Self built houses are plastered or slotted first

Updated on Three rural 2024-05-13
3 answers
  1. Anonymous users2024-02-10

    Slotted first, plastered together so that it is not easy to leave marks.

  2. Anonymous users2024-02-09

    In the process of home decoration, the decoration of the bathroom is the top priority, and the bathroom is used frequently in our daily life. Let's share with you the details of water and electricity renovation in bathroom decoration.

    1. Waterway design:

    1. It is necessary to install a faucet in the bathroom, and it is necessary to choose the best one, as well as the washing machine;

    2. A mop pool is designed for the bathroom;

    3. Pay attention to the water inlet and outlet when installing the water heater in the bathroom;

    4. The interface of the toilet in the bathroom;

    5. The basin of the bathroom, as well as the hot and cold water interface;

    6. Two floor drains need to be installed in the bathroom.

    2. Circuit Design:

    1. In the early stage of circuit transformation, reserve a socket next to the toilet;

    2. Install a socket next to the basin in the bathroom for later use;

    3. The main light of the bathroom and the switch of the exhaust fan are designed outside; There is also a washing machine that needs an outlet;

    4. The bathroom waterway is generally on the top, and the hot and cold water pipes should be separated.

    3. Toilet waterway:

    In the design of the water pipes, the hot water pipes replace the cold water pipes.

    Hydropower renovation is a hidden project, which must be done at one time, otherwise there will be endless troubles in the future, and maintenance is also very troublesome. The waterproofing of the bathroom must be done well, which will affect not only your own home, but also your neighbors.

    In the renovation of the bathroom waterway, it is better to go to the top than to go to the ground, so that even if there is a problem in the future, it is convenient to repair. The water pipe can be stitched and hidden when the bathroom ceiling is suspended, without affecting the appearance.

    4. Other precautions:

    1. Angle valves should be installed on the basin and toilet pipes of the bathroom;

    2. When installing other sanitary ware in the bathroom, the wires and water pipes of the wall should not be damaged;

    3. When installing an exhaust fan in the bathroom, a ventilation pipe must be installed;

    4. The switch of the bathroom is still installed with a protective cover;

    5. After all the pipes in the bathroom are installed, they should be suppressed, and there should be no image of water leakage; There are also bathrooms that should be waterproof;

    6. The floor drain in the bathroom should be tested to keep the flushing smooth;

    7. The space of the bathroom is small, and the washing machine can be placed on the balcony;

    8. The floor drain in the bathroom should be cleaned frequently and kept clean.

    9. The door of the bathroom should be designed with a threshold stone to avoid water invasion of the wet floor in the bathroom;

    10. The lamps and lanterns in the bathroom are still anti-fog and waterproof energy-saving lamps, which are more practical;

    11. Mixed faucets should be installed in the bathroom, so you don't have to worry about hot water in winter;

    12. Choose a high-power exhaust fan in the bathroom.

    Disclaimer: Some of the **** in this article is used in part of "Oriental IC", and any newspaper, newspaper, television station, company, organization, or individual may not use it in part or in whole without the permission of Oriental IC. Other **** networks, if they involve infringement, please contact the author to deal with and delete.

  3. Anonymous users2024-02-08

    As we all know, water and electricity grooving and plastering are two indispensable construction links in home decoration. So the question is, do you know whether to plaster or slotting first? What should be paid attention to in the process of hydropower slotting? Next, let me reveal the answers for you one by one.

    This needs to be on a case-by-case basis. If you choose the topline, it is plastered first, and then the water and electricity are slotted. Of course, if you choose a dark line, it will naturally be slotted first, followed by plastering.

    However, I personally think it's better to choose the open line, because it is convenient to repair when there is a problem in the future. Cavity.

    What matters need to be paid attention to in the process of hydropower slotting construction.

    1. The reason why a small arc is to open a small arc on the wall is that it can prevent the phenomenon of dead end in the line.

    2. For the arc groove connected to the wall and ground, the larger the arc, the greater the bend, so that the shape will be more regular, which is not only convenient in the process of floor heating construction, but also does not need to be cut when laying the insulation board.

    3. In the process of wall slotting, you need to pay attention to the size. If you count from the ground, the height should be between 60 and 90 centimeters, and the depth must be about 4 centimeters. After the trunking is opened, the size and position of the grooved pipe must be recorded to avoid the need to change it later.

    What principles need to be adhered to in hydropower slotting.

    1. Horizontal and vertical.

    Usually in the process of wall slotting, the principle of "horizontal and vertical" should be observed, and in the process of hydropower construction, in order to avoid water leakage caused by breaking the water pipe or wire leakage, the hydropower construction drawing should be kept, because it will be used in the process of hydropower maintenance in the future.

    Second, the spacing is reasonable.

    In addition, there needs to be a certain distance between the cold water and hot water pipes in the bathroom, because if you are too close to each other, you will lose heat from the water pipes.

    Summary: After reading the above introduction, I believe you have a further understanding of whether plastering or hydropower slotting first. If you need to know more about it, please continue to ******, and more exciting content will be presented to you in the future.

Related questions
9 answers2024-05-13

Looking for Jiuqi Architectural Design Company, the design and construction are all inclusive, the professional team, the quality is also guaranteed, and the first is also reasonable. Just prepare the homestead, and leave the rest to Kusu Architects.

18 answers2024-05-13

Generally speaking, only those who have deposited the housing provident fund can apply for a housing provident fund loan, even if it is a rural household registration, as long as their unit pays the housing provident fund, then they can apply for a housing provident fund loan. The conditions for applying for a housing provident fund loan are: 1. The borrower must have a permanent urban residence or valid residence status in the city; 2. Push forward from the date of application, and pay the housing provident fund in full for more than 12 consecutive months (only one person is allowed to take out a loan if both husband and wife have paid the provident fund); 3. There are contracts (agreements) and related materials for purchasing, building and overhauling self-occupied houses in accordance with the law; 4. Have a certain proportion of self-raised funds. >>>More

5 answers2024-05-13

The transfer of ownership can be carried out, but it must be approved by the village committee and the county-level real estate management department, and the buyer must also be the collective, and the transfer must be announced at the location of the house. >>>More

10 answers2024-05-13

If you want to ventilate your own house, then you should add a window to every house. In this way, the house can be particularly breathable and quite comfortable.

7 answers2024-05-13

It is decided on a case-by-case basis. If the rural house is built in the middle of a house and the height is not prominent, there is no need to set up a separate direct lightning strike facility, and only need to install a lightning arrester or surge protector at the power inlet of the house to avoid lightning and high voltage along the power line into the house equipment. >>>More