Hello, I would like to ask about the details of the PLM module, can you tell me about it?

Updated on amusement 2024-05-18
5 answers
  1. Anonymous users2024-02-10

    There are the following modules:

    1.Document management.

    2.Process management.

    Document approval process, change process, corresponding process cycle configuration, and permission management in the process.

    3.Image file management.

    CAD and CAM file uploading, version management, distribution, storage, permission management.

    Manage. Parts, Assemblies Management, BOM Structure, Configuration Management.

    5.Project management.

    6.Collaborative management.

    Each functional module works together, information association operation, remote collaborative design, and office software collaboration, which can also be called interconnection with OS.

    7.Permissions management.

    Organization, role, user, group management.

    8.System integration.

    Integrate with CRM, ERP, MES and other systems, and reserve APIs to develop functional requirements according to enterprise needs.

  2. Anonymous users2024-02-09

    The PLM module of Siemens (Siemens) includes demand collaboration, enterprise collaboration, engineering collaboration, manufacturing collaboration, project collaboration, community collaboration, and visual collaboration.

  3. Anonymous users2024-02-08

    The main functional modules of the PLM system are: 1. Data managementData management can be called product data management (PDM), which saves all the information of the product definition. From these central warehouses, the enterprise manages various workflow management related to R&D and production, and the workflow management of the PLM system is the collaborative design of tooling products and the management of the manufacturing process.

    This module summarizes the start and end conditions of the process, the various steps of the process, the rules for the transfer of information between the steps, and the required application tools. 3. The project management of the project management PLM system includes continuous process activities such as planning, organizing, testing and controlling in all aspects to achieve the project objectives. 4. In order to play the greatest role in the integrated management PLM system, it needs to work with other software, which is what we often call integration.

    The most common integrations are with ERP and CAX systems, which can be managed at a more granular level because each software has a different focus. 5. Permission management of PLM system means that the system presets some access policies. The access policy is the hub between the subject and the object, and the main control system is the operation authority of all subjects in the system to ensure the absolute security of enterprise information resources.

  4. Anonymous users2024-02-07

    PLM is an English abbreviation that has two meanings, one is for Product Lifecycle Management (PLM), and the other is for Pour le Mérite.

    Introduction to PLM.

    Product Lifecycle Management.

    According to the definition of CIMdata, PLM is a series of application solutions that support the creation, management, distribution and application of information throughout the product life cycle within the enterprise, scattered in multiple locations, and between enterprises with collaborative relationships in the field of product development, and it can integrate human resources related to the product.

    Product lifecycle management.

    Processes, applications, and information. PLM encompasses the following:

    foundational technologies and standards (e.g., XML, visualization, collaboration, and enterprise application integration);

    Tools for information creation and analysis (e.g., mechanical CAD, electrical CAD, CAM, CAE, computer-aided software engineering CASE, information publishing tools, etc.);

    core functionality (e.g., data warehousing, document and content management, workflow and task management, etc.);

    application functions (e.g., configuration management, recipe management, compliance);

    Solutions and consulting services for business industries (e.g. automotive and high-tech industries).

  5. Anonymous users2024-02-06

    Literally, PLM (Product Lifecycle Management) is the whole life cycle of a product.

    BAI management, that is, the information management of the whole cycle from design and production to scrapping. PDM (Product Data Management) is DAO product data management, which mainly refers to the data management of product design, including product BOM management, ** file management, change management, configuration management, product structure management and other functions.

    In a general sense, the PLM system includes: design data management, process management, production management, warehousing and logistics management, financial management, customer management, after-sales service management, etc., for these modules, the software names provided by different companies are also different.

    This is a little bit of my own understanding, I hope it helps you.

Related questions
33 answers2024-05-18

Matter can be created by itself, but spirit, by whom? How good is it to find someone you love and live your own little life? Even if it is coarse tea and light rice, it is enough to have loved ones by your side. Hope!

6 answers2024-05-18

After the completion of a project, the project settlement must be carried out (the project settlement includes economic analysis). The main profit of a project is the total settlement price minus the costs incurred in the project (including taxes and fees paid by policies). Whether you can make money is normal is to make money absolutely, but how much you earn depends on whether the project management is in place, first, the personnel management costs, and whether the personnel involved in the project construction can play their due benefits; The second is material management, materials can not be wasted in construction, try to make the best use of materials, can not appear large materials, good materials are not used, and improve the material turnover rate; Serious material planning, reduce the backlog of materials and the second on-site reversal or untimely materials caused by the phenomenon of nesting, increase unnecessary expenses. >>>More

5 answers2024-05-18

An electrician is a worker whose work is related to strong electricity.

8 answers2024-05-18

It can't be used. The use of 380 on 220 will not burn.

However, 380 is to be connected to 3-phase four-wire, 220 is 2-phase, and the wiring is different. >>>More

5 answers2024-05-18

After the cognitive network, the dexterity of the fingers increases. >>>More