1. Land use certificate (Land Bureau).
2. Construction land planning permit (Planning Bureau).
3. Construction drawing design for the record (Construction Bureau, including fire protection, lightning protection, sewage discharge, energy saving, etc., there are many certificates).
4. Construction permit (Urban Renewal Bureau).
5. Housing pre-sale certificate (housing management office).
There must also be qualification approval, and the qualification is different in grade, you can go to the construction committee to find out. And, if you want to do it, you should first seek help from a professional in this area.
-
1. Project approval document.
2 Feasibility study.
3 Environmental assessment.
4. Land use right certificate.
5. Planning permit for construction land.
6 Business License.
7. Organization ** certificate.
8. Tax registration certificate (national tax, local tax).
9. Construction project planning permit.
10 Geological survey.
11 Drawing Design.
12 Drawing review (planning).
13 Fire Review.
14. Bidding (supervision, construction).
15. Project supervision (quality inspection station).
16 Construction Permits.
Now some of these ** in the centralized office can also be handled in a centralized manner not as fast as before running around for a few years to help the first now do these in some areas can be done in 30 working days A little advice.
-
1. The procedures that the construction unit needs to go through are as follows:
1. Construction project planning permit (including attachments);
2. Construction project commencement review form;
3. Construction permit for construction projects;
4. Notice of inspection of the red line of the building issued by the planning department;
5. In the designated supervision agency to handle the specific supervision of the business procedures;
6. Design drawings and design documents reviewed and approved by the construction administrative department;
7. The certificate of the lead bureau for the review of construction drawings of construction projects;
8. Minutes of drawing review;
9. Construction contract (copy);
10. Original data such as leveling points and coordinate points;
11. Engineering geological survey report and hydrogeological data;
12. Power of attorney of the representative of the construction unit on the construction site;
13. The agreement signed between the construction unit and the relevant departments.
2. The procedures that the construction unit needs to go through are as follows:
1. Construction enterprise qualification certificate, business license and registration number;
2. National enterprise grade certificate and credit rating certificate;
3. Safety qualification examination and accreditation certificate of construction enterprises;
4. ** certificate of enterprise legal person;
5. Quality system certification;
6. Laboratory qualification certificate of the construction unit;
7. Project pre-bidding document and project bid price schedule;
8. Qualification certificate and employment certificate of project manager, chief engineer and management personnel;
9. A copy of the examination form and the employment certificate of special types of personnel in construction projects;
10. Review records of leveling points and coordinate points provided by the construction unit;
11. Submit for review and approval of construction organization design, and design plan of construction organization;
12. Construction site quality management inspection records;
13. Report on the commencement of construction projects.
The first thing to do is the construction organization design, company qualifications, relevant management personnel certificates, laboratory qualifications, and construction permits, and construction reports.
Legal basis] Construction Law of the People's Republic of China
Article 7 Before the commencement of the construction project, the construction unit shall, in accordance with the relevant provisions of the State, apply to the people's construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department.
-
Legal analysis: 1. Comply with national industrial policy, development and construction planning, land policy and market access standards. 2. The approval, approval or filing procedures have been completed.
Among them, the feasibility study report has been approved for the first-class investment project that implements the approval system, and the preliminary design and budget estimate have been approved for the project that needs to be approved; Enterprise investment projects that implement the approval system have been approved and the project application report has been approved; The filing procedures have been completed for enterprise investment projects that implement the record-filing system. 3. The site selection and layout of the project in the planning area must conform to the urban and rural planning, and the relevant planning permission procedures shall be handled in accordance with the relevant provisions of the urban and rural planning law. Among them, industrial, commercial, tourism, entertainment and commercial residential and other operational investment projects should be obtained by way of bidding, auction or transfer of hanging rock banquet cards in accordance with the law.
5. The examination and approval of environmental impact assessment has been completed in accordance with the provisions of classified management and hierarchical examination and approval of environmental impact assessment of construction projects. 6. The energy-saving assessment and review of fixed asset investment projects have been completed in accordance with the regulations. 7. Before the start of the construction project, the construction unit has obtained the construction permit or commencement report in accordance with the relevant provisions of the Construction Law, and has taken specific measures to ensure the quality and safety of the construction project of the investment project.
8. Comply with other relevant requirements of national laws and regulations.
Legal basis: Article 7 of the Construction Law stipulates that before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the state, apply to the construction administrative department of the people's ** at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department.
Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit.
-
To start an engineering company, you should have the following documents:
Construction land planning permit, land use nomadic family certificate, construction project planning permit, project commencement permit, commercial housing pre-sale permit.
The following conditions are met to apply for a planning permit for construction land:
1. Fixed asset investment license issued by the planning department;
2. For construction projects in urban planning areas, the construction project site selection opinion, construction land planning permit and construction project planning permit have been obtained;
3. There are construction drawings and technical data to meet the construction needs;
4. Specific supervision business procedures handled by the designated supervision agency;
5. The design drawings and design documents reviewed and approved by the construction administrative department;
6. Construction drawing review and filing certificate for construction projects;
7. Minutes of drawing review;
8. Construction contract (copy);
9. Original data such as leveling points and coordinate points;
10. Engineering geological survey report and hydrogeological data;
11. Power of attorney of the resident representative of the construction unit;
-
The conditions for the commencement of general construction projects include the following: 1. Documents, approvals, and aspects: 1) The construction drawings have been reviewed (it is now stipulated that the drawings shall be reviewed by a third-party enterprise with drawing review qualifications) and stamped with the approval seal; In addition, the design unit, the construction unit, the supervision unit, and the construction unit shall review and disclose, and the drawing review record has been countersigned, sealed, and sent to the relevant unit; 2) The contract or agreement has been concluded (although the construction law.
, but the contract documents must be available when applying for a construction permit); 3) Construction Permits for Construction Works.
has been handled, collar high as to take (there is a construction unit to handle, the construction unit to cooperate); 4) The three-material indicators or physical objects have been implemented; 5) Construction organization design (or construction plan.
has been prepared and approved; 6) The construction drawing budget has been prepared and approved, and the construction funds are well prepared; 2. In terms of work sites and facilities: 1) Temporary facilities, sheds, construction roads, construction water, and construction electricity have been basically completed; 2) Tower crane.
Formwork, steel processing machines and other equipment are basically ready; 3) The engineering positioning survey has a number of troubles; 4) Others: materials, finished products, semi-finished products and process equipment can meet the requirements of continuous construction. Temporary facilities can meet the needs of construction and life; The construction machinery can be overhauled to ensure normal operation; The labor force has been mobilized to meet the needs of the construction, and the safety and fire-fighting equipment has been prepared.
The legal basis is the Building Act.
-
1. The construction unit needs to handle the failure: 1. The construction project planning permit (including attachments); R2. Construction project commencement review form; 3. Construction permit for construction projects; 4. Notice of inspection of the red line of the building issued by the planning department; 5. Specific supervision business procedures handled by the designated supervision agency; 6. Design drawings and design documents reviewed and approved by the construction administrative department; 7. Construction drawing review and filing certificate of construction project; 8. Minutes of drawing review; 9. Construction contract (copy); R10, leveling points, coordinate points and other raw materials; 11. Engineering geological survey report and hydrogeological data; 12. Power of attorney of the representative of the construction unit on the construction site; 13. The agreement signed between the construction unit and the relevant departments. Second, the construction unit needs to handle:
1. Construction enterprise qualification certificate, business license and registration number; 2. National enterprise grade certificate and credit rating certificate; 3. Safety qualification examination and accreditation certificate of construction enterprises; 4. ** certificate of enterprise legal person; 5. Quality system certification; 6. Laboratory qualification certificate of the construction unit; 7. Project pre-bidding document and project bid price schedule; 8. Qualification certificate and employment certificate of project manager, chief engineer and management personnel; (The above information is a copy) 9. A copy of the examination form and the certificate of employment for special types of personnel in construction projects. (Safety officers and electricians must hold double certificates of construction industry and labor department) 10. Review records of leveling points and coordinate points provided by the construction unit; 11. The construction organization shall submit for review and approval of the design and the construction organization design plan; 12. Construction site quality management inspection records; 13. Report on the commencement of construction projects.
The first thing to do is the construction organization design, company qualifications, relevant management personnel certificates, laboratory qualifications, and construction permits, and construction reports.
-
The conditions that should be met for the start of the project are: the construction unit has gone through the construction permit and project quality supervision and registration procedures; The project Liang Zao Department has been set up with management personnel; Preparation and approval of construction drawings; Signing of the construction contract; The traffic roads inside and outside the venue have been repaired; Construction machinery and equipment have entered the site; And after maintenance, it can operate normally.
Construction Law of the People's Republic of China
Article 7. Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the state, apply to the construction administrative department at or above the county level where the project is located to obtain a construction permit;
However, the exception is for minor works below the limit determined by the construction administrative department. In accordance with the authority and procedures specified in the first place, the construction project reported by the excavation engineer shall be approved, and the construction permit shall not be obtained.
Construction Law of the People's Republic of China
Article 9. The construction unit shall start construction within three months from the date of receipt of the construction permit. If the construction cannot be started on time for any reason, it shall apply to the issuing authority for an extension;
Extensions are limited to two periods of not more than three months each. If the construction does not start and does not apply for an extension or exceeds the time limit for extension, the construction permit shall be revoked by itself.
1.Application Form for Construction Enterprise Qualification signed by the legal representative of the enterprise and electronic documents; >>>More
Article 8 of the Marriage Law stipulates that a man and a woman who wish to marry must register their marriage in person at the marriage registration office. Where the provisions of this Law are met, they shall be registered and a marriage certificate shall be issued. Obtaining a marriage certificate establishes the relationship between husband and wife. Where marriage registration has not been completed, the registration shall be re-registered. >>>More
Bring your ID card and bank card from the corresponding bank. Then go to get the number and line up. Tell the counter what business to handle. They will take care of it.
Procedures for file transfer:
1) If the file is in an organ, institution or other provincial or municipal unit, the unit shall issue a letter of business adjustment, and I shall go through the file adjustment procedures; >>>More
Driver's license, driving license, compulsory traffic insurance, environmental protection.