As long as it is properly maintained, it is not easy to block, and the method is as follows:
Before using the new pump, drain the pipes with water and drain the water in the bucket;
Hit a little thinner mortar, then concrete;
The stone should not be more than two centimeters larger;
After the operation, the pump truck pipeline should be cleaned: first pump back all the concrete, pump it into the bucket to clean it, and then flush the pipeline with normal water.
-
Small fine stone concrete pump Precautions in the process of pumping concrete pumping:
1.Small fine stone concrete pump In the process of pumping, if the concrete pump needs to be connected to the conveying pipe with a length of more than 3m (including 3m), it should still be wetted and lubricated with water and cement slurry or cement mortar in advance.
2.Concrete pump In the process of pumping small fine stone concrete, the concrete in the removed conveying pipe shall not be scattered in the unpoured place.
3.When the concrete pump small fine stone concrete pump has the pressure rise and instability, the oil temperature rises, the conveying pipe obviously vibrates and other phenomena and pumping is difficult, it shall not be forcibly pumped, and the cause should be immediately identified, and measures should be taken to eliminate. You can first use a mallet to hit the elbow, conical pipe and other parts of the conveying pipe, and carry out slow pumping or reverse pumping to prevent blockage.
Murong Machinery pours the special equipment for the pouring of the small concrete pump manufacturer of the secondary structural column, the special equipment for the pouring of the structural column, the design is exquisite, the mobile aspect, can be poured on the floor on the spot, the operation is simple and easy to use, and it is a good product for the pouring of the structural column. It is suitable for fine stone concrete transportation of super high-rise buildings, and the transfer pump of the secondary structural column of the group construction column of the building floor. It is widely used in some special construction environments such as:
The construction of railway and highway tunnels, diversion tunnels, culverts, mine tunnels, bridge tunnels and other tunnels also includes water conservancy projects, hydropower projects, slope support, underground construction operations, foundation filling projects, and pouring of large group buildings. This product adopts hydraulic slurry feeding, vibrating mesh filtration double cylinder reciprocating operation can fully transport all kinds of mortar, fine stone concrete, etc. in construction applications, this product has the characteristics of large displacement, high pressure, labor and material saving, flexible movement, etc., is an ideal mortar conveying equipment.
-
Here are three things you can try:
1. Repeat the positive-reverse pump operation, gradually suck the concrete mixture at the blocked place back to the hopper, and then pump it normally after re-mixing;
2. Find out the blockage position, loosen the concrete at the blockage with a mallet, and then eliminate the blockage through the positive-reverse pump operation;
3. If the above two methods are not feasible, the conveying pipe of the blockage can be removed after the pressure relief of the secondary structure conveying pump, and the concrete blockage can be removed, and then the takeover is re-pumped.
-
The tip of the tube should also be filled with butter once a day. Butter should be filled into the butter nozzle at the upper end of the swing cylinder, and dilute should not be used.
Loosen the mother first, adjust to an appropriate amount, and then lock the lock nut tightly, and when it works normally, continue to work after adding concrete to prevent pipe blockage. And the concrete must be mixed evenly and then put into the hopper, and then press the "pumping start and stop" (the pumping start and stop is to control the machine to beat the material outward), turn on the power switch after the power is turned on, and be sure to wait for the solenoid valve to relieve the pressure before proceeding to the next step, on the contrary, reduce and add butter.
Put in clean water to rinse the pipe.
Answer: 9 5 means 9 times 5, which can be written as 9 5, which is no problem, but the landlord's understanding behind has been deviated. >>>More
Secondary drainage is an effective step to prevent water seepage and leakage operation, which is different from ordinary waterproof operation, more tight, and reduces the trouble of later maintenance. >>>More
Secondary structure. There are two types of reinforcement depth: >>>More
If p is no longer on a straight line ab, then according to the three-point formula, a parabola must be determined, and now p is no longer on any parabola across ab. >>>More
Quadratic radical. i.Definitions:
A formula of the form ā(a 0) is called a quadratic radical. >>>More