Borrow some tools, electric tools may be a little better, and then you can grind the position below, and then set it up in advance, it will be better.
-
It's very simple, as long as you have more strength, the bigger and bigger this thing you fight.
-
It's time to get to the pebbles, there's no quick way to do it, you'd better have a way to spin it, if not, you can add some water to it, I think it's going to be faster.
-
From Sui Zhuang to the cobblestones, it took only four to hit in two days, and it was not fast to fight? This pebble is very hard to beat, you have to use the sharpest drill bit to hit it.
-
It took two days for the Central African pile to knock down the pebbles and hit four meters, how to hit it fast? Because when she played the Netherlands, she was sick for two days and only hit four meters, and he didn't judge that ten in the Netherlands is not equal to meters, he is equal to a number, how to play fast? You can find out at a glance.
-
When the water chong hit, the two armies hit four meters, why was it so fast? I think passers-by don't call to be fast, you can ask others, or check your phone.
-
As long as you play normally, there are no shortcuts, because it really doesn't have a good way.
-
When the hammer pile reached the Netherlands, it only took four seconds in two days, how could it be fast? If you hit the ten regions of the Netherlands, then you can't go fast, and you can go fast after this area, you can only sell a little, and it's good to fight.
-
If you want to hit four meters on this, it is recommended to use some special tools in this case, and if you are a specialized person, this situation is very tiring.
-
Hitting the pebbles quickly requires good technology and machines, to adjust to the fastest speed, and the efficiency is high.
-
Hehe, I don't know what kind of soil you have in your area, so I'll calculate it for you according to the clay type.
Set the design conditions first.
1. The column is below the concrete, and the above is the steel column.
2. The largest crane is 10 tons.
3. Adopt independent foundation and foundation beam connection.
1. Basis for independence.
1600*2100 1000*1500 300 300 2100 and 15 meters in the same direction.
The steel bar only has secondary steel 14 on the bottom plate, and the spacing is 150 Explanation of the size: there are 2 layers of platform below 1600 * 2100 above 1000 * 1500 foundation short column 400 * 600 600 and 15 meters in the same direction Reinforcement 12 20 hoops 8 spacing 100
Second, the foundation digging depth of meters or more than the ground frozen layer.
Three, the foundation beam 370 * 500 steel bar up and down 4 stirrups of 16 stirrups 8, spacing 200
Fourth, the bearing capacity of this foundation soil is 120kn m2
-
Percussion piling to drive blue stone and sand layer deviation holes, you can take some bricks to correct.
-
Just after finishing the training, you can adjust it and fix it.
-
Oh, if you want to correct his film, first you have to use a ruler to check the precise positioning.
-
I think if you want to correct it, you have to turn and play at the beginning of the game, and you can correct it if you can't hit it off.
-
How to correct the pebbles and sand layer deviation holes driven by impact piling? You'll have to find a professional to help you answer this.
-
How to correct the deviation holes of impact piling and sand layer disrupted stone and sand layer, you can check it on the top.
-
If the pebble is cohesive soil, it can be pre-driven with steel sharp piles, and if it is pure pebbles or sand pebbles, it can only be changed to drilling, and mud wall protection.
-
Larsen steel sheet pile groove steel sheet pile difference.
-
e Is it solved now, and how? Learn from the following...
-
You can't hit two holes at once.
As for the fast punching, choose the imported, relatively large model, with the original imported drill bit!
5 pits are heavy-duty electric hammers, and the cost of using 8 of them is too high, and the imported small ones are two pits and two slots.
4 pits are domestic.
-
The rotary excavator is suitable, and the supporting pile does not expand the bottom, which is just right.
If there is no undesirable strata such as quicksand, it is also feasible to prepare a special safety plan, do a good job of wall protection, and manually dig holes.