-
The general procedure for the inspection of information (from the entry of the site to the completion of the project).
1. The construction organization design (plan) is submitted for review.
2. Drawing review record.
3. Technical (safety) disclosure.
4. Commencement report.
5. List of management personnel.
6. All kinds of materials for inspection.
7. Design changes.
8. On-site visa.
9. Concealed inspection.
10. Inspection batch inspection.
11. Sub-project inspection.
12. Submit for inspection of branch projects.
13. Unit engineering inspection.
14. Completion report.
6-8 of them are interspersed throughout the construction process of the project.
1) At the beginning of the entry.
The engineering and technical documents are submitted for review and the construction organization design is attached.
Subcontractor Qualification Application Form Attached to the Enterprise Qualification.
List of project management personnel with copies of qualification certificates.
Go through the entry procedures with Party A and sign a security agreement.
Internal information. Organize the list of construction team personnel.
Attach a copy of your ID card and a copy of your special work certificate.
Carry out on-site and written safety and technical disclosure and archiving to the construction team.
Technical information. The drawings approved by the design are archived as the basis for construction.
Archive changes to drawings at any time).
Notice of bidding in the bidding documents of the project contract and the contract of the construction team.
Sign an agreement with the construction team as necessary to supplement the contract and archive it, and require Party A to provide a written disclosure of the control line and the technical disclosure of the installation and archive.
2) Material entry.
Engineering materials entry inspection form.
Attached internal information such as inspection records, product certificates, and test reports of materials and components.
The bills, time, and quantity of the materials entering the site, the product certificate and test report of the materials recorded by the handler shall be timely recourse and the validity of the supporting documents (such as the time of issuance, the time of time, and whether there is a seal of the unit).
Engineering installation inspection.
The project sample is submitted for inspection.
If required, you can make your own ** to indicate the location, inspection content, time and other sub-division project construction inspection form.
Attach the inspection records of concealed projects, inspection batch quality acceptance records and other handover inspection records as required.
Conduct tests and inspections with units related to the upper and lower processes.
Three-sex testing, pull-out test, flaw detection, glue compatibility test, etc. According to the requirements of the selection, by Party A selection, sampling.
Internal information. Construction schedule.
Material incoming plan.
Staffing plan.
Implement approach plan.
Pilot testing plan.
Information Verification Plan.
Construction logs. 4) Engineering economic and technical documents.
Project negotiation changes, records of sending and receiving documents, ** orders, quotation lists, archiving drawings and drawing changes archiving.
5) Construction logs.
It includes weather changes, construction content progress, safety management content, and the occurrence of important events.
6) Completion of the project.
Completion data collation will not be described in detail for the time being.
The final accounts of the project and the final accounts of the construction team.
Handover of works. Project summary.
Found from the web. Forgot about **).
-
There is a lot of information from the start of construction to the completion of the project, and I suggest that you go to a local construction data clerk to read it through.
-
A lot of things, but I guess no one will tell you, find a master or find someone else to finish it.
-
I've been studying for a month, and I feel that I've learned almost the basics, so I can communicate with them when I have time. You watched people fight a lot, but in fact, you can't understand it. It's very messy, you have to have someone to point you out, so you can understand it, hehe
-
It is advisable to understand and use the Broad Matrix (Quality and Safety).
The tools used by the data clerk include all quality and safety ** information.
-
Sent, pay attention to check, and give points!
-
First, the attention of the review is the certificate of entry of raw materials, inspection report, manufacturer's qualification, etc., as well as the double-entry report after entering the site. The inspection includes the concealed works of each part of the building when the construction begins, and the construction of each part. All need to be inspected.
Second, the difference between the inspection form and the examination form:
1. The inspection form is attached to the front, steel processing and installation, concrete, cast-in-place structure and so on every time the inspection is approved.
2. Application form, such as construction organization design review, material review, construction positioning and pay-off review, etc.
-
Since you are also doing engineering, then you have a contract, and you can apply for inspection in accordance with the requirements of the contract. If it is submitted for review, it means that the additional materials and equipment and the amount of work generated that are not in the contract will be added, and the additional contract will be signed after approval. Engineering sub-items - weak current can be further divided into:
Data, voice, CCTV, public address system and overall decoration system of the computer room.
-
1. Application form for inspection of concealed projects.
The attachment to the application for inspection of the concealed engineering of the foundation groove shall be submitted:
Foundation investigation report.
The "Foundation Groove Inspection Record" signed by the representatives of the construction, supervision, survey and construction units
When the actual foundation is inconsistent with the survey report, the treatment plan signed by the survey, design, construction, supervision and other parties involved in the investigation and the inspection record implemented according to the treatment plan shall be submitted before the application for inspection can be carried out. After approval, the pouring of cushion concrete is carried out in the next process.
Application form for inspection of steel bar binding project.
The attachment should indicate the number of the A9 form and the attached steel bar factory certificate and retest report;
If there are welded joints, the steel joints should be inspected first;
If there is a requirement for earthquake resistance, the "strong yield ratio" and "super strength ratio" of the steel bar should be calculated according to the seismic grade of the engineering structural parts.
When the first and second seismic grades, the "strong buckling ratio" of the steel bar should be. When it is a first-class seismic grade, the "super strength ratio" of the steel bar should be, and when it is the second-level seismic grade, the "super strength ratio" of the steel bar should be;
Quality assessment form of steel bar binding sub-project;
The concealed acceptance record of the project signed by the supervisor.
In addition to the above requirements, the concealed acceptance of the superstructure reinforcement should also be added to the approved formwork support scheme and the formwork engineering quality inspection and evaluation form.
Balcony, canopy and other cantilevered components, should be filled in separately one by one concealed engineering acceptance records, multi-storey buildings can be attached to a single concealed record centralized form for inspection.
2. Application form for positioning and pay-off inspection.
"Engineering Surveying Positioning and Pay-off Review Record" and "Construction (Structure) Engineering Survey Review Form" should be attached, and both forms should be signed by on-site professional supervisors;
In addition to the positioning and pay-off inspection of the overall project and the unit project, the pay-off size check specified in the masonry construction acceptance specification is also filled in this form for inspection.
-
The construction inspection form is used in the project summary, and the application form is used in the usual data inspection.
-
The application form for inspection is the application for approval of the inspection batch of ordinary steel bars, formwork, concrete, cast-in-place structures, etc.
The sub-project construction inspection form is the acceptance and approval of the sub-project project.
-
1. The application form for inspection of sub-projects and sub-projects is used for inspection of sub-projects and sub-projects, such as sub-projects and sub-projects are divided according to the "Unified Standard for Acceptance of Construction Quality of Construction Projects" GB50300-2001 Appendix B, such as foundation and foundation, main structure, building decoration, etc.
When the sub-project and sub-project information are complete, it should be reported to the supervision unit, and the sub-project and sub-project inspection application form will be reported to the superintendent.
2. The latter application form is used for inspection and inspection of batch projects. The inspection batch is a project under the sub-project, such as after the installation of a certain layer of reinforcement, it is an inspection batch, when this layer of reinforcement is installed for inspection, this is used.
Application Form for Pile Foundation Project Inspection.
01 inspection and acceptance records of concealed steel cage engineering; >>>More
Employee training should include four aspects: will training, cognitive training, vocational training, and skills training. The details are as follows: >>>More
The content includes flowers and birds, fat children, golden roosters, spring cattle, myths and legends and historical stories, etc., expressing people's desire for a bumper harvest and their longing for a happy life, with strong national characteristics and local flavor. >>>More
Water saving tips micro animation.
1) Meta tag optimization: for example: title, keywords, description, etc. >>>More