How to prepare the content of the project bidding and technical bids?

Updated on Financial 2024-05-02
8 answers
  1. Anonymous users2024-02-08

    Technical standard: It is difficult to make a good technical department, which requires very rich experience on the construction site. But it's easier to make a companion (not demanding).

    1) Do a simple technical bidding process: look at the bidding documents, design drawings, outline according to the bidding document scoring standards, find information online, and prepare technical standards according to the bidding documents and drawings and then refer to the materials.

    2) In your question, you ask: the technical standard should be CAD, in fact, there are not many CAD used in a technical standard, that is, a general layout plan and temporary facility layout drawing. Of course, this also requires your ability to understand the drawings, for example, when preparing the plan, you need to analyze the construction of the nodes in the drawings, so you should draw the node diagram according to the drawings, and then put it in the plan, etc.

    3) Suggestion: If you are a construction major or a municipal major, and want to engage in bidding (technical bidding), it is best to find a company first, starting from a simple one; If you feel that you are inexperienced, you can first engage in the construction site and then enter the company to do technical standards. What is written in this way is more realistic.

  2. Anonymous users2024-02-07

    The technical tender is mainly a summary of the bidder's own situation, ability, performance and technical solutions proposed for the project. The bidding documents will focus on the word "technology" to demonstrate and explain, all in order to convey: we have the professional ability required by the tenderer, meet the requirements and put forward a professional design plan, so we actively participate in the bidding.

    Therefore, the preparation of technical targets needs to include all construction organization design content to evaluate the technical strength and experience of bidders. Technically complex projects have detailed requirements for the preparation of technical documents and formats, and bidders should carefully fill in the technical part of the bidding documents in accordance with the regulations, including technical solutions, product technical information, implementation plans, etc.

    The technical bids in the bidding documents should include:

    a.Tenders (i.e. tender letters);

    b.Judging Score Sheet;

    c.Profile of the entity (should broadly include company profile, organizational chart, subsidiaries, and a description of the relationship with subsidiaries, if applicable);

    d.Power of attorney and a copy of the ID card, which is a material related to the qualification certificate of the bidding representative, which proves that the person bidding on behalf of the company is a legally authorized authorized representative;

    e.Qualification documents (various certificates, licenses, certifications);

    f.performance in the past three years;

    g.After-sales service plan and emergency safeguard measures;

    h.Relevant technical information, that is, technical solutions (provided by technical personnel);

    i.Technology |Business deviation table, this item is generally written without deviation, which means that you meet the requirements of the tenderer.

    Among them, the bidding documents (i.e., the bidding letter), the qualification documents of the unit (various certificates, licenses, certifications), the introduction, the power of attorney, the performance, the technical plan, the after-sales service, the emergency measures, and the technical deviation table are often the standard content in the technical bids of other bidding projects.

  3. Anonymous users2024-02-06

    Do a good job in technical standards and pay attention to the following points:

    1. Doing a good job of the cover is the most important thing;

    2. The number of pages should be more, these two are impression scores, and the first impression to the judges must be good;

    3. The technical standard should highlight the key points and highlight the difficulties, which is very important.

    4. There must be substantive content in the technical standard, and a technical standard that can be used anywhere (except for the name of the project) will not get a high score. That is, to highlight the characteristics, according to the characteristics of the project itself to prepare technical standards;

    5. The drawings are drawn in detail, and the technical standards should be made in the first place;

    6. It should be easy to understand, and when compiling technical standards, there should not be too many academic terms;

    7. Focusing on the scoring method in the bidding documents, it must be comprehensive, and points will be deducted if it is omitted, and if it is not done well, it is only necessary to deduct points as appropriate.

  4. Anonymous users2024-02-05

    The bidding documents generally contain three parts, namely the business part, the first part, and the technical part

    2. The technical part includes the description, design and construction plan of the project, the bill of quantities, staffing, drawings, and other technical related information.

    3. The ** part includes the description of the bid, the total bid price, the main material ** table, etc.

    In the bidding, the commercial bid is accessThe economic standard is shortlisted, the technical standard is the last link in the bidding, and the problems of the technical standard are:

    1. Packaging and content: At present, the bidding book generally pays attention to the packaging, the appearance and mode, but the problem that often arises is that the packaging is very particular, but the content is very empty.

    2. Scrap bids in hidden bids: The construction organization design is generally a dark bid, but some packaging and modes are not in accordance with the unified requirements of the bidding documents, or the characteristics of the enterprise appear in a certain detail, resulting in scrapped bids.

  5. Anonymous users2024-02-04

    1. General overview.

    2. Construction plane layout and temporary facility layout.

    3. Project management team allocation, labor and material input plan and its guarantee measures.

    4. The construction schedule and the progress and guarantee measures of each stage and the commitment of liability for breach of contract (including network diagram, and indicate the key lines).

    5. Machinery and equipment investment plan.

    6. Analysis and solution of construction technology, process and quality assurance measures of key processes, key points and difficulties in the implementation of engineering projects.

    Solution 7: Protection measures for underground pipelines, above-ground facilities, and surrounding buildings.

    8. Coordination measures for each process.

    9. Quality assurance measures such as various pipelines and lines.

    10. Construction measures in the rainy season.

    11. Safety assurance measures.

    12. Civilized construction measures.

    13. Environmental protection measures at the construction site (measures to reduce noise and reduce dust in the surrounding environment and ensure the smooth flow of traffic).

    14. Construction site maintenance measures.

    15. Service measures after the project is handed over for inspection (including the maintenance period).

    Bidding documents refer to the responsive documents prepared by the bidder in response to the requirements of the bidding documents, which are generally composed of business documents, technical documents, ** documents and other parts. There are also specific provisions on the supplementation, modification and withdrawal of bidding documents, which clarify the rights and obligations of bidders, which are common rules established to meet the needs of fair competition.

  6. Anonymous users2024-02-03

    Key points of technical standard preparation.

    1.Project Fact Sheet.

    According to the construction drawings, the project information, engineering quantity and technical requirements of the project are explained.

    2.Construction organization design integrity.

    In accordance with the requirements of the bidding documents, submit a complete construction organization design, including construction deployment, plan, resource allocation, schedule, technical organization, difficult countermeasures, etc.

    3.Construction deployment.

    It is clear that the general layout of the construction plan of the project is reasonable, the temporary facilities and preparations are sufficient, the arrangement of the project management organization is clear, and the responsibilities of each department and position are clarified.

    4.Construction plan.

    Submit the construction plan according to the actual situation of the project, especially the understanding of the visual image standard of the project and how to meet the standard. how the installation of the facility is carried out, etc.

    5.Implement schedules and assurance measures.

    In accordance with the deadline specified in the bidding documents, the implementation schedule shall be prepared. The implementation schedule can be represented in a Gantt chart (or a key line network diagram) that states the planned start date and the completion date of each key node.

    6.Resource Planning.

    In accordance with the schedule, quality, safety requirements of the bidding project and the actual construction conditions on site, the corresponding resource plan is proposed, including labor demand plan, machinery and equipment demand plan, main materials and turnover material demand plan, etc.

    7.Technical and organizational measures.

    The bidder is required to prepare technical and organizational measures according to the actual situation of the project, including measures to ensure progress objectives, measures to ensure quality objectives, measures to ensure safety objectives, measures to ensure cost objectives, measures to ensure seasonal construction, measures to ensure the environment and civilized construction measures, commitments and guarantee measures during the defect liability period, technical training, technical services, etc.

    8.Implementation difficulties and countermeasures.

    The bidder is required to point out the difficulties in the construction of the bidding project, especially how to do a good job in the construction organization of the construction sites that are scattered, and put forward corresponding countermeasures for the difficulties.

    9.Night shift and weekend construction plan and description.

  7. Anonymous users2024-02-02

    Generally, the format of the bidding documents will be specified in the bidding documents.

    It is divided into commercial and technical formats.

    You can take a look.

    After you finish it and then according to it to compile, generally you need to write a project overview, the overview can refer to the bidding documents, write the project name, construction period, quality requirements, contract methods, etc. will be found in the bidding documents (unless you have not read the bidding documents and want to compile the technical jujube wisdom standard stupid rock car, then I will say it in vain) The project overview will be written after the construction of the major difficulties of analysis, labor allocation, construction design organization, quality assurance measures and breach of contract commitment, warranty.

    That's all I've done.

    Hope it gives you a hint.

  8. Anonymous users2024-02-01

    Answers]: a, b, d, e

    2020 Textbook P258 2019 Textbook P243

    1) Collapse technical standard 1The design scheme description is large (for projects with e); 2.equipment procurement (for projects containing P); 3.quality control programs for material procurement; 4.the configuration of the construction equipment and the empty round equipment; 5.Outline of construction organization design.

Related questions
7 answers2024-05-02

It mainly includes the following three parts:

Eligibility Review File Format. >>>More

2 answers2024-05-02

Decoration engineering refers to the construction of housing construction including plastering, painting, grouting, glass, pasting, finishing, cover panel and floral decoration and other processes of the decoration project of the tenderer through the issuance of a bidding announcement, inviting the construction bidder with construction decoration requirements to bid for the act. What are the basic functions of engineering decoration bidding? >>>More

8 answers2024-05-02

And a** write a post to send to you I don't know if that's the case.

12 answers2024-05-02

There are two main directions of specialization in ship engineering technology: >>>More

4 answers2024-05-02

It is necessary to do a good job conscientiously and actively participate in the company's activities.