-
1. When there is ice and snow accumulation on the scaffolding and scaffolding, it should be cleaned before construction, and the frame body should be checked for loosening and sinking at any time, and all workers entering the construction site should wear non-slip shoes during winter construction.
2. Power switches, control boxes and other facilities should be uniformly arranged, locked and protected to prevent indiscriminate pulling of wires, and a special person should be responsible for management to prevent leakage and electric shock. The wires of the frequently moving implements shall not be dragged on the ground, shall not be immersed in water, shall be well insulated overhead, and shall be used in the open air must have rain, snow and moisture-proof facilities.
3. The construction site should eliminate the water accumulation on the site, do a good job of drainage measures, and prevent the on-site construction water from causing the site to freeze, and the construction site should not be stacked near the mechanical and electrical equipment and component stacking site after the snow is cleaned.
4. All mechanical sheds on site should be set up tightly to prevent rain leakage; Mechanical and electrical equipment should take waterproof and floodproof measures; After rain and snow, the power supply line should be inspected to ensure the safety of electricity.
5. Climbing operators (structural construction support erection, foundation pit excavation, steel support installation, etc.) must wear anti-slip shoes, protective gloves and other anti-slip and anti-freezing facilities; Aerial workers must fasten their safety belts correctly as required, and must hang the safety belt hook on a safe and secure object, and it is strictly forbidden to hang the safety belt on the template when installing the template.
6. Due to the cold weather, snow and slippery roads, workers are relatively slow to respond to emergency problems, and operators are not allowed to take risks or operate in violation of regulations, and wear safety helmets as required.
7. Pay attention to anti-frostbite when keeping yourself warm, the appearance is brittle in the cold season, and it is easy to be scratched and bruised; At the same time, the temperature of the dormitory will also be reduced, and it is strictly forbidden to use high-power electrical appliances for heating in the dormitory.
8. Before starting work every day, the team leader should do a good job of safety evaluation before the shift, emphasize to the team operators that the safety of the construction operation of the class should be implemented, and focus on the safety of high-altitude work in rainy and snowy weather.
9. When constructing in an icy place, it is necessary to lay anti-slip grass felt or wooden boards equipped with anti-slip strips, and safety ropes must be worn when working, and the safety ropes are hung high and low, and fixed on a firm fulcrum.
10. The speed of vehicles in and out of the field should be controlled, and the driving distance should be maintained to prevent accidents.
11. If concrete pouring construction is involved, pay attention to adding antifreeze, cover the film after pouring and then cover the straw curtain for insulation, and when the temperature is lower than 5 °, no sprinkling water is allowed to cure; Pay attention to controlling the temperature difference between the inside and outside of the concrete to reduce the cracking of the concrete.
-
1) Before the winter construction, all employees should be organized to learn the knowledge of winter construction safety and fire protection.
2) The new technology, new process and new machine tool adopted should be disclosed to the operator for safety technology such as mechanical performance operation methods.
3) A full-time electrician should be set up at the construction site to install, maintain and manage electrical equipment, and it is strictly forbidden for other personnel to dismantle and modify it at will.
4) Do a good job of on-site anti-freezing and thermal insulation, pay attention to the weather forecast, and pay attention to the impact of windy weather and cold snap attacks on safety production.
5) It is strictly forbidden to use bare wires at the construction site, and the wires should be laid to prevent smashing, rolling and rolling to prevent the wires from freezing in the snow, and after the snowstorm, the power supply lines should be inspected to prevent electric shock accidents caused by broken wires.
6) Use flame retardant insulation materials in winter.
7) When operating electric and gas welding, the fire approval system must be observed, and a special person must be set up to watch the fire, and be equipped with fire-fighting equipment and fire-fighting water.
8) All kinds of chemicals plus congratulatory agents, toxic substances, oil and other combustible materials should be set up in a special warehouse, and a special person should be responsible for management and establish a strict system for receiving and distributing.
9) All kinds of shelves and pedestrian roads should be firm and regularly inspected, and they should be carefully cleaned and inspected after strong winds and snow, so as to eliminate hidden dangers in time.
10) Attention"Three treasures and four mouths"Protection.
11) During the winter period of mu assignment, it is necessary to strengthen the safety disclosure of various types of work, and the content of the disclosure must be pragmatic and detailed.
12) The stove for heating in winter should have perfect chimney and ventilation facilities, strengthen the management system of special personnel to prevent carbon monoxide poisoning and prevent fire, it is strictly forbidden to use electric stoves and other equipment for heating, and after the end of the winter period, organize unified dismantling, and no one shall ignite again.
13) When carrying out roof construction in winter, consider setting up wooden anti-skid strips on the sloped roof, and make a frame around the outer frame to make a walking channel, detail.
1. The concrete ratio should be mixed with antifreeze in proportion in accordance with the relevant national regulations, and its brand must be approved by the construction unit and the supervision unit. >>>More
I'm relying on this one that's too unspecific.
This question is really a bit difficult, I recommend you to look it up on Google!
Sign up for free on the "Tiangong Network".
The harsh winter weather has caused many disadvantages for safe driving. In order to prevent traffic accidents, the following is a summary of some common situations that affect driving safety in winter and how to deal with them for your reference. In winter, car owners are often electrostatic when driving. >>>More