How to deal with fire protection procedures, fire certificate handling process

Updated on society 2024-05-27
4 answers
  1. Anonymous users2024-02-11

    1) Fire safety inspection declaration form;

    Note: You can go to the local fire department portal.

    A copy of the business license or the enterprise name issued by the administrative authority for industry and commerce.

    Notice of Advance Approval;

    3) The fire protection acceptance of the construction project obtained in accordance with the law or the fire protection completion acceptance record.

    Copies of legal documents;

    4) Fire safety system, fire extinguishing and emergency evacuation plan;

    5) Pre-job fire safety education and training records of employees and automatic fire protection system operators.

    A copy of the professional qualification certificate for the specific type of work in the fire protection industry obtained;

    6) Other materials that shall be declared in accordance with law.

    The public gathers who have carried out the filing of fire protection completion acceptance in accordance with the law and have not carried out spot checks on the record.

    If the venue applies for fire safety inspection, it shall also submit the fire protection design for the interior decoration of the venue.

    Engineering drawings, fire product quality certification documents, and fire performance of decoration materials.

    Certificate of compliance with fire protection technical standards and factory certificate.

    The fire department of the public security organ shall accept the application for fire safety inspection in accordance with the relevant provisions of the local administrative license.

  2. Anonymous users2024-02-10

    I don't know what project you want to do, generally go to the local fire brigade to handle it, if the project exceeds the approval authority of the brigade, you have to go to the local fire brigade to handle it. (I don't know if your area is ** online or not, you can go online first to ** the relevant fire approval procedures).

  3. Anonymous users2024-02-09

    A fire permit is also a mandatory certificate in many establishments. The specific process of applying for a fire certificate may vary depending on the region and relevant regulations, and the following are the general steps of the general fire certificate application process:

    1. Determine the eligibility to apply: Understand the requirements and qualifications for a fire certificate in your area, such as whether you need to have specific training or education.

    2. Prepare the necessary materials: Collect the required documents and materials, which may include personal identification, proof of ownership of the site, building drawings, proof of installation and testing of firefighting equipment, etc.

    3. Consult your local fire department4. Fill in the application**: Fill out the Fire Permit Application ** according to the guidance and attach the required supporting documents and materials.

    5. Pay the fee: Pay the applicable application fee as required.

    6. Submit an application7. Audit and inspection: The fire department will review the submitted application and may conduct an on-site inspection to ensure compliance with fire safety standards.

    8. Approval and issuanceIf the application meets the requirements, the fire department will approve it and issue the corresponding fire certificate.

    tips:

    Please note that the above steps are for reference only and may vary depending on the region and regulations. It is advisable to consult with your local fire department or relevant agency for accurate information and guidance when actually handling the procedure.

    Personal experience

    I once helped a children's park apply for a fire certificate. As an entertainment venue, the children's paradise needs to apply for an entertainment business license, which mainly involves the procedures of industry and commerce, taxation, fire protection and health

    1. Indoor children's playgrounds need to apply for fire certificates

    No matter how large the area of the children's park needs to apply for a fire certificate, because the indoor children's park is a densely populated public children's entertainment place, is the key object of fire inspection, and must be opened after fire acceptance.

    2. The fire permit should be handled at **

    Go to the fire brigade of the Public Security Bureau to apply for a fire permit.

    3. The fire approval process for opening a children's park in a shopping mall

    According to the qualified design unit out of the drawings - report to the fire department for approval - out of the audit opinions - according to the audit opinions to modify the drawings - re-submit for review - out of the agreement with the construction opinions - review the original report to the construction unit for archiving - engineering construction - commissioning - completion of the transfer to Party A - professional unit testing - out of the test report - report to the audit unit for acceptance - on-site acceptance - out of qualified opinions - fire inspection before opening - out of agreement to open opinions - opening.

    The shopping mall fire will have a fire protection, the shopping mall will contact the fire audit once before the investment, the shopping mall will officially attract investment, the brand has been stationed, and the official opening will be reviewed once, called the second fire protection.

  4. Anonymous users2024-02-08

    Legal Analysis:1Fill in the "Fire Safety Inspection Application Form", and send it to the local area for places below 100 square meters.

    After the comments are added, the places of more than 100 square meters are directly handed over.

    2.Face-to-face application report (please fill in with an ink pen), a copy of the legal person's ID card.

    3.A copy of the industrial and commercial business license (a new enterprise without an industrial and commercial business license needs to provide a copy of the "Notice of Approval of Enterprise Name Pre-registration" obtained from the industrial and commercial enterprises).

    4.Indoor floor plan and four-set plan of the site (the front and back of the site are arranged around the front and right sides, that is, the outdoor floor plan).

    5.Proof of the site (copy of the title deed) and lease agreement.

    6.Submit the company's fire protection system, fire extinguishing and evacuation plan (self-formulated).

    7.For residential and homestead sites, please apply to the planning department for a change in the nature of use before applying.

    Legal basis: Fire Protection Law of the People's Republic of China

    Article 2 The fire protection work implements the principle of prevention first, prevention and elimination combined, and implements the fire safety responsibility system in accordance with the principle of unified leadership, supervision by the department according to law, full responsibility of the unit, and active participation of citizens, and establishes and improves the socialized fire protection network.

    Article 3 Lead the national fire protection work. Local people at all levels are responsible for fire protection work within their respective administrative areas. The people at all levels should incorporate the fire protection work into the national economic and social development plan to ensure that the fire protection work is compatible with economic and social development.

    Article 4 The emergency management department shall supervise and manage the fire protection work of the whole country. The local people's emergency management department at or above the county level shall supervise and manage the fire protection work within its administrative area, and the people's fire and rescue agency at the same level shall be responsible for the implementation. The firefighting work of military facilities shall be supervised and managed by the competent units, with the assistance of fire and rescue agencies; The fire protection work of the underground part of the mine, nuclear power plants, and offshore oil and gas facilities shall be supervised and managed by the competent units.

Related questions
5 answers2024-05-27

If you want to obtain the qualification certificate, you must first apply to the fire department in the name of the unit, and then wait for the notice to participate in the training courses held regularly.

8 answers2024-05-27

The process of transferring ownership of the house is as follows: >>>More

8 answers2024-05-27

It depends on what kind of place you open a yoga studio, if it is leisure and entertainment, then you must apply for a fire certificate. If it is not an entertainment venue, it does not need to apply for a fire certificate. You can check on the local fire network, all provinces have it, it is written very clearly, those that need to be done, those that are not done, what should I do? >>>More

7 answers2024-05-27

According to the "Regulations on the Supervision and Administration of Fire Protection of Construction Projects", it shall be handled by the construction party.