Example of filling out the construction safety score form

Updated on society 2024-06-16
3 answers
  1. Anonymous users2024-02-12

    The maximum score of the summary table is 100 points. The full score of each sub-checklist in the summary table should be: 10 points for safety management, 20 points for civilized construction, 10 points for scaffolding, 10 points for foundation pit support and formwork engineering, 10 points for "three treasures" and "four mouths" protection, 10 points for construction electricity for source water, 10 points for material hoist and external elevator, 10 points for tower cranes, 5 points for lifting and hoisting and 5 points for construction equipment.

    The take-home score of the sub-item in the Hail Rental Front Summary Table shall be calculated as follows:

    In the summary table, the actual score of each sub-item = (the full score value of the item in the summary table x the actual score of the examination score sheet) 100

    In the event of any deficiencies in the inspection, the total score of the summary table shall be converted as follows:

    In case of missing items, the total score of the summary table = (the sum of the corresponding actual score values of the actual items in the summary table x the sum of the full scores of the actual items in the summary table) x 100

    Note: The total score of the summary table should be the sum of the take-home scores of each sub-item in the table.

  2. Anonymous users2024-02-11

    Summary. Hello, it is a pleasure to serve you. How to calculate the score after the summary of the construction safety inspection score summary table Hello, the pro-construction safety inspection score summary table adopts a 100-point scoring system, and the content of each sub-item accounts for the proportion of the score in the summary table, according to the statistical analysis results of the type of accident due to work, and considering the simple calculation of the score, the civilized construction sub-item is set at 20 points, and the lifting and hoisting, construction machinery and tools sub-item is set at 5 points, and the other sub-items are determined to be 10 points.

    Hello, it is a pleasure to serve you. How to calculate the score after the summary of the construction safety inspection score summary table Hello, the pro-construction safety inspection score summary table adopts a 100-point scoring system, and the content of each sub-item accounts for the proportion of the score in the general table of the Zheng Duan, according to the statistical analysis results of the type of accident due to work, and considering the simplicity of the calculation of the score, the civilized construction Congshen sub-item is set at 20 points, and the lifting and hoisting, construction machinery and tools sub-item is set at 5 points, and the other sub-items are determined to be 10 points.

    The actual dispersion value of each sub-item in the check scoring summary table should be calculated as follows: a1 = b * c 100 formula: a1 - the actual score value of each sub-item in the summary table; b—the full score of the item in the summary table; c—The actual score value of the check score sheet.

    The actual score of each sub-item in the summary table = the full score value of the item in the summary table The actual score of the inspection score table 100 The total score of the summary table should be the sum of the actual scores of each sub-item in the table, and the total score of the summary table = (the sum of the actual score of the actual items in the summary table according to the sum of the corresponding actual score values in the summary table, and the sum of the full scores of the actual items in the summary table of the letter draft) 100

    In the sub-examination score sheet, the maximum score is 100 points. The score of each inspection item in the table shall be the sum of the scores obtained according to the specified inspection content. The total score of each table should be the sum of the take-home scores of each test item in the respective table.

    In the inspection score, when there are multiple scaffolding, tower cranes, dragon sedan gantries and tic-tac-toe frames, etc., the filial piety score should be the arithmetic average of the actual scores of each individual item. The inspection score must not be negative. The total number of points deducted for each item shall not exceed the number of points deducted for that item.

    In the inspection score, this check score sheet should not be scored when one of the assurance items is not scored or the subtotal score of the guarantee item is less than 40 points.

  3. Anonymous users2024-02-10

    Summary. There are a total of 19 items in the security inspection score summary table

    Table A Summary of Construction Safety Inspection Scores.

    Table Security Management Check Score Sheet.

    Table Civilized Construction Inspection Score Form.

    Table Fastener type steel pipe scaffolding inspection score form.

    Table Gantry Steel Pipe Scaffolding Inspection Score Sheet.

    Table Bowl buckle steel pipe scaffolding inspection score form.

    Table Socket type disc buckle steel pipe scaffold inspection score table.

    Table Full House Scaffolding Inspection Score Sheet.

    Table Cantilevered Scaffolding Inspection Score Sheet.

    Table Attached Lifting Scaffolding Inspection Score Sheet.

    Table Gondola Inspection Score Form for Work at Height.

    Table Foundation pit engineering inspection score form.

    Table Formwork Bracket Inspection Score Sheet.

    Table Assignment at Height Check Score Sheet.

    Table Construction Electricity Inspection Score Form.

    Table Material Hoist Inspection Score Sheet.

    Table Construction Hoist Inspection Score Sheet.

    Table Tower Crane Inspection Score Sheet.

    Table Lifting and hoisting inspection score sheet.

    Table: Construction Machinery Inspection Score Sheet, etc.

    How to calculate the score after the construction safety inspection score summary table is summarized.

    Hello, I am inquiring for you here, please wait a while, I will reply to you immediately Hello, I am happy to answer for you, check the actual score value of each sub-item in the summary table of the branch mess score should be calculated as follows: a1=b*c 100 Where: a1 - the actual score value of each sub-item in the summary table; b—the full score of the item in the summary table; c—The actual score value of the check score sheet.

    There are a total of 19 items in the safety inspection score summary table: Table A Construction Safety Inspection Score Summary Table Safety Management Inspection Score Table Civilized Construction Inspection Score Table Fastener Steel Pipe Scaffold Inspection Score Table Portal Steel Pipe Scaffold Inspection Score Table Bowl Buckle Steel Pipe Scaffold Inspection Score Table Socket Type Disc Buckle Steel Pipe Qier Scaffold Inspection Score Table Full Scaffolding Inspection and Evaluation Score Table Cantilevered Scaffolding Inspection Score Table Attached Lifting Scaffolding Inspection Score Table Hanging Basket Inspection Score Form for Aerial Work Foundation Pit Engineering Inspection Score Form Formwork Support Inspection Score Form Score Form for Aerial Operation Inspection Score Form Construction Electricity Inspection Score Form Material Hoist Inspection Score Form Construction Lift Inspection Score Form Tower Crane Inspection Score Form Lifting and Hoisting Inspection Score Form Construction Machinery Inspection Score Sheet, etc.

Related questions
7 answers2024-06-16

The scoring of each score sheet shall comply with the following requirements:1 >>>More

8 answers2024-06-16

Sign up for free on the "Tiangong Network".

2 answers2024-06-16

Rainy season safety construction measures:

1. Arrange work and rest time reasonably. In summer, the construction time should be compressed to both ends as much as possible, avoid the high temperature at noon, and stop outdoor operations when the temperature exceeds 37, and there should be ventilation and cooling measures when working indoors. In case of heavy stormy weather, all operations should be stopped and personnel should be evacuated to a safe place. >>>More

6 answers2024-06-16

1. When the welder is working, he should wear work clothes, insulated shoes, welding gloves and shoe covers, and protective sunglasses. When the site is wet, stand on a dry wooden board or rubber mat. >>>More

3 answers2024-06-16

Legal Analysis: Evaluation criteria, also known as judging criteria, refer to the value scales and boundaries that people apply to objects in evaluation activities. The objectivity factor of evaluation is an important basis for the scientific nature of evaluation criteria. >>>More