-
1. Base surface cleaning: use a motorized grinder to grind the base surface roughly, and then use a manual grinder to remove the base surface that needs to be thoroughly cleaned;
2. Clean and inspect the substrate: after vacuuming the base surface, check whether the substrate has cracks and empty shells, if there is, it must be deeply cut and cleaned and filled with epoxy resin mortar, because the epoxy resin does not allow water, so it can only be dry in the treatment process, and it can not be brutally beaten when cleaning, so as not to knock on the base layer on the loose edge;
3. Epoxy resin primer coating: at the same time of substrate treatment, epoxy primer coating can be carried out, and the balance between the construction progress and the materials should be paid attention to when constructing the ingredients, and the materials should not be cut too much at one time, so as to ensure that the materials are still in line with the usable time when coating, and are brushed before gelatinization, so that the materials can maintain good permeability and ensure the bonding performance;
4. After the primer is cured, first use epoxy resin to coat quartz sand and scrape the epoxy quartz mortar n times to increase the thickness of the entire paint film and strengthen the physical properties of the paint film such as compression and impact resistance;
5. Epoxy resin soil coating: after the mortar layer is cured, scrape the epoxy soil 2 times, close the sand hole and pores, polish the putty and vacuum it clean;
6. Epoxy resin topcoating: polishing the coating, under the condition of ensuring that the base surface is completely closed, construct 2 epoxy resin flat coatings according to the design requirements, and stir the topcoat material evenly during construction and then roll coating; Environmental requirements for coating construction: the construction base surface should be kept clean and dry, no cross-operation of other engineering construction, the relative humidity of indoor air should be less than 85%, and the construction should be stopped when the humidity is too large;
7. On-site cleaning and maintenance, floor maintenance: After the surface coating is completed, the relevant construction materials and tools will be moved away from the site, and the finish will be strictly closed and protected, and people can only be allowed to enter and walk after at least 48 hours. It is not allowed to bring in sediment, and it generally takes 7 days for the paint film to completely solidify, during which other construction, handling, installation and other construction should be avoided;
-
There are many epoxy flooring series, and the construction technology is also different, including epoxy flat coating floor, epoxy mortar floor, epoxy self-leveling floor, epoxy anti-slip floor, epoxy anti-static floor, epoxy color sand floor, etc.
The construction process is as follows:
All need to polish the ground, clean up dust, oil, etc.;
Roll over the epoxy penetrating primer, the amount of coating should be sufficient, and some also need to be immersed;
Scrape a solvent-free medium coating mortar, and select the number of coating channels according to the actual ground conditions;
Scrape and apply epoxy putty twice to make the ground smoother;
Roller coat twice epoxy topcoat or trowel coated artesian plane, according to different construction processes to choose different materials, construction equipment and coating methods.
Focus on epoxy resin floor customization for 15 years, Manager Wang, 18001290003.
-
There are many epoxy floor paints according to the type of construction and functional flooring;
1. Epoxy flat coating epoxy mortar flat coating, epoxy mortar flat coating, epoxy mortar flat coating, epoxy high pressure sand floor;
0mm epoxy self-leveling, epoxy mortar self-leveling, epoxy mortar self-leveling;
3. Anti-slip epoxy flooring, anti-static epoxy flooring, epoxy colored sand flooring, epoxy anti-corrosion flooring, etc.; The detailed construction plan can be sent to you in an electronic version, and the one-stop supplier of floor materials of Apel Company, Manager Jiang one.
Three. Seven, ninety.
Two. Fourth, one hundred and forty.
-
Hello dear, glad to answer for you! Construction engineering construction and epoxy floor construction are different types of construction, each with its own advantages. If you need to build a large building or carry out civil works, construction engineering is a better option.
And if you need to install flooring, epoxy flooring construction is a better choice. Construction projects typically take longer and require a larger investment, but can provide more space and functionality. This type of construction usually requires professional architects and engineers to plan and supervise.
Epoxy floor construction, on the other hand, is a relatively simple type of construction that provides long-lasting, easy-to-grip clean and aesthetically pleasing floor coverings. This kind of construction usually requires professional floor construction personnel to enter the mountain. In conclusion, the choice between construction and epoxy flooring depends on your specific needs and budget.
-
Construction engineering construction and epoxy floor construction are two different fields that cannot be directly compared. Below I will briefly introduce the features and advantages of these two areas to help you make your choice: Construction Engineering:
Wide range: The construction of construction projects includes various types of projects such as construction, civil engineering, roads, bridges, etc., and involves a wide range of fields. Long-term investment:
Construction projects are usually large-scale, long-term investment projects that involve multiple phases of planning, design, construction, and operation. Multidisciplinary Integration: Construction engineering requires multidisciplinary expertise and coordination, including engineering design, structural, civil engineering, electrical, mechanical, etc.
Epoxy Floor Construction: High Abrasion Resistance: Epoxy Floor Construction is commonly used in industrial and commercial locations and has excellent abrasion and chemical resistance, and is able to withstand heavy pressure and frequent use.
Aesthetically pleasing and easy to clean: Epoxy flooring has a smooth, glossy surface that is easy to clean and maintain, while being designed and decorated as needed. Rapid construction:
Compared with some traditional ground pavement methods, the construction period of epoxy flooring is relatively short, which can quickly complete the construction and reduce downtime. The choice between construction and construction and epoxy floor construction depends on your needs and specific situation. If you need to carry out large-scale construction projects, such as house construction, bridges or roads, then construction works are necessary.
And if you need to renovate and protect the floor of an industrial or commercial place, epoxy floor construction can be an excellent choice. The final decision should be based on your specific needs, budget, and project requirements.
-
There is still a certain difference.
Epoxy flooring engineering construction steps:
1) Epoxy primer construction: 1. Ensure that the ground is clean before construction, and remove if there is any debris adhesion; 2. Mix the epoxy resin and the curing agent in the correct proportion. 3. If Zheng Qi stirs evenly, use the method of scraper or roller application.
4. It is required to be soaked to strengthen the adhesion. 5. After a dry solid, apply the epoxy middle coating.
2) Epoxy coating construction 1, before construction, it is necessary to ensure that the ground is clean, and if there is debris adhesion, it needs to be removed; 2. Mix the epoxy resin and the curing agent in the correct proportion, and add a certain amount of quartz sand according to the ratio; 3. After stirring evenly, dump it on the ground, and use a trowel to evenly open the material according to the thickness of the slag to increase the strength and impact resistance; Make the ground stronger and more compressive. 4. After the middle coating is dried and solidified, it is polished to polish the sagging objects and particles on the surface. 5. Dust is cleaned.
3) Epoxy putty layer construction 1, on the clean ground, the epoxy resin and quartz powder are stirred evenly according to the correct ratio, and the batch knife is used to evenly scrape on the ground to increase the combination between the middle coating and the surface layer, and further adjust the flatness of the ground; 2. Depending on the actual number of work needs, it is required to be smooth and without holes, and there is no batch of knife marks and sanding marks. Inspection method: make the ground completely flat without holes, and there is no batch of knife marks and sanding marks before the top coating can be constructed.
4) Epoxy surface coating construction 1, before construction should be kept clean, if there is debris adhesion to need to be removed; 2. Stir the B component of the topcoat material first; Then add the curing agent to mix and stir thoroughly; 3. Use rollers to evenly coat the material with which cloth; 4. After the coating is dry and solidified, the second surface coating is applied. 5. The artesian plane is coated with a trowel and scraped again.
-
First of all, use a grinder to level the ground, scrub the ground repeatedly to ensure that its surface is smooth and dry without impurities, add a certain proportion of curing agent to the epoxy resin, use a roller or scraper to apply after stirring, and mix quartz powder and epoxy resin in proportion to make a putty layer after grinding, and carry out two coatings.
The advantages of epoxy flooring are: compression and wear resistance, strong acid and alkali resistance, not easy to be injured by chemicals, high hardness, and particularly long service life. It has a certain degree of fire resistance, and there is no smell, whether it is storage or transportation is very convenient.
Due to its special construction technology, its overall flatness is much stronger than that of floor tiles or wooden floors. It has a very large number of colors, a great selectivity, and many places where it is used. It can be used even in humid environments and adapts well to old equipment.
Since it is more resistant to dirt than ordinary flooring, it is also easy to clean. It is not easy to accumulate dust and bacteria, and can be rinsed directly with water, which is very worry-free and labor-saving.
There can be no bubbles on the surface, and if it is self-leveling, only one bubble can appear every 10 square meters. It is required that the overall leveling is good, there can be no traces of diffuse, and the position of the interface should also be flat. There will be no uneven color, blooming or floating color on the surface, especially the interface can not have color difference.
How to apply epoxy resin paint?
Reference for two-component epoxy paint construction. >>>More
It can be done. However, it depends on the cleanliness and aesthetics of the floor in your factory. If your plant only requires durability and smoothness, then it is completely OK after hardening and wear-resistant treatment. >>>More
a.Confirm the construction area and construction specifications (color and construction area); >>>More
In home decoration, paint engineering occupies a very important part, the appearance of paint construction engineering has basically indicated that the decoration and more than half, the general paint construction process is for the interior surface to be more interesting, so what is the specific paint construction process. >>>More
1. Ground grinding: Use a grinder to polish and level the parts of the ground such as cement slag above the ground to remove the ground ash. Other treatment measures are used for loose and oily ground. >>>More