-27
16 answers
  1. Anonymous users2024-02-08

    First Party. For the subcontracted project, the information is done by the general contractor, of course, the subcontractor can also do it, but the information is still stamped with the seal of the general contractor, and the subcontractor must hand over the information to the general contractor.

    Only the general contractor has the right to apply for inspection, and the information needs to be archived.

    Engineering contracting is with construction qualifications.

    The contractor is responsible for the process of undertaking the project by signing a contract with the project legal person (owner) of the project. Engineering contracting contracts can be divided into general contracting, sub-contracting, subcontracting, subcontracting, labor contracting, and design and construction contracts.

  2. Anonymous users2024-02-07

    The project data subcontracted by the house should be made in the name of subcontracting, because in this way the respective tests can be linked.

  3. Anonymous users2024-02-06

    The project data subcontracted by Party A is of course in the name of subcontracting in the name of subcontracting.

  4. Anonymous users2024-02-05

    Since it is a subcontracted project by Party A, of course, his information is sent in the name of subcontracting, but all these materials must meet the specifications of the general contractor.

  5. Anonymous users2024-02-04

    The project data subcontracted by Party A is a kind of registration billion or subcontracting, and the name should be. The reputation of the headquarters.

  6. Anonymous users2024-02-03

    If it is a project subcontracted by Party A, it is sent out in the name of pharmaceutical subcontractor in his name, and cannot be sent in the name of the general contractor.

  7. Anonymous users2024-02-02

    The project materials subcontracted by Party A are subcontracted in the general contract or subcontracted in the contract, and these should be in the name of subcontracting.

  8. Anonymous users2024-02-01

    The name of the package in the project data 11 subcontracted by Party A or you subcontract rice to make the data, and the workers subcontracted by Party A should be in the name of subcontracting, because if you say um, a kind of speed holding you is unreasonable, because in this way, it is not good to be yourself.

  9. Anonymous users2024-01-31

    The general situation is that the project subcontracted by Party A is always done in the name of the general contractor or the subcontractor, and this general situation is negotiated in advance, or it is carried out in the contract or agreement, and it must be explained.

  10. Anonymous users2024-01-30

    No, Party A and Party B are separated.

  11. Anonymous users2024-01-29

    I'm glad that the information you made in the name of the subcontract here has been approved.

  12. Anonymous users2024-01-28

    Summary. For the project subcontracted by Party A, the information is done by the general contractor, of course, the subcontractor can also do it, but the information is still stamped with the seal of the general contractor, and the subcontractor must hand over the information to the general contractor.

    For the project subcontracted by Party A, is the data made in the name of the general contractor or the name of the subcontractor?

    Party A subcontracts out the reputation of the project, the information is done by the general shelter or the contractor, of course, the subcontractor can also do, but the information is still stamped with the general contractor's macro and void seal, and the subcontractor must hand over the information to the general contractor.

    Only the general contractor has the right to apply for inspection, and the information needs to be archived. Project contracting is the process in which a contractor with construction qualifications is responsible for the construction of the project by signing a contract with the project legal hermit (owner) of the project. Engineering contracting contracts can be divided into general contracting, sub-project contracting, subcontracting, subcontracting, labor contracting, and design and construction contracts.

    Only the general contractor has the right to apply for inspection, and the information needs to be archived. Project contracting is the process in which a contractor with construction qualifications is responsible for the construction of the project by signing a contract with the project legal hermit (owner) of the project. Engineering contracting contracts can be divided into general contracting, sub-project contracting, subcontracting, subcontracting, labor contracting, and design and construction contracts.

  13. Anonymous users2024-01-27

    The information is made by the general contractor, of course, the subcontractor can also do it, but the information is still stamped with the seal of the general contractor, and the subcontractor must hand over the information to the general contractor. Only the general contractor has the right to apply for inspection, and the information needs to be archived.

    The information shall be made by the subcontractor, summarized by the general contractor, and signed by the subcontractor and the general contractor respectively and stamped with the seal of the general contractor. "On the surface, it is correct, but the project can not be delivered for acceptance, because according to the regulations, the general contractor does not have the construction qualification, and the fire protection project needs the professional construction qualification of the fire protection to be constructed and accepted.

  14. Anonymous users2024-01-26

    Party A can subcontract foundation and foundation treatment engineering, earthwork engineering, doors and windows, railings, waterproofing, public part decoration, fire protection, landscape and other professional projects. When subcontracting, the main body shall have the corresponding qualifications and obtain the consent of the employer, and the construction of the main structure shall not be subcontracted, and the non-main structure project may be subcontracted, and the project shall not be subcontracted in whole or subcontracted again.

    [Legal basis].

    Article 29 of the Construction Law The general contractor of a construction project may contract part of the contracted project to a subcontractor with corresponding qualifications; However, except for the subcontract agreed in the general contract, it must be approved by the construction unit. In the case of general contracting, the construction of the main structure of the construction project must be completed by the general contractor. The general contractor of the construction project shall be responsible for the construction unit in accordance with the provisions of the general contracting contract; The subcontractor shall be responsible for the general contractor in accordance with the provisions of the subcontract.

    The general contractor and the subcontractor shall be jointly and severally liable to the construction unit for the subcontracted project. The general contractor is prohibited from subcontracting the project to a unit that does not have the corresponding qualifications. It is forbidden for a subcontractor to subcontract the project it has contracted.

  15. Anonymous users2024-01-25

    If Party A designates a subcontractor, the subcontractor has a legal contract with Party A; can be stamped with the seal of the subcontract;

    If the contract is signed with the consent of Party A (with written opinions) and the general contractor, the seal of the subcontract can be stamped;

    Otherwise, it is an illegal subcontract in private, of course, it is necessary to stamp the seal of the general contractor (the seal of the subcontract is not exposed)!

  16. Anonymous users2024-01-24

    Chapter and the project manager are both general contractors, and they must be, and the information report to the urban construction family will not recognize your professional subcontracting, only the general contractor.

Related questions
10 answers2024-04-27

1. Responsible for independently completing the collection and compilation of engineering data; >>>More

9 answers2024-04-27

If you plan to sign a contract with someone else, you will usually sign the contract according to the wishes of both parties. So how should Party A and Party B be determined in the contract? Party A generally refers to the party that proposes the goal, and in the process of contract formulation, it mainly proposes what goal to achieve, and Party B generally refers to the party that completes the goal, and in the contract, it mainly proposes how to ensure the realization and obtain benefits according to the completion situation. >>>More

7 answers2024-04-27

211 Project Encyclopedia.

In order to meet the challenges of the world's new technological revolution and face the 21st century, the 211 project is China's leading government and the local forces in all aspects, focusing on the construction of about 100 institutions of higher learning and a number of key disciplines and majors in phases and batches, and by the year 2000, there will be a great improvement in the quality of education, scientific research, management level and school-running efficiency, and there will be significant progress in educational reform, and strive to have a number of institutions of higher learning and disciplines at the beginning of the 21st century. The major is close to or has reached the level of a world-class university. The "211 Project" is the largest key construction project in the field of higher education officially approved by the state since the founding of the People's Republic of China, a development project of higher education during the period of the Ninth Five-Year Plan, and a systematic reform project of higher education. >>>More

16 answers2024-04-27

The basic requirements for binding are on.