Warehouse floor paint price, warehouse floor paint construction plan?

Updated on society 2024-05-14
13 answers
  1. Anonymous users2024-02-10

    Hello: People who have been engaged in the epoxy resin flooring industry for 15 years will introduce you to you;

    Warehouse floor paint coating usually choose epoxy resin flooring, and epoxy resin floor series are numerous, most users are choosing epoxy thin coating floor, epoxy mortar floor and epoxy self-leveling, if you do not do cement floor, you can also choose concrete sealing curing agent floor.

    The similarities are dustproof, slip-resistant, abrasion-resistant, stress-resistant, and easy to clean.

    The difference is that epoxy self-leveling flooring has better aesthetics than epoxy mortar flooring and epoxy thin-coated flooring, and the service life and wear resistance are the best. Concrete sealing curing agents are low in cost, but poor in aesthetics.

    The epoxy floor construction plan and ** are as follows:

    Ground grinding and cleaning;

    Apply a high permeability primer; The usage is.

    Scrape and apply a medium-coated mortar, and select the number of coating lanes according to the actual ground conditions; The usage is.

    Scrape and apply epoxy putty twice; The usage is.

    The mortar floor topcoat is an epoxy topcoat, which is rolled twice, and the amount used is; The self-leveling floor is first scraped and coated with a self-flowing plane paint, and the amount of use is, the sealing layer, and then the trowel is coated with a self-flowing plane paint, and the amount of use is;

    The amount of use and painting method are different.

    epoxy thin-coated floor contractor material 18-26 yuan per square meter;

    Mortar floor contractor material between 26-55 yuan per square meter; Self-leveling flooring contractors and materials are between 55-85 yuan per square meter. The specific construction plan and ** are to be determined according to the actual ground conditions and requirements, and the above is only for reference.

    The concrete sealing curing agent floor is constructed synchronously with the concrete, so the ground can be done without cement. The cost is twenty or thirty yuan.

    Yin Gong, 135 2209 6039, focusing on high-end environmental protection epoxy resin floor customization.

  2. Anonymous users2024-02-09

    This generally has to use epoxy floor paint, you can go to Alibaba to see.

  3. Anonymous users2024-02-08

    1. Ground grinding: Use a grinder to polish and level the parts of the ground such as cement slag above the ground to remove the ground ash. Other treatment measures are used for loose and oily ground.

    2. Primer: After the concrete substrate is processed and cleaned, the primer (roller coating or brushing) can be carried out, and the roller coating or brushing should be even.

    Uniform, consistent thickness. The primer has a certain water vapor permeability, which can enhance the strength of the substrate and increase the adhesion of the coating to the substrate.

    3. Intermediate coating: Quartz sand and quartz powder are added to the prepared water-based epoxy coating (intermediate coating) to form a water-based epoxy mortar, and it is evenly coated with a trowel to increase the thickness and compressive strength of the coating.

    4. Batch supplement: After the middle coating, the floor is polished with sandpaper, and the putty composed of water-based epoxy paint (medium coating) and quartz powder is constructed according to the actual needs, and it is required to be smooth and no holes, and there is no batch of knife marks and sanding marks.

    5. Putty batch supplement: the use of primal coating materials is deployed according to the proportioning method of primal coating materials, and the surface can be directly coated in polishing without adding water.

    layer is scraped onto the layer. If necessary, you can appropriately add finer quartz powder or heavy calcium powder to make up, and polish it as a whole with fine sand disc paper after the batch is finished, and the reference amount of the material is supplemented.

    6. Topcoating: Applying the water-based epoxy floor coating to the surface coating, the surface coating roller coating is applied twice, and the overall ground gloss is required to be soft, clean and uniform after completion.

    1. No empty drums.

    7. Maintenance: It takes 24 hours for the surface layer to be dry, and it should be closed during this period, so as not to affect the clean and smooth effect of the surface. 3D can be uploaded.

    people, 7 days after the completion of maintenance can be officially put into use (25 shall prevail, low temperature needs to be moderately extended).

  4. Anonymous users2024-02-07

    The conditions that need to be met on the warehouse floor are moisture-proof, dust-proof, wear-resistant, and compression-resistant. If the aesthetic requirements are not very high, you can do epoxy mortar flooring, and the construction plan is as follows: the overall ground is sanded and cleaned, the high permeability primer is painted, the solvent-free medium-coated mortar is scraped (used to increase compressive strength, the leveling is repaired, and the cracks and pits are repaired), the solvent-free medium-coated putty is scraped (used for dust sealing), and finally the solvent-free epoxy topcoat is rolled.

    It is recommended that the materials should be environmentally friendly and high-quality, and the construction personnel should have rich experience, which will be used for a long time in the floor project, and will not be peeled and bulging.

  5. Anonymous users2024-02-06

    The key is which one you want to do, you can send me a private message.

  6. Anonymous users2024-02-05

    Hello, the factory warehouse is usually a place to store products, and often go by car, to meet the load requirements and clean environment; It is recommended to make epoxy mortar floor series better; It is cost-effective, and has good wear resistance, dust-proof and anti-slip, and anti-heavy pressure. The specific construction process is based on the actual ground conditions to make the construction solution, the thickness is usually in, the service life can reach more than eight years, here it needs to be mentioned is the material, there are various materials on the market, the main difference is resin and curing agent, because there are many kinds of resin and curing agent, then the quality of the finished product is good and time, the choice needs to be cautious, in case the use of the process of peeling and bulging and powder loss.

  7. Anonymous users2024-02-04

    The floor paint of the factory floor is determined by customer needs and actual ground conditions. Common painting processes include epoxy mortar flooring and epoxy self-leveling. The thickness of these two processes is different, and the cost is also different. The following details how much different paints are painted**.

    Brush roller coating epoxy mortar floor package material on the floor of the workshop**: Due to the need for load equipment and forklift trailers in the workshop, the construction thickness is recommended to be between 7-10 years. Package material **25-40 yuan.

    Plant floor brush epoxy self-leveling package material**: between the conventional construction thickness, the ground hardness and flatness of the ground can be done, and the construction thickness increases if the ground condition is slightly worse and the need to resist heavy loads. (The thickness is increased by the solvent-free medium coated mortar, which is used to increase the compressive strength and repair and leveling) between 45-60 yuan.

  8. Anonymous users2024-02-03

    How much is a square meter of concrete sealing curing agent floor? Concrete sealing curing agent floor construction**? Concrete sealing curing agent floor depends on the material and construction site, generally about 60 yuan square meters to 80 yuan square meters. Slightly more expensive than epoxy flooring**.

    How to charge for concrete sealing curing agent, you have to ask the construction team, because they do it all year round, some by the square, and some may be according to the house type or something, it is not easy to say how to calculate the team you are looking for. As for the concrete sealing curing agent floor, the different concrete sealing curing agent flooring manufacturers are different, and the concrete sealing curing agent floor is determined by the following factors:

    One is the concrete sealing curing agent floor material**.

    The second is Party A's requirements for concrete sealing curing agent flooring.

    3. Concrete sealing, curing agent, floor construction, grinding discs and consumables.

    Fourth, the wages of concrete sealant curing agent floor construction workers.

    Concrete sealing curing agent floor construction**, we take Nalut concrete sealing curing agent floor as an example to explain the composition of concrete sealing curing agent floor construction**

    The construction of concrete sealing curing agent floor is composed of the following three parts:

    First, different concrete sealing curing agent floor, the simplicity of construction is not the same, the construction of Nalute concrete sealing curing agent floor is extremely simple, and the construction cost is naturally lower.

    2. Concrete sealing curing agent, floor construction grinding pads and construction consumables**.

    3. The wages of concrete sealing curing agent floor construction workers.

  9. Anonymous users2024-02-02

    At present, floor paint has been widely used in warehouses, factories and warehouses, and the excellent characteristics of floor paint are quite popular with the public. Therefore, most users consult how much is the cost of floor paint on the floor of the warehouse plant, but in fact, the cost of floor paint is not a single price.

    The cost of floor paint on the floor of the warehouse is one square and the construction technology is inseparable from the original ground situation, and the specific ground situation and user requirements determine the construction process. Sometimes the ground situation directly determines the construction plan. Therefore, in order to completely solve the actual ground problem, it is necessary to investigate the ground on site to make the most suitable construction plan!

    Let's introduce the construction process of ordinary epoxy resin floor paint:

    1. Base surface treatment, dust-free grinder grinds the ground, disposes of the dust and impurities on the ground, and keeps the ground as smooth and clean as possible;

    2. Roller brush high-efficiency epoxy primer to improve the adhesion ability of the middle coating and the base surface, and select the amount of brushing according to the actual ground conditions;

    3. Scraping and coating mortar, the layer mainly plays the role of mending large pits, leveling and compression; Select the number of scraping passes according to the actual ground conditions;

    4. Scrape putty in batches to improve the bonding ability of the middle coating and the top coating;

    5. Paint on the top, roll brush the surface or scrape the floor paint with a trowel.

    The above is the epoxy resin floor construction process, and the specific construction plan is subject to the actual ground conditions!

    Focus on high-end epoxy resin floor customization for 15 years, imported construction equipment, dust-free grinding machine, grinding machine, etc.; High-quality floor paint materials, high content of liquid resin in South Asia, full paint film and strong hiding power; There is no need to visit the ground to make the most suitable construction plan!!

    Mr. Yin (focusing on epoxy flooring engineering, 1 3 5 2 2 0 9 6 0 3 9).

  10. Anonymous users2024-02-01

    Epoxy resin mortar floor is the first choice for warehouse floor paint, high wear resistance to ensure long-term service life, beautiful atmosphere, and recommended index

  11. Anonymous users2024-01-31

    The geographical location is far away ** also expensive.

  12. Anonymous users2024-01-30

    It depends on what you do with the floor paint and the floor.

  13. Anonymous users2024-01-29

    The floor coating of the warehouse plant is determined according to the actual ground conditions and usage.

    1. If the ground condition is good, you can choose epoxy thin-coated flooring, epoxy mortar flooring, epoxy self-leveling flooring, etc., which can achieve dustproof, waterproof, pure wear resistance, heavy pressure resistance and easy to clean Yuchang.

    2. If the ground condition is poor, more materials are used, then you can choose 2mm epoxy mortar flooring, epoxy self-leveling flooring, etc. Of course, the thickness can be increased.

Related questions
9 answers2024-05-14

It is best to brush the cement floor with epoxy floor paint. Floor paint, mainly made of oil, tree material, color, solvent, etc., is mainly divided into decorative floor paint, heavy anti-corrosion floor paint, heavy load resistant floor paint, etc. Floor paint is composed of a variety of different substances through many production processes such as mixing, dissolving, and dispersing. >>>More

11 answers2024-05-14

1. Plain land treatment: the cement plain ground must be thoroughly dried, the ground must not be oiled, the ground cannot be cleaned with water, and the grinding, repairing and dust removal work should be done according to the condition of the plain land; >>>More

11 answers2024-05-14

Types of floor paints:

Ordinary cement concrete floor paint floor, after a period of use, the ground will appear different degrees of sand, dust, with the growth of service life, coupled with carbonization, water erosion, weathering, the floor surface will continue to pulverize, affecting the normal use. >>>More

7 answers2024-05-14

This paint is very good, cheaper than Nippon Paint and China Resources, it is one of the top ten brands of Chinese home decoration coatings, and I use this paint at home! >>>More

17 answers2024-05-14

Boycott Japanese products and support domestic production.