Who knows the registration procedures for the use of tower cranes

Updated on society 2024-06-26
8 answers
  1. Anonymous users2024-02-12

    First of all, it is necessary to report for installation, and then to test, and after the test is completed, the use registration will be handled after the certificate is obtained.

    At present, construction cranes (tower cranes, construction elevators, etc.) are unified by the construction administrative department where the project is located, that is, the construction committee.

    No thanks, the management of the tower crane is like this now.

    The first level: property rights registration.

    According to Order No. 166, construction hoisting machinery is required to register the property rights of special equipment, which is equivalent to receiving an ID card, which is unique and used for life. When handling the property right registration, it is necessary to provide the product factory certificate, the manufacturer's special equipment manufacturing license, the product purchase and sale certificate (contract, invoice, etc.) and other materials that need to be presented.

    Note: The first pass is responsible for the property rights unit of special equipment, that is, the unit that purchases the tower crane is responsible.

    The second level: inspection application.

    When applying for inspection, you must provide property rights registration certificate, factory certificate, special equipment manufacturing license, product nameplate, equipment full picture, installation unit qualification certificate, installer qualification certificate and other information that the local construction administrative department needs you to provide (for example: tower crane foundation concealed engineering acceptance data signed by the supervision unit, tower crane last use of the test certificate, etc.).

    Note: Different local regulations are different, some places must be the local quality and technical supervision bureau is responsible for testing, and some places can ask qualified units in the society to test.

    The third level: register for the use of tower cranes.

    Take all the above information, and then bring the test certificate, go to the construction committee (generally the safety station) to handle the use of registration, and receive the registration certificate, and come back to hang on the tower crane. Get.

  2. Anonymous users2024-02-11

    According to the above methods, you can't do it without cash, about 1,000 yuan or so plus a benefit fee, depending on the size of the tower crane in different regions. That's what they eat.

  3. Anonymous users2024-02-10

    Measures for the Filing and Registration of Construction Lifting Machinery (Jianzhi [2008] No. 76).

    When the user handles the registration of the use of construction lifting machinery, it shall submit the following information to the use registration authority:

    1) Construction hoisting machinery record certificate;

    2) Construction hoisting machinery lease contract; Safety Agreement; Installation contracts.

    3) Inspection and testing reports and installation acceptance materials of construction lifting machinery;

    4) The qualification certificate of the special operation personnel of the user unit;

    5) Management systems for the maintenance and maintenance of construction lifting machinery;

    6) Emergency rescue plan for safety accidents in the production of construction lifting machinery;

    7) Use other materials as prescribed by the registration authority.

  4. Anonymous users2024-02-09

    Generally, there are 4 steps:

    1. Go through the filing procedures (i.e., go to the household): a copy of the business license of the property right unit, a copy of the product certificate, a purchase and sale contract, a sales invoice, a supervision and inspection report, etc. All are stamped with the official seal of the property right unit.

    The safety supervision station of the local construction committee handles it; After approval, you will receive a "record certificate" and a "registration plate (metal plate)".

    2. Handle the installation notification procedures: Generally, when handling the record, you can get a set of **, and prepare the information according to the requirements to complete the notification procedures before the tower crane can be installed.

    4. Handle the use of registration procedures: bring the inspection report, but also at the safety supervision station to get the form, handle the relevant information, submit to the safety supervision station, after the approval to get the "permit", the tower can be put into use.

    Legal basis: Work Safety Law of the People's Republic of China

    Article 3 Safety production management, adhere to safety first.

    First, the principle of prevention first.

    Article 4 Production and business operation entities must comply with this Law and other laws and regulations related to production safety, strengthen the management of production safety, establish and improve the responsibility system for production safety, improve the conditions for production safety, and ensure production safety.

    Article 5 The main person in charge of the production and business operation unit of Zizhen Town shall be fully responsible for the safety production work of the unit.

    Article 6 Employees of production and business operation entities have the right to obtain production safety guarantees in accordance with the law, and shall perform their obligations in production safety in accordance with the law.

  5. Anonymous users2024-02-08

    1. Go through the filing procedures (i.e., go to the household): a copy of the business license of the property right unit and a product certificate are required.

    Copies of purchase and sale contracts, sales invoices, supervision and inspection reports, etc. All are stamped with the official seal of the property right unit.

    The safety supervision station of the local construction committee handles it; After approval, you will receive a "record certificate" and a "registration plate (metal plate)". 2. Handle the installation notification procedures: Generally, when you do the filing of Naysell Mathematics and Physics, you can get a set of first-class distribution banks, and prepare information according to the requirements for processing; The tower crane can be installed only after completing the notification procedures.

    Bring the inspection report, but also in the safety supervision station to get the table, handle the relevant information, submit to the safety supervision station, after the approval to get the "permit", the tower crane can be put into use in Changshou.

  6. Anonymous users2024-02-07

    Before the use of the tower crane, the first need to be responsible for the inspection and testing of the professional safety supervision department, and issue a qualified test report document, and then also need to be installed at the installation site, the rental unit, the use of the unit of the common inspection of the collapse, qualified can be cast into the circle to make the potato with.

  7. Anonymous users2024-02-06

    After the property right unit purchases a tower crane (including the purchase of second-hand equipment), it needs to go to the district, city and county construction committee for registration and obtain a registration number before renting or using it for the first time. The procedures for the registration and filing of local enterprises in the place of industrial and commercial registration are as follows:

    Article 5 of the Measures for the Filing and Registration of Construction Lifting Machinery stipulates that the construction lifting machinery rental unit or the self-purchased construction lifting machinery user unit (hereinafter referred to as the "property right unit") shall file with the local people's ** construction department at or above the county level where the industrial and commercial registration of the unit is located (hereinafter referred to as the "equipment filing authority") before the construction lifting machinery is leased or installed for the first time.

    Measures for the Filing and Registration of Construction Lifting Machinery (Jianzhi [2008] No. 76 document) The user shall submit the following information to the registration authority when handling the registration of the use of construction lifting machinery:

    1) Construction hoisting machinery record certificate;

    2) Construction hoisting machinery lease contract; Safety Agreement; Installation contracts.

    3) Inspection and testing reports and installation acceptance materials of construction lifting machinery;

    4) The qualification certificate of the special operation personnel of the user unit;

    5) Management systems for the maintenance and maintenance of construction lifting machinery;

    6) Emergency rescue plan for safety accidents in the production of construction lifting machinery;

    7) Use other materials as prescribed by the registration authority. All the above information for the registration of the use of the tower crane are taken on, and then the test certificate is brought to the construction committee (generally the safety station) for the use of the registration, and the registration certificate is obtained, and the tower crane is hung up.

  8. Anonymous users2024-02-05

    Legal analysis: tower crane drivers and signal personnel must be specially trained, and the relevant departments will issue a certificate of conformity, that is, a tower crane driver certificate, that is, a tower crane operation certificate, which is a special operation certificate. And pay attention to whether the tower type learned by the driver is consistent with the tower type actually operated.

    Tower crane is the most commonly used lifting equipment on construction sites, also known as "tower crane", with a section of the length (height) (referred to as "standard section"); It is used to hoist the raw materials for construction such as steel bars, wooden flutes, concrete, steel pipes, etc. Tower crane is an indispensable piece of equipment on the construction site. With the rapid development of China's urbanization, tower cranes are playing an increasingly important role in building construction and cargo handling with their strong elasticity and large bearing capacity.

    However, because tower crane construction involves mechanical and electrical operation and aerial work and other risks, construction safety has also become a matter that every tower crane driver must pay attention to. In addition, before each tower crane starts, the tower crane needs to run empty and check, so as to prevent problems.

    Legal basis: "Regulations of the People's Republic of China on the Administration of Safety Technical Training and Assessment for Special Operations Personnel".

    Article 2 These provisions shall apply to the safety of special operations personnel of production and business operation units for technical training, assessment, issuance, review and supervision and management. Where the relevant laws, administrative regulations and regulations on the management of special operations personnel have other provisions, follow those provisions.

    Article 3 The term "special operation" mentioned in these regulations refers to the operation that is prone to accidents and may cause major harm to the safety and health of the operator and others, as well as the safety of equipment and facilities. The scope of special operations shall be specified in the catalogue of special operations.

Related questions
11 answers2024-06-26

Crane. 100 rebars are used for the base.

The tower crane base is one of the most commonly used lifting equipment on construction sites, also known as tower cranes. >>>More

5 answers2024-06-26

Approval process. 1. If the transfer of the allocated land use right needs to go through the transfer procedures, it shall be handled in accordance with the transfer procedures; >>>More

10 answers2024-06-26

1) Residents of the city who are within the legal working age, have the ability to work, have employment requirements, and do not have the right to contract and manage land and the right to use forest land in rural areas (including the right to contract and manage land and the right to use forest land that have been transferred) or whose land (forest land) has been expropriated in accordance with the law and whose remaining land area is less than the number of people per mu and who are unemployed, shall register as unemployed at the community (village) employment service agency in the place of household registration. >>>More

9 answers2024-06-26

1. Conditions for marriage registration.

1. Both men and women must marry voluntarily (independently). >>>More

4 answers2024-06-26

Article 8 of the Marriage Law stipulates that a man and a woman who wish to marry must register their marriage in person at the marriage registration office. Where the provisions of this Law are met, they shall be registered and a marriage certificate shall be issued. Obtaining a marriage certificate establishes the relationship between husband and wife. Where marriage registration has not been completed, the registration shall be re-registered. >>>More