-
If you want to obtain the qualification certificate, you must first apply to the fire department in the name of the unit, and then wait for the notice to participate in the training courses held regularly.
-
Information and procedures required for applying for a fire certificate: 1. Fill in the "Application Form for Fire Safety Inspection", and go to the local police station for places below 100 square meters to add comments, and submit them directly for places above 100 square meters. 2. Interview application report (please fill in with ink pen) and a copy of the legal person's ID card.
3. A copy of the industrial and commercial business license (a copy of the Notice of Approval of Pre-registration of Enterprise Name shall be provided for newly established enterprises without an industrial and commercial business license). Fourth, the indoor floor plan of the site, four drawings (the outdoor layout of the site is arranged around the front and back, the left and right sides, that is, the outdoor plan). 5. Site certificate (copy of real estate certificate) and lease agreement.
6. Submit the company's fire protection system, fire extinguishing and evacuation plan (self-formulated). 7. For residential and homestead sites, please apply to the planning department for changing the nature of use before applying.
Fire Protection Law of the People's Republic of China
Article 21, paragraph 2, the personnel who carry out electric welding, gas welding and other operations with fire hazards and the operators of automatic fire protection systems must be certified to work and abide by the fire safety operation procedures.
If you still have questions about this issue, it is recommended that you organize the relevant information and communicate with a professional in detail.
-
Application form for fire protection design review of construction projects; Legal identification documents such as industrial and commercial business license of the construction unit; Qualification certificate of the design unit; fire protection design documents; Other materials stipulated by laws and administrative regulations. If it is necessary to apply for a construction project planning permit in accordance with the law, the construction project planning permit certificate shall be provided.
Initial Fire Protection Certificate Application Requirements:
1. Chan Sui has been engaged in the occupation or related occupations for more than 1 year;
2. The apprenticeship period of the occupation or related occupation has expired.
Intermediate Fire Protection Certificate Application Requirements:
1. After obtaining the fifth-level junior worker vocational qualification certificate (skill level certificate) of this occupation or related occupation, he has been engaged in this occupation or related occupation for more than 4 years (inclusive).
2. Have been engaged in the profession or related occupations for more than 6 years (inclusive).
3. Obtain the graduation certificate of the major or related major of the technical school (including the fresh graduates who have not yet obtained the graduation certificate); or obtain a graduation certificate of the major or related major of a secondary vocational school or above (including fresh graduates who have not yet obtained the graduation certificate) that has been evaluated and demonstrated and takes intermediate skills as the training goal.
-
1. The fire safety approval form for cultural and entertainment venues should be filled;
2. All new places should show the "Construction Project Fire Protection Acceptance Opinion";
3. Fire protection products such as evacuation indication signs and fire accident lights should be presented with the fire protection certificate of the product;
4. When combustible decoration is treated with flame retardant, the inspection report and fire protection product certificate should be presented;
5. Places with building fire-fighting facilities should present the "Vibration Difference Test Report of Building Fire-fighting Facilities" that has passed the test;
6. The bathing place should show the boiler product inspection certificate;
7. The number of consumers accommodated by singing and dancing entertainment venues shall not exceed the approved number.
-
The conditions and materials are mainly:
1) The building is qualified for fire inspection;
2) The site meets the fire safety requirements;
3) Formulated fire safety system and emergency plan;
4) There are trained employees, fire control room personnel with certificates;
5) Legal person certification materials and unit business license;
To apply for an unemployment certificate, you must bring the following documents: >>>More
Article 17 of the Regulations on Marriage Registration stipulates that if a marriage certificate or divorce certificate is lost or damaged, the parties concerned may apply to the original marriage registration authority or the marriage registration authority at the place where one of the parties has permanent residence with their household registration booklet or ID card. Where the marriage registration organs verify the marriage registration files of the parties and confirm that they are true, they shall reissue the marriage certificate or divorce certificate to the parties. In other words, the parties applying for a replacement marriage certificate should apply to the original marriage registration authority or the marriage registration authority in the place where one of the parties has a permanent residence with their household registration booklet and ID card. >>>More
Before a public gathering place is put into use or opened, its owner shall report to the public security and fire protection agency for fire safety inspection in accordance with the law, and shall submit the Application Form for Fire Safety Inspection, the Opinion on Fire Protection Design Review of Construction Projects, the Fire Protection Acceptance Opinion for Construction Projects, the fire safety management system and other relevant materials at the same time. From the date of acceptance, the personnel of the public security and fire department shall conduct an on-site inspection within four working days, and make and deliver the "Fire Safety Inspection Opinion" within three working days from the date of inspection, and agree to put it into use or open for business if it meets the fire safety conditions; If it does not meet the fire safety conditions, it will put forward rectification opinions, and the owner shall rectify it according to the requirements of the "Fire Safety Inspection Opinion" until it meets the fire safety conditions and can be put into use or opened only after passing the inspection by the fire protection agency. (Fu Dongjun).
What materials are required for the qualification review of public institutions? >>>More
The documents required for the establishment of the company are: seal, business plan, notarial signature, proposed company name and business scope; The materials required to apply for a visa are: a copy of the business license of the overseas company, the applicant's resume, academic diploma, passport, photo, etc. >>>More