The reason for the slow drying of the hot melt marking after construction

Updated on society 2024-05-13
3 answers
  1. Anonymous users2024-02-10

    1. The ambient temperature specified in the standard is 23. The drying time of the hot melt marking line is 23 degrees, not more than 3 minutes. If the ambient temperature is greater than this, the drying time should be extended accordingly.

    2. High pavement temperature: After the construction of the hot-melt marking, due to the high temperature of the pavement, the asphalt pavement is hot in summer, and the temperature is as high as 60 degrees. This phenomenon is generally prone to occur during the noon time period (around 11 am to 16 pm).

    In particular, the double yellow line in the middle of the road surface is particularly serious. Because the sunshine hours in the middle of the road are long, the heat dissipation is slow.

    3. The problem of the marking coating itself, the use of resin, wax and other raw materials with low softening point and the use of white oil will also slow down the cooling process of the hot melt marking line, and the marking line will be soft.

    4. Adding excessive leveling agents and other additives and things to improve leveling to reduce the cost of the coating will also reduce the softening point of the marking coating, and will also make the hot melt marking slow to dry and the marking line soft.

    To sum up, the first thing to pay attention to in the construction of hot melt marking is to choose the hot melt coating produced by regular manufacturers that meets the national standards.

  2. Anonymous users2024-02-09

    There are many factors that affect the drying time of hot melt marking construction, there are reasons for the coating itself, there are also reasons for construction, the softening point of the resin is relatively low, it is easy to lead to a long drying time, too many additives are added to slow down the drying, and the ambient temperature is too high when it will also affect the drying and forming of the marking. --Land Rover Traffic Hot Melt Marking Coatings.

  3. Anonymous users2024-02-08

    What causes the hot melt marking coating to not dry after application? Hello pro 1The ambient temperature of the hot melt marking specified in the standard is about 23.

    This is something that many people understand. The drying temperature of the hot-melt marking coating is about 23 degrees, and it can be dried in about 1 minute. 2.

    High pavement temperature: After the construction of hot-melt marking coating, due to the high pavement temperature, the asphalt pavement oil temperature rises in summer, and the temperature may be as high as 60 degrees at noon. When the temperature of the hot melt coating drops to about the same level as the road surface, the material is difficult to cool and therefore dries slowly.

    It is worth mentioning that the double yellow line in the middle of the road has a higher chance of this happening. Because of the long sunshine in the middle of the road, the temperature is naturally higher than in other places where the heat is dissipated. 3.

    Problems with the hot melt marking coating itself. Adding too much leveling agent and other additives to improve leveling to reduce coating costs, and a lower softening point of the paint can also affect its drying time.

Related questions
7 answers2024-05-13

It is recommended that you read the instructions carefully.

4 answers2024-05-13

This benevolent brother put the construction disclosure on the bottom, and he finished his business.

11 answers2024-05-13

The cleanser you are using is too dry. You're already severely dehydrated, and now you need to hydrate quickly, and I don't know what price you can accept. I think it's a low-end product. >>>More

34 answers2024-05-13

Recently, sudden peeling may be the cause of dryness, mild acne, can not be excessively exfoliated, use toner immediately after washing and drying your face, and then use moisturizer, it should improve quickly, and moisturize after cleansing at night.

8 answers2024-05-13

The post-pouring belt is a temporary construction joint.

In order to prevent the harmful cracks that may occur in the cast-in-place reinforced concrete structure due to temperature and uneven shrinkage in the building construction, in accordance with the requirements of the design or construction specifications, temporary construction joints are left at the corresponding positions of the foundation bottom plate, wall and beam, and the structure is temporarily divided into several parts, and after the internal shrinkage of the components, the concrete of the construction joint is poured after a certain period of time, and the structure is connected into a whole. The pouring time of the post-pouring belt should be selected when the temperature is low, and the cement can be poured or the concrete mixed with a trace amount of aluminum powder in the cement, and its strength grade should be one level higher than the strength of the component, so as to prevent cracks between the new and old concrete, resulting in weak parts. The location of the post-pouring belt should also consider the different consumption factors of the template and other measures. >>>More