1. First of all, have an overall plan and plan, that is, how much you want to achieve the overall effect and total investment control;
2. Determine the approximate location of furniture and electrical appliances (including sockets in various rooms except kitchens, bathrooms, lamps, TVs, stereos, vacuum cleaners, hair dryers, chargers, etc.);
3. According to the actual needs and the infrastructure of the original house, consider the outlet and entrance of cold water and hot water, such as the location of gas water heaters or electric water heaters, where hot water and cold water need to be sent, where only cold water is needed, the location of the toilet, the location of the bathtub, etc.;
4. Determine the location and number of lighting switches in each room;
5. Determine the position of the TV, and then determine the setting of the TV cable;
6. Determine the demand for network use, and then determine the direction of network broadband cables;
7. Arrange weak current boxes (boxes) in a reasonable position;
8. According to the above requirements, carry out slotted buried pipes and wiring, and after these works are completed, consider the next step, such as wall repair, wall beautification, edging, ceiling, and so on.
That's basically this program.
-
Transfer to the decoration company - set the plan - set ** - sign the contract - start construction - medium - end -
-
Decoration is the first on-site wall lofting, and then the wall, after the wall to wait for the cement sand to dry, the drier the better, and then the water and electricity stakeout, start slotting, and then bury the pipe, wire pipe, and then you can order the air conditioner to start to install, after the installation began to carpenter production, carpentry ceiling, cabinet some wood work, carpentry period is the longest period of work in the home decoration, probably a month wood production is almost good, start the painter to paint, after the brush is the bricklayer to paste the tiles, After pasting, it is necessary to lay the wooden floor, it is best to have some paint tinkering, start to paste wallpaper and baseboards, toilets, shower rooms, lamps, switches and installations, basically has been completed, it is best that you can move your own furniture.
-
Are you looking for a worker to decorate yourself or a decoration company?
If you are looking for a decoration company, the whole process:
Go to the house site for measurement and on-site communication, the designer will go back and carry out the graphic design and some case references**, and finally develop a design plan and budget that fits your own.
Then there is the signing of the decoration contract. Construction - Acceptance - Signing of the warranty contract.
Construction process: plumbers enter the site for construction.
In this regard, it is recommended to strictly rectify the water and electricity horizontally and vertically, so that if you need to punch holes in the wall or ground in the later stage, it is easy to calculate the position of the pipeline. After the waterway is changed, the pressure test must be done, and the pressure will not drop for half an hour, reaching 8-10 pressures. The wires must be national standard wires, lamp wires and socket wires should be at least square, air conditioning wires should be at least 4 square meters, and the kitchen should be thrown a thick line alone, because the power consumption is relatively large.
Carpentry for construction.
This is mainly the modeling of the ceiling and the wall, wardrobes, TV cabinets are recommended to buy finished products, the ceiling can be used light steel keel and wooden keel according to the plan, the plate, if it is to buy e1 level plates for furniture, the market is now E0 level plates are deceitful, you can see it yourself, the highest international environmental protection standard is E1 level. If it is gypsum board modeling, pay attention to the seam of the board at least 3mm of the gap or open the V-shaped groove, thermal expansion and cold contraction·· Not much to explain.
ps: If the furniture is made on site, the panel of the furniture must be brushed with primer after acceptance, otherwise if it is dirty, the dirty thing will be protected by paint.
Bricklayers enter the site for construction.
Before that, the kitchen and bathroom floor must be brushed waterproof (note: it is brushed), the floor is fully brushed with the wall at least 30cm, and the wall of the bathroom shower room must be at least high. After the waterproof brushing, seal the floor drain and store water for at least 24 hours, and then go downstairs to see if there is a water leak.
Tile paving should be wall tiles pressed floor tiles, and joints should be matched. Check whether the paving is qualified standard to touch the four corners of whether it is flat (if the tile itself is not flat, this trick is useless), if the four corners are flat, then the tile paving is qualified.
Painters enter the site for construction.
If there is a suspended ceiling, the painter first goes to the site to carry out the self-tapping anti-rust paint treatment, and then the masking paper at the joints of the plasterboard is pasted.
Furniture and wall base putty treatment, at least twice, sandpaper sanding - paint spraying - wall putty treatment - sandpaper sanding - latex paint spraying.
Before painting, you must protect the scene, otherwise the aerosol paint will be pervasive, and it will be very troublesome to clean in the later stage.
The above are personal opinions, some are not particularly detailed, I hope it can help you.
The content of the poem can be sent out, thank you.
First of all, I suggest that you go to the Northeast cuisine near your home and order a pot of pork, and then look at the ingredients, and one of the answers below is correct.
Uncle Li is the same as "Farewell".
Outside the long pavilion, by the ancient road, the grass is green. >>>More
There are a lot of tricks in life. Of course, how can learning be without tips? Here's a look at my study tips! >>>More
1. When throwing a throw-in, do not leave the ground with both feet, raise the ball above your head, and throw the ball with both hands; >>>More